-
1
-
-
85055045523
-
-
Aarø, R., Lund, B. F., & Onshus, T. (1995). Subsea HIPPS design procedure (Paper OTC 7829). In Offshore technology conference (OTC) proceedings, Houston, TX.
-
Aarø, R., Lund, B. F., & Onshus, T. (1995). Subsea HIPPS design procedure (Paper OTC 7829). In Offshore technology conference (OTC) proceedings, Houston, TX.
-
-
-
-
2
-
-
23844446253
-
-
Ali, R. (2004). Problems, concerns and possible solutions for testing (and diagnostics coverage) of final control element of SIF loops. Technical papers of ISA, 454, 995-1002.
-
Ali, R. (2004). Problems, concerns and possible solutions for testing (and diagnostics coverage) of final control element of SIF loops. Technical papers of ISA, 454, 995-1002.
-
-
-
-
3
-
-
6344272890
-
-
Ali, R., & Goble, W. (2004). Smart positioners to predict health of ESD valves. In Proceedings of the annual symposium on instrumentation for the process industries (pp. 29-37), Exida, Sellersville, PA.
-
Ali, R., & Goble, W. (2004). Smart positioners to predict health of ESD valves. In Proceedings of the annual symposium on instrumentation for the process industries (pp. 29-37), Exida, Sellersville, PA.
-
-
-
-
4
-
-
2642520476
-
Reliability and asset management: Smart positioners in safety instrumented systems
-
Ali R., and Jero L. Reliability and asset management: Smart positioners in safety instrumented systems. Petroleum Technology Quarterly 8 1 (2003) 137-140
-
(2003)
Petroleum Technology Quarterly
, vol.8
, Issue.1
, pp. 137-140
-
-
Ali, R.1
Jero, L.2
-
5
-
-
52049104535
-
-
ANSI/ISA 84.01 (1996). Application of safety instrumented systems for the process industries. Research Triangle Park, NC: The Instrumentation, Systems and Automation Society (ISA).
-
ANSI/ISA 84.01 (1996). Application of safety instrumented systems for the process industries. Research Triangle Park, NC: The Instrumentation, Systems and Automation Society (ISA).
-
-
-
-
6
-
-
52049115270
-
-
Bak, L., Sirevaag, R., & Stokke, H. (2006). Experience with the HPHT subsea HIPPS on Kristin. In Deep offshore technology-conference and Exhibition, 28-30 November 2006, Houston, TX.
-
Bak, L., Sirevaag, R., & Stokke, H. (2006). Experience with the HPHT subsea HIPPS on Kristin. In Deep offshore technology-conference and Exhibition, 28-30 November 2006, Houston, TX.
-
-
-
-
7
-
-
52049096262
-
-
CCPS (2007). Guidelines for safe and reliable instrumented protective systems. Hoboken, New Jersey: Wiley and Center for Chemical Process Safety, AIChE.
-
CCPS (2007). Guidelines for safe and reliable instrumented protective systems. Hoboken, New Jersey: Wiley and Center for Chemical Process Safety, AIChE.
-
-
-
-
8
-
-
11044235918
-
-
The Instrumentation, Systems and Automation Society (ISA), Research Triangle Park, NC
-
Goble W.M., and Cheddie H. Safety instrumented systems verification: Practical probabilistic calculations (2005), The Instrumentation, Systems and Automation Society (ISA), Research Triangle Park, NC
-
(2005)
Safety instrumented systems verification: Practical probabilistic calculations
-
-
Goble, W.M.1
Cheddie, H.2
-
9
-
-
52049122938
-
-
Houtermans, I. J. M., Rouvroye, J. L., & Karydas, D. M. (2004). Risk reduction through partial stroke testing. In Probabilistic safety assessment and management (PSAM7-ESREL'04). Springer.
-
Houtermans, I. J. M., Rouvroye, J. L., & Karydas, D. M. (2004). Risk reduction through partial stroke testing. In Probabilistic safety assessment and management (PSAM7-ESREL'04). Springer.
-
-
-
-
10
-
-
52049085366
-
-
IEC 61508 (1998). Functional safety of electrical/electronic/programmable electronic safety-related systems. Geneva: International Electrotechnical Commission.
-
IEC 61508 (1998). Functional safety of electrical/electronic/programmable electronic safety-related systems. Geneva: International Electrotechnical Commission.
-
-
-
-
11
-
-
52049105265
-
-
IEC 61511 (2003). Functional safety-safety instrumented systems for the process industry. Geneva: International Electrotechnical Commission.
-
IEC 61511 (2003). Functional safety-safety instrumented systems for the process industry. Geneva: International Electrotechnical Commission.
