메뉴 건너뛰기




Volumn 205, Issue 1, 2008, Pages 148-158

Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time

Author keywords

Fuzzy sets; Genetic algorithm; Job shop scheduling; Makespan; Particle swarm optimization (PSO); Processing time

Indexed keywords

ALGORITHMS; ANIMAL CELL CULTURE; APPLICATIONS; BENCHMARKING; BOOLEAN FUNCTIONS; FUZZY RULES; FUZZY SETS; GENETIC ALGORITHMS; NUCLEAR PROPULSION; OPTIMIZATION; POPULATION STATISTICS; PROBLEM SOLVING; SCHEDULING; SET THEORY;

EID: 54049092772     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2008.05.086     Document Type: Article
Times cited : (118)

References (37)
  • 7
    • 0031268178 scopus 로고    scopus 로고
    • Job shop scheduling with imprecise durations: a fuzzy approach
    • Fortemps P. Job shop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions on Fuzzy Systems 5 4 (1997) 557-569
    • (1997) IEEE Transactions on Fuzzy Systems , vol.5 , Issue.4 , pp. 557-569
    • Fortemps, P.1
  • 9
    • 0003430214 scopus 로고    scopus 로고
    • Slowinski R., and Hapke M. (Eds), Physica-Verlag, Heidelberg
    • In: Slowinski R., and Hapke M. (Eds). Scheduling Under Fuzziness (2000), Physica-Verlag, Heidelberg
    • (2000) Scheduling Under Fuzziness
  • 10
    • 0035369592 scopus 로고    scopus 로고
    • Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
    • Chanas S., and Kasperski A. Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates. Engineering Applications of Artificial Intelligence 143 (2001) 377-386
    • (2001) Engineering Applications of Artificial Intelligence , vol.143 , pp. 377-386
    • Chanas, S.1    Kasperski, A.2
  • 11
    • 0035215629 scopus 로고    scopus 로고
    • Real-time task scheduling with fuzzy deadlines and processing times
    • Litoiu M., and Tadei R. Real-time task scheduling with fuzzy deadlines and processing times. Fuzzy Sets and Systems 117 (2001) 35-45
    • (2001) Fuzzy Sets and Systems , vol.117 , pp. 35-45
    • Litoiu, M.1    Tadei, R.2
  • 12
    • 34548536632 scopus 로고    scopus 로고
    • Preference ratio-based maximum operator approximation and its application in fuzzy flow shop scheduling
    • Nezhad S.S., and Assadi R.G. Preference ratio-based maximum operator approximation and its application in fuzzy flow shop scheduling. Applied Soft Computing 8 (2008) 759-766
    • (2008) Applied Soft Computing , vol.8 , pp. 759-766
    • Nezhad, S.S.1    Assadi, R.G.2
  • 14
    • 54049098568 scopus 로고    scopus 로고
    • R.M. Kerr, W. Slany, Research issues and challenges in fuzzy scheduling. Christian Doppler Laboratory for Expert Systems Tech, University Vienna, Vienna, Austria, CD-Tech. Rep. 94-68, 1994.
    • R.M. Kerr, W. Slany, Research issues and challenges in fuzzy scheduling. Christian Doppler Laboratory for Expert Systems Tech, University Vienna, Vienna, Austria, CD-Tech. Rep. 94-68, 1994.
  • 15
    • 0029517385 scopus 로고    scopus 로고
    • R. Eberhart, J. Kennedy, A new optimizer using particle swarm theory, in: Proceedings of the Sixth International Symposium on Micro Machine and Human Science, Nagoya, Japan, 1995, pp. 39-43.
    • R. Eberhart, J. Kennedy, A new optimizer using particle swarm theory, in: Proceedings of the Sixth International Symposium on Micro Machine and Human Science, Nagoya, Japan, 1995, pp. 39-43.
  • 16
    • 26844447786 scopus 로고    scopus 로고
    • Discrete particle swarm optimization, illustrated by the traveling salesman problem
    • Springer, Heidelberg, Germany
    • Clerc M. Discrete particle swarm optimization, illustrated by the traveling salesman problem. New Optimization Techniques in Engineering (2004), Springer, Heidelberg, Germany 219-239
    • (2004) New Optimization Techniques in Engineering , pp. 219-239
    • Clerc, M.1
  • 18
    • 33845737026 scopus 로고    scopus 로고
    • A similar particle swarm optimization algorithm for job-shop scheduling to minimize makespan
    • Lian Z., Gu X., and Jiao B. A similar particle swarm optimization algorithm for job-shop scheduling to minimize makespan. Applied Mathematics and Computation 183 (2006) 1008-1017
    • (2006) Applied Mathematics and Computation , vol.183 , pp. 1008-1017
    • Lian, Z.1    Gu, X.2    Jiao, B.3
  • 19
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    • Wei X.J., and Wu Z.M. An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems. Computers and Industrial Engineering 48 (2005) 409-425
    • (2005) Computers and Industrial Engineering , vol.48 , pp. 409-425
    • Wei, X.J.1    Wu, Z.M.2
