메뉴 건너뛰기




Volumn 21, Issue 6, 2008, Pages 579-588

Partial stroke testing of process shutdown valves: How to determine the test coverage

Author keywords

Functional testing; High integrity pressure protection system; Partial stroke testing; PST coverage; Safety instrumented system

Indexed keywords

TESTING;

EID: 52049112755     PISSN: 09504230     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jlp.2008.04.007     Document Type: Article
Times cited : (44)

References (37)
  • 1
    • 85055045523 scopus 로고    scopus 로고
    • Aarø, R., Lund, B. F., & Onshus, T. (1995). Subsea HIPPS design procedure (Paper OTC 7829). In Offshore technology conference (OTC) proceedings, Houston, TX.
    • Aarø, R., Lund, B. F., & Onshus, T. (1995). Subsea HIPPS design procedure (Paper OTC 7829). In Offshore technology conference (OTC) proceedings, Houston, TX.
  • 2
    • 23844446253 scopus 로고    scopus 로고
    • Ali, R. (2004). Problems, concerns and possible solutions for testing (and diagnostics coverage) of final control element of SIF loops. Technical papers of ISA, 454, 995-1002.
    • Ali, R. (2004). Problems, concerns and possible solutions for testing (and diagnostics coverage) of final control element of SIF loops. Technical papers of ISA, 454, 995-1002.
  • 3
    • 6344272890 scopus 로고    scopus 로고
    • Ali, R., & Goble, W. (2004). Smart positioners to predict health of ESD valves. In Proceedings of the annual symposium on instrumentation for the process industries (pp. 29-37), Exida, Sellersville, PA.
    • Ali, R., & Goble, W. (2004). Smart positioners to predict health of ESD valves. In Proceedings of the annual symposium on instrumentation for the process industries (pp. 29-37), Exida, Sellersville, PA.
  • 4
    • 2642520476 scopus 로고    scopus 로고
    • Reliability and asset management: Smart positioners in safety instrumented systems
    • Ali R., and Jero L. Reliability and asset management: Smart positioners in safety instrumented systems. Petroleum Technology Quarterly 8 1 (2003) 137-140
    • (2003) Petroleum Technology Quarterly , vol.8 , Issue.1 , pp. 137-140
    • Ali, R.1    Jero, L.2
  • 5
    • 52049104535 scopus 로고    scopus 로고
    • ANSI/ISA 84.01 (1996). Application of safety instrumented systems for the process industries. Research Triangle Park, NC: The Instrumentation, Systems and Automation Society (ISA).
    • ANSI/ISA 84.01 (1996). Application of safety instrumented systems for the process industries. Research Triangle Park, NC: The Instrumentation, Systems and Automation Society (ISA).
  • 6
    • 52049115270 scopus 로고    scopus 로고
    • Bak, L., Sirevaag, R., & Stokke, H. (2006). Experience with the HPHT subsea HIPPS on Kristin. In Deep offshore technology-conference and Exhibition, 28-30 November 2006, Houston, TX.
    • Bak, L., Sirevaag, R., & Stokke, H. (2006). Experience with the HPHT subsea HIPPS on Kristin. In Deep offshore technology-conference and Exhibition, 28-30 November 2006, Houston, TX.
  • 7
    • 52049096262 scopus 로고    scopus 로고
    • CCPS (2007). Guidelines for safe and reliable instrumented protective systems. Hoboken, New Jersey: Wiley and Center for Chemical Process Safety, AIChE.
    • CCPS (2007). Guidelines for safe and reliable instrumented protective systems. Hoboken, New Jersey: Wiley and Center for Chemical Process Safety, AIChE.
  • 9
    • 52049122938 scopus 로고    scopus 로고
    • Houtermans, I. J. M., Rouvroye, J. L., & Karydas, D. M. (2004). Risk reduction through partial stroke testing. In Probabilistic safety assessment and management (PSAM7-ESREL'04). Springer.
    • Houtermans, I. J. M., Rouvroye, J. L., & Karydas, D. M. (2004). Risk reduction through partial stroke testing. In Probabilistic safety assessment and management (PSAM7-ESREL'04). Springer.
  • 10
    • 52049085366 scopus 로고    scopus 로고
    • IEC 61508 (1998). Functional safety of electrical/electronic/programmable electronic safety-related systems. Geneva: International Electrotechnical Commission.
    • IEC 61508 (1998). Functional safety of electrical/electronic/programmable electronic safety-related systems. Geneva: International Electrotechnical Commission.
  • 11
    • 52049105265 scopus 로고    scopus 로고
    • IEC 61511 (2003). Functional safety-safety instrumented systems for the process industry. Geneva: International Electrotechnical Commission.
    • IEC 61511 (2003). Functional safety-safety instrumented systems for the process industry. Geneva: International Electrotechnical Commission.
  • 12
    • 52049089034 scopus 로고    scopus 로고