-
-
-
-
12
-
-
52049089034
-
-
ISA-TR 84.00.02 (2002). Safety instrumented functions SIF-safety integrity level (SIL) evaluation techniques Part 4: Determining the SIL of a SIF via Markov Analysis. Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
-
ISA-TR 84.00.02 (2002). Safety instrumented functions SIF-safety integrity level (SIL) evaluation techniques Part 4: Determining the SIL of a SIF via Markov Analysis. Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
-
-
-
-
13
-
-
52049087004
-
-
ISA-TR 84.00.03 (2002). Guidance for Testing of Process Sector Safety Instrumented Functions (SIF) Implemented as or within Safety Instrumented Systems (SIS). Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
-
ISA-TR 84.00.03 (2002). Guidance for Testing of Process Sector Safety Instrumented Functions (SIF) Implemented as or within Safety Instrumented Systems (SIS). Technical report, The Instrumentation, Systems, and Automation Society, Research Triangle Park, NC.
-
-
-
-
14
-
-
52049107222
-
-
Johnsen, S. O., Bjørkli, C., Steiro, T., Fartum, F., Haukenes, H., & Ramberg, J. (2004). CRIOP: A scenario method for crisis intervention and operability analysis. Technical Report STF38 A03424, SINTEF, Trondheim, Norway.
-
Johnsen, S. O., Bjørkli, C., Steiro, T., Fartum, F., Haukenes, H., & Ramberg, J. (2004). CRIOP: A scenario method for crisis intervention and operability analysis. Technical Report STF38 A03424, SINTEF, Trondheim, Norway.
-
-
-
-
15
-
-
23844489633
-
Safety-PLC's striking role for partial valve stroke testing
-
Knegtering B. Safety-PLC's striking role for partial valve stroke testing. Technical Papers of ISA 454 (2004) 563-572
-
(2004)
Technical Papers of ISA
, vol.454
, pp. 563-572
-
-
Knegtering, B.1
-
16
-
-
52049096261
-
Safe failures impact on safety instrumented systems
-
Aven T., and Vinnem J. (Eds), Taylor & Francis
-
Langeron Y., Barros A., Grall A., and Berenguer C. Safe failures impact on safety instrumented systems. In: Aven T., and Vinnem J. (Eds). Risk, reliability, and societal safety (2007), Taylor & Francis 641-648
-
(2007)
Risk, reliability, and societal safety
, pp. 641-648
-
-
Langeron, Y.1
Barros, A.2
Grall, A.3
Berenguer, C.4
-
17
-
-
52049113764
-
-
Lund, B. F., Onshus, T. E., & Aarø, R. (1995). HIPPS concepts for subsea field scenario (Paper OTC 7830). In Offshore technology conference (OTC) Proceedings, Houston, TX.
-
Lund, B. F., Onshus, T. E., & Aarø, R. (1995). HIPPS concepts for subsea field scenario (Paper OTC 7830). In Offshore technology conference (OTC) Proceedings, Houston, TX.
-
-
-
-
18
-
-
56149095230
-
The effect of partial stroke testing on the reliability of safety valves
-
Aven T., and Vinnem J. (Eds), Taylor & Francis
-
Lundteigen M.A., and Rausand M. The effect of partial stroke testing on the reliability of safety valves. In: Aven T., and Vinnem J. (Eds). Risk, reliability and societal safety (2007), Taylor & Francis
-
(2007)
Risk, reliability and societal safety
-
-
Lundteigen, M.A.1
Rausand, M.2
-
19
-
-
52049091353
-
-
Lundteigen, M. A. & Rausand, M. (2008). Architectural constraints in IEC 61508: Do they have the intended effect? Submitted for publication.
-
Lundteigen, M. A. & Rausand, M. (2008). Architectural constraints in IEC 61508: Do they have the intended effect? Submitted for publication.
-
-
-
-
20
-
-
33645714161
-
-
McCrea-Steele, R. (2005). Partial stroke testing implementing for the right reasons. In Technical Papers of ISA, vol. 459 (pp. 229-238). Research Triangle Park, NC.
-
McCrea-Steele, R. (2005). Partial stroke testing implementing for the right reasons. In Technical Papers of ISA, vol. 459 (pp. 229-238). Research Triangle Park, NC.
-
-
-
-
21
-
-
0346268840
-
Partial stroke testing simple or not?
-
Mostia Jr. B. Partial stroke testing simple or not?. Control (Chicago, Ill) 16 11 (2003) 63-69
-
(2003)
Control (Chicago, Ill)
, vol.16
, Issue.11
, pp. 63-69
-
-
Mostia Jr., B.1
-
22
-
-
52049121358
-
-
Mostia, W. L. (2002). Testing of SIS valves. Technical report, http://www.sipi61508.com/ciks/mostia2.pdf.
-
Mostia, W. L. (2002). Testing of SIS valves. Technical report, http://www.sipi61508.com/ciks/mostia2.pdf.
-
-
-
-
23
-
-
52049104292
-
-
Nuis, W.-J. (2005). Partial stroking on fast acting applications. In Proceedings from the TÜV Rheinland group's symposium, June 9th, Cleveland, OH, USA.
-
Nuis, W.-J. (2005). Partial stroking on fast acting applications. In Proceedings from the TÜV Rheinland group's symposium, June 9th, Cleveland, OH, USA.