  • 20
    • 33644897888 scopus 로고    scopus 로고
    • A similar particle swarm optimization algorithm for permutation flow shop scheduling to minimize makespan
    • Lian Z., Gu X., and Jiao B. A similar particle swarm optimization algorithm for permutation flow shop scheduling to minimize makespan. Applied Mathematics and Computation 175 (2006) 773-785
    • (2006) Applied Mathematics and Computation , vol.175 , pp. 773-785
    • Lian, Z.1    Gu, X.2    Jiao, B.3
  • 22
    • 0019585325 scopus 로고
    • A procedure for ordering fuzzy subsets of the unit interval
    • Yager R.R. A procedure for ordering fuzzy subsets of the unit interval. Information Sciences 24 (1981) 143-161
    • (1981) Information Sciences , vol.24 , pp. 143-161
    • Yager, R.R.1
  • 23
    • 0020813415 scopus 로고
    • Ranking fuzzy numbers in the setting of possibility theory
    • Dubois D., and Prade H. Ranking fuzzy numbers in the setting of possibility theory. Information Sciences 30 (1983) 183-224
    • (1983) Information Sciences , vol.30 , pp. 183-224
    • Dubois, D.1    Prade, H.2
  • 24
    • 2442429010 scopus 로고
    • Ranking fuzzy numbers with maximizing set and minimizing set
    • Chen S.H. Ranking fuzzy numbers with maximizing set and minimizing set. Fuzzy Sets and Systems 17 (1985) 113-129
    • (1985) Fuzzy Sets and Systems , vol.17 , pp. 113-129
    • Chen, S.H.1
  • 25
    • 0001130859 scopus 로고
    • Comparison of fuzzy numbers based on the probability measure of fuzzy events
    • Lee E.S., and Li R.J. Comparison of fuzzy numbers based on the probability measure of fuzzy events. Computers and Mathematics with Applications 15 (1988) 887-896
    • (1988) Computers and Mathematics with Applications , vol.15 , pp. 887-896
    • Lee, E.S.1    Li, R.J.2
  • 26
    • 0344234485 scopus 로고    scopus 로고
    • Y. Zheng, L. Ma, L. Zhang, J. Qian, Robust PID controller design using particle swarm optimizer, in: IEEE International Symposium on Intelligence Control, 2003, pp. 974-979.
    • Y. Zheng, L. Ma, L. Zhang, J. Qian, Robust PID controller design using particle swarm optimizer, in: IEEE International Symposium on Intelligence Control, 2003, pp. 974-979.
  • 27
    • 0036749163 scopus 로고    scopus 로고
    • Optimal design of power system stabilizers using particle swarm optimization
    • Abido M. Optimal design of power system stabilizers using particle swarm optimization. IEEE Transaction on Energy Conversion 17 3 (2002) 406-413
    • (2002) IEEE Transaction on Energy Conversion , vol.17 , Issue.3 , pp. 406-413
    • Abido, M.1
  • 28
    • 0036589139 scopus 로고    scopus 로고
    • The particle swarm optimization algorithm in size and shape optimization
    • Fourie P., and Groenwold A. The particle swarm optimization algorithm in size and shape optimization. Structural and Multidisciplinary Optimization 23 4 (2002) 259-267
    • (2002) Structural and Multidisciplinary Optimization , vol.23 , Issue.4 , pp. 259-267
    • Fourie, P.1    Groenwold, A.2
  • 31
    • 33847305865 scopus 로고    scopus 로고
    • Distribution-based adaptive bounding genetic algorithm for continuous optimisation problems
    • Peng J., Li K., Thompson S., and Wieringa P.A. Distribution-based adaptive bounding genetic algorithm for continuous optimisation problems. Applied Mathematics and Computation 185 (2007) 1063-1077
    • (2007) Applied Mathematics and Computation , vol.185 , pp. 1063-1077
    • Peng, J.1    Li, K.2    Thompson, S.3    Wieringa, P.A.4
  • 34
    • 15844383855 scopus 로고    scopus 로고
    • A bi-criteria optimization: minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems
    • Omar A.G. A bi-criteria optimization: minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems. Applied Soft Computing 2 (2003) 197-210
    • (2003) Applied Soft Computing , vol.2 , pp. 197-210
    • Omar, A.G.1
  • 36
    • 54049087536 scopus 로고    scopus 로고
    • S. Lawrence, Supplement to Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Technique, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, USA, 1984.
    • S. Lawrence, Supplement to Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Technique, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, USA, 1984.
  • 37
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job-shop scheduling
    • Adams J., Balas E., and Zawack D. The shifting bottleneck procedure for job-shop scheduling. Management Science 34 (1988) 391-401
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.