    • ISA-TR 84.00.02 (2002). Safety instrumented functions SIF-safety integrity level (SIL) evaluation techniques Part 4: Determining the SIL of a SIF via Markov Analysis. Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
    • ISA-TR 84.00.02 (2002). Safety instrumented functions SIF-safety integrity level (SIL) evaluation techniques Part 4: Determining the SIL of a SIF via Markov Analysis. Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
  • 13
    • 52049087004 scopus 로고    scopus 로고
    • ISA-TR 84.00.03 (2002). Guidance for Testing of Process Sector Safety Instrumented Functions (SIF) Implemented as or within Safety Instrumented Systems (SIS). Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
    • ISA-TR 84.00.03 (2002). Guidance for Testing of Process Sector Safety Instrumented Functions (SIF) Implemented as or within Safety Instrumented Systems (SIS). Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
  • 14
    • 52049107222 scopus 로고    scopus 로고
    • Johnsen, S. O., Bjørkli, C., Steiro, T., Fartum, F., Haukenes, H., & Ramberg, J. (2004). CRIOP: A scenario method for crisis intervention and operability analysis. Technical Report STF38 A03424, SINTEF, Trondheim, Norway.
    • Johnsen, S. O., Bjørkli, C., Steiro, T., Fartum, F., Haukenes, H., & Ramberg, J. (2004). CRIOP: A scenario method for crisis intervention and operability analysis. Technical Report STF38 A03424, SINTEF, Trondheim, Norway.
  • 15
    • 23844489633 scopus 로고    scopus 로고
    • Safety-PLC's striking role for partial valve stroke testing
    • Knegtering B. Safety-PLC's striking role for partial valve stroke testing. Technical Papers of ISA 454 (2004) 563-572
    • (2004) Technical Papers of ISA , vol.454 , pp. 563-572
    • Knegtering, B.1
  • 16
    • 52049096261 scopus 로고    scopus 로고
    • Safe failures impact on safety instrumented systems
    • Aven T., and Vinnem J. (Eds), Taylor & Francis
    • Langeron Y., Barros A., Grall A., and Berenguer C. Safe failures impact on safety instrumented systems. In: Aven T., and Vinnem J. (Eds). Risk, reliability, and societal safety (2007), Taylor & Francis 641-648
    • (2007) Risk, reliability, and societal safety , pp. 641-648
    • Langeron, Y.1    Barros, A.2    Grall, A.3    Berenguer, C.4
  • 17
    • 52049113764 scopus 로고    scopus 로고
    • Lund, B. F., Onshus, T. E., & Aarø, R. (1995). HIPPS concepts for subsea field scenario (Paper OTC 7830). In Offshore technology conference (OTC) Proceedings, Houston, TX.
    • Lund, B. F., Onshus, T. E., & Aarø, R. (1995). HIPPS concepts for subsea field scenario (Paper OTC 7830). In Offshore technology conference (OTC) Proceedings, Houston, TX.
  • 18
    • 56149095230 scopus 로고    scopus 로고
    • The effect of partial stroke testing on the reliability of safety valves
    • Aven T., and Vinnem J. (Eds), Taylor & Francis
    • Lundteigen M.A., and Rausand M. The effect of partial stroke testing on the reliability of safety valves. In: Aven T., and Vinnem J. (Eds). Risk, reliability and societal safety (2007), Taylor & Francis
    • (2007) Risk, reliability and societal safety
    • Lundteigen, M.A.1    Rausand, M.2
  • 19
    • 52049091353 scopus 로고    scopus 로고
    • Lundteigen, M. A. & Rausand, M. (2008). Architectural constraints in IEC 61508: Do they have the intended effect? Submitted for publication.
    • Lundteigen, M. A. & Rausand, M. (2008). Architectural constraints in IEC 61508: Do they have the intended effect? Submitted for publication.
  • 20
    • 33645714161 scopus 로고    scopus 로고
    • McCrea-Steele, R. (2005). Partial stroke testing implementing for the right reasons. In Technical Papers of ISA, vol. 459 (pp. 229-238). Research Triangle Park, NC.
    • McCrea-Steele, R. (2005). Partial stroke testing implementing for the right reasons. In Technical Papers of ISA, vol. 459 (pp. 229-238). Research Triangle Park, NC.
  • 21
    • 0346268840 scopus 로고    scopus 로고
    • Partial stroke testing simple or not?
    • Mostia Jr. B. Partial stroke testing simple or not?. Control (Chicago, Ill) 16 11 (2003) 63-69
    • (2003) Control (Chicago, Ill) , vol.16 , Issue.11 , pp. 63-69
    • Mostia Jr., B.1
  • 22
    • 52049121358 scopus 로고    scopus 로고
    • Mostia, W. L. (2002). Testing of SIS valves. Technical report, http://www.sipi61508.com/ciks/mostia2.pdf.
    • Mostia, W. L. (2002). Testing of SIS valves. Technical report, http://www.sipi61508.com/ciks/mostia2.pdf.
  • 23
    • 52049104292 scopus 로고    scopus 로고
    • Nuis, W.-J. (2005). Partial stroking on fast acting applications. In Proceedings from the TÜV Rheinland group's symposium, June 9th, Cleveland, OH, USA.
    • Nuis, W.-J. (2005). Partial stroking on fast acting applications. In Proceedings from the TÜV Rheinland group's symposium, June 9th, Cleveland, OH, USA.