-
-
-
-
24
-
-
52049087426
-
-
Onshus, T. E., Aarø, R., & Lund, B. F. (1995). HIPPS applications and acceptance criteria Paper OTC 7828. In Offshore technology conference (OTC) proceedings, Houston, TX.
-
Onshus, T. E., Aarø, R., & Lund, B. F. (1995). HIPPS applications and acceptance criteria Paper OTC 7828. In Offshore technology conference (OTC) proceedings, Houston, TX.
-
-
-
-
25
-
-
52049086096
-
-
OREDA (1997). OREDA reliability data (3rd ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
-
OREDA (1997). OREDA reliability data (3rd ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
-
-
-
-
26
-
-
52049092620
-
-
OREDA (2002). OREDA reliability data (4th ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
-
OREDA (2002). OREDA reliability data (4th ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
-
-
-
-
27
-
-
10644279458
-
-
Wiley, Hoboken, New Jersey
-
Rausand M., and Høyland A. System reliability theory: Models, statistical methods, and applications. 2nd ed. (2004), Wiley, Hoboken, New Jersey
-
(2004)
System reliability theory: Models, statistical methods, and applications. 2nd ed.
-
-
Rausand, M.1
Høyland, A.2
-
28
-
-
52049084220
-
-
Signoret, J.-P. (2007). High integrity pressure protection systems (HIPPS)-making SIL calculations effective. Exploration and production-oil and gas review (OTC edition) (pp. 14-17).
-
Signoret, J.-P. (2007). High integrity pressure protection systems (HIPPS)-making SIL calculations effective. Exploration and production-oil and gas review (OTC edition) (pp. 14-17).
-
-
-
-
29
-
-
52049105028
-
-
SINTEF (2006). Reliability prediction methods for safety instrumented systems, PDS method handbook. Trondheim, Norway: SINTEF.
-
SINTEF (2006). Reliability prediction methods for safety instrumented systems, PDS method handbook. Trondheim, Norway: SINTEF.
-
-
-
-
30
-
-
1542377688
-
-
Summers, A. E. (2003). Flare reduction with high integrity protection systems (HIPS). In ISA technical papers, volume 438, Research Triangle Park, NC. The Instrumentation, Systems, and Automation Society (ISA).
-
Summers, A. E. (2003). Flare reduction with high integrity protection systems (HIPS). In ISA technical papers, volume 438, Research Triangle Park, NC. The Instrumentation, Systems, and Automation Society (ISA).
-
-
-
-
31
-
-
0033283965
-
Common cause and common sense, designing failure out of your safety instrumented systems (SIS)
-
Summers A., and Raney G. Common cause and common sense, designing failure out of your safety instrumented systems (SIS). ISA Transactions 38 3 (1999) 291-299
-
(1999)
ISA Transactions
, vol.38
, Issue.3
, pp. 291-299
-
-
Summers, A.1
Raney, G.2
-
33
-
-
0034316710
-
Partial-stroke testing of safety block valves
-
Summers A., and Zachary B. Partial-stroke testing of safety block valves. Control Engineering 47 12 (2000) 87-89
-
(2000)
Control Engineering
, vol.47
, Issue.12
, pp. 87-89
-
-
Summers, A.1
Zachary, B.2
-
34
-
-
0036771942
-
Improve facility SIS performance and reliability
-
Summers A., and Zachary B. Improve facility SIS performance and reliability. Hydrocarbon Processing 81 (2002) 71-74
-
(2002)
Hydrocarbon Processing
, vol.81
, pp. 71-74
-
-
Summers, A.1
Zachary, B.2
-
35
-
-
6344274699
-
-
Summers, A. & Zachary, B. (2004). High integrity protection systems. In Proceedings of the annual symposium on instrumentation for the process industries, vol. 488, pp. 49-59.
-
Summers, A. & Zachary, B. (2004). High integrity protection systems. In Proceedings of the annual symposium on instrumentation for the process industries, vol. 488, pp. 49-59.
-
-
-
-
36
-
-
33746892605
-
The effect of diagnostic and periodic proof testing on the availability of programmable safety systems
-
Velten-Philipp W., and Houtermans M. The effect of diagnostic and periodic proof testing on the availability of programmable safety systems. WSEAS Transactions on Systems 5 8 (2006) 1861-1867
-
(2006)
WSEAS Transactions on Systems
, vol.5
, Issue.8
, pp. 1861-1867
-
-
Velten-Philipp, W.1
Houtermans, M.2
-
37
-
-
0030651201
-
-
Walker, A. (1997). Quality management applied to the development of a national checklist for ISO 9001 audits for software. In Proceedings of the IEEE international software engineering standards symposium (pp. 6-14).
-
Walker, A. (1997). Quality management applied to the development of a national checklist for ISO 9001 audits for software. In Proceedings of the IEEE international software engineering standards symposium (pp. 6-14).
-
-
-
|