  • 24
    • 52049087426 scopus 로고    scopus 로고
    • Onshus, T. E., Aarø, R., & Lund, B. F. (1995). HIPPS applications and acceptance criteria Paper OTC 7828. In Offshore technology conference (OTC) proceedings, Houston, TX.
    • Onshus, T. E., Aarø, R., & Lund, B. F. (1995). HIPPS applications and acceptance criteria Paper OTC 7828. In Offshore technology conference (OTC) proceedings, Houston, TX.
  • 25
    • 52049086096 scopus 로고    scopus 로고
    • OREDA (1997). OREDA reliability data (3rd ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
    • OREDA (1997). OREDA reliability data (3rd ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
  • 26
    • 52049092620 scopus 로고    scopus 로고
    • OREDA (2002). OREDA reliability data (4th ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
    • OREDA (2002). OREDA reliability data (4th ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
  • 28
    • 52049084220 scopus 로고    scopus 로고
    • Signoret, J.-P. (2007). High integrity pressure protection systems (HIPPS)-making SIL calculations effective. Exploration and production-oil and gas review (OTC edition) (pp. 14-17).
    • Signoret, J.-P. (2007). High integrity pressure protection systems (HIPPS)-making SIL calculations effective. Exploration and production-oil and gas review (OTC edition) (pp. 14-17).
  • 29
    • 52049105028 scopus 로고    scopus 로고
    • SINTEF (2006). Reliability prediction methods for safety instrumented systems, PDS method handbook. Trondheim, Norway: SINTEF.
    • SINTEF (2006). Reliability prediction methods for safety instrumented systems, PDS method handbook. Trondheim, Norway: SINTEF.
  • 30
    • 1542377688 scopus 로고    scopus 로고
    • Summers, A. E. (2003). Flare reduction with high integrity protection systems (HIPS). In ISA technical papers, volume 438, Research Triangle Park, NC. The Instrumentation, Systems, and Automation Society (ISA).
    • Summers, A. E. (2003). Flare reduction with high integrity protection systems (HIPS). In ISA technical papers, volume 438, Research Triangle Park, NC. The Instrumentation, Systems, and Automation Society (ISA).
  • 31
    • 0033283965 scopus 로고    scopus 로고
    • Common cause and common sense, designing failure out of your safety instrumented systems (SIS)
    • Summers A., and Raney G. Common cause and common sense, designing failure out of your safety instrumented systems (SIS). ISA Transactions 38 3 (1999) 291-299
    • (1999) ISA Transactions , vol.38 , Issue.3 , pp. 291-299
    • Summers, A.1    Raney, G.2
  • 33
    • 0034316710 scopus 로고    scopus 로고
    • Partial-stroke testing of safety block valves
    • Summers A., and Zachary B. Partial-stroke testing of safety block valves. Control Engineering 47 12 (2000) 87-89
    • (2000) Control Engineering , vol.47 , Issue.12 , pp. 87-89
    • Summers, A.1    Zachary, B.2
  • 34
    • 0036771942 scopus 로고    scopus 로고
    • Improve facility SIS performance and reliability
    • Summers A., and Zachary B. Improve facility SIS performance and reliability. Hydrocarbon Processing 81 (2002) 71-74
    • (2002) Hydrocarbon Processing , vol.81 , pp. 71-74
    • Summers, A.1    Zachary, B.2
  • 35
    • 6344274699 scopus 로고    scopus 로고
    • Summers, A. & Zachary, B. (2004). High integrity protection systems. In Proceedings of the annual symposium on instrumentation for the process industries, vol. 488, pp. 49-59.
    • Summers, A. & Zachary, B. (2004). High integrity protection systems. In Proceedings of the annual symposium on instrumentation for the process industries, vol. 488, pp. 49-59.
  • 36
    • 33746892605 scopus 로고    scopus 로고
    • The effect of diagnostic and periodic proof testing on the availability of programmable safety systems
    • Velten-Philipp W., and Houtermans M. The effect of diagnostic and periodic proof testing on the availability of programmable safety systems. WSEAS Transactions on Systems 5 8 (2006) 1861-1867
    • (2006) WSEAS Transactions on Systems , vol.5 , Issue.8 , pp. 1861-1867
    • Velten-Philipp, W.1    Houtermans, M.2
  • 37
    • 0030651201 scopus 로고    scopus 로고
    • Walker, A. (1997). Quality management applied to the development of a national checklist for ISO 9001 audits for software. In Proceedings of the IEEE international software engineering standards symposium (pp. 6-14).
    • Walker, A. (1997). Quality management applied to the development of a national checklist for ISO 9001 audits for software. In Proceedings of the IEEE international software engineering standards symposium (pp. 6-14).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.