-
1
-
-
23844446253
-
Problems, concerns and possible solutions for testing (and diagnostic coverage) of final control elements of SIF loops
-
Research Triangle Park, NC 27709, U.S.A. ISA, Instrumentation, Systems, and Automation Society
-
Ali, R. (2004). Problems, concerns and possible solutions for testing (and diagnostic coverage) of final control elements of SIF loops. In 4th Annual Emerging Technologies Conference, ISA EXPO 2004, October, Research Triangle Park, NC 27709, U.S.A. ISA - Instrumentation, Systems, and Automation Society.
-
(2004)
4th Annual Emerging Technologies Conference, ISA EXPO 2004, October
-
-
Ali, R.1
-
2
-
-
56149099908
-
-
Research Triangle Park, NC 27709, U.S.A. ISA, Instrumentation, Systems, and Automation Society
-
Ali, R. and W. Goble (2004). Smart positioners to predict health of ESD valves. Research Triangle Park, NC 27709, U.S.A. ISA - Instrumentation, Systems, and Automation Society.
-
(2004)
Smart positioners to predict health of ESD valves
-
-
Ali, R.1
Goble, W.2
-
3
-
-
56149108167
-
-
Bak, L., R. Sirevaag, and H. Stokke (2006, November). Experience with the HPHT subsea HIPPS on Kristin. In Deep Offshore Technology - Conference and Exibition, 28.-30.November 2006, Houston, Texas.
-
Bak, L., R. Sirevaag, and H. Stokke (2006, November). Experience with the HPHT subsea HIPPS on Kristin. In Deep Offshore Technology - Conference and Exibition, 28.-30.November 2006, Houston, Texas.
-
-
-
-
4
-
-
0033902909
-
Overview of IEC 61508. design of electrical/electronic/ programmable electronic safety-related systems
-
Brown, S. (2000). Overview of IEC 61508. design of electrical/electronic/ programmable electronic safety-related systems. Computing and Control Engineering Journal 11, 6-12.
-
(2000)
Computing and Control Engineering Journal
, vol.11
, pp. 6-12
-
-
Brown, S.1
-
5
-
-
15544385788
-
Safety integrity - more than hardware
-
Hoekstra, S. (2005). Safety integrity - more than hardware. Hydrocarbon Engineering 10(3), 79-82.
-
(2005)
Hydrocarbon Engineering
, vol.10
, Issue.3
, pp. 79-82
-
-
Hoekstra, S.1
-
6
-
-
0003615659
-
Functional safety of electrical/ electronic/programmable electronic safetyrelated systems
-
IEC 61508 , Geneva: International Electrotechnical Commission
-
IEC 61508 (1997). Functional safety of electrical/ electronic/programmable electronic safetyrelated systems. Geneva: International Electrotechnical Commission.
-
(1997)
-
-
-
7
-
-
0003931020
-
Functional safety - safety instrumented systems for the process industry
-
IEC 61511 , Geneva: International Electrotechnical Commission
-
IEC 61511 (2003). Functional safety - safety instrumented systems for the process industry. Geneva: International Electrotechnical Commission.
-
(2003)
-
-
-
8
-
-
56149109597
-
-
ISA (2002). Guidance for testing of process sector safety instrumented functions (SIF) implemented as or within safety instrumented systems (SIS). Number SA-TR84.00.03-2002. NC 27709, U.S.A.: ISA - Instrumentation, Systems, and Automation Society.
-
ISA (2002). Guidance for testing of process sector safety instrumented functions (SIF) implemented as or within safety instrumented systems (SIS). Number SA-TR84.00.03-2002. NC 27709, U.S.A.: ISA - Instrumentation, Systems, and Automation Society.
-
-
-
-
9
-
-
56149105068
-
-
Research Triangle Park, NC, U.S.A. ISA, Instrumentation, Systems, and Automation Society
-
Knegtering, B. (2004). Safety-PLC's striking role for partial valve stroke testing. Research Triangle Park, NC 277089, U.S.A. ISA - Instrumentation, Systems, and Automation Society.
-
(2004)
Safety-PLC's striking role for partial valve stroke testing
, pp. 277089
-
-
Knegtering, B.1
-
10
-
-
56149125277
-
Assessment of hardware safety integrity
-
Trondheim, Norway
-
Lundteigen, M.A. and M. Rausand (2006). Assessment of hardware safety integrity. In ESReDa Conference, Trondheim, Norway.
-
(2006)
ESReDa Conference
-
-
Lundteigen, M.A.1
Rausand, M.2
-
11
-
-
56149085004
-
-
Research Triangle Park, NC 27709, U.S.A. ISA, Instrumentation, Systems, and Automation Society
-
McCrea-Steele, R. (2005). Partial stroke testing implementation for the right reasons. Research Triangle Park, NC 27709, U.S.A. ISA - Instrumentation, Systems, and Automation Society.
-
(2005)
Partial stroke testing implementation for the right reasons
-
-
McCrea-Steele, R.1
-
13
-
-
56149108413
-
-
OREDA , 3rd ed, Available from: Det Norske Veritas, Høvik, Norway: OREDA Participants
-
OREDA (1997). OREDA Reliability Data (3rd ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
-
(1997)
OREDA Reliability Data
, Issue.1322
-
-
-
14
-
-
56149095917
-
-
OREDA , 4rd ed, Available from: Det Norske Veritas, Høvik, Norway: OREDA Participants
-
OREDA (2002). OREDA Reliability Data (4rd ed.). Available from: Det Norske Veritas, NO 1322 Høvik, Norway: OREDA Participants.
-
(2002)
OREDA Reliability Data
, Issue.1322
-
-
-
19
-
-
0034316710
-
Partial-stroke testing of safety block valves
-
Summers, A. and B. Zachary (2000). Partial-stroke testing of safety block valves. Control Engineering 47(12), 87-89.
-
(2000)
Control Engineering
, vol.47
, Issue.12
, pp. 87-89
-
-
Summers, A.1
Zachary, B.2
-
20
-
-
56149083375
-
The effect of partial valve stroke testing on SIL level
-
Technical report
-
Van Beurden, I. and R. Amkreutz (2001). The effect of partial valve stroke testing on SIL level. Technical report, http://www.exida.com/company/ articles.asp.
-
(2001)
-
-
Van Beurden, I.1
Amkreutz, R.2
-
21
-
-
33746892605
-
The effect of diagnostic and periodic proof testing on the availability of programmable safety systems
-
Velten-Philipp, W. and M. J. Houtermans (2006). The effect of diagnostic and periodic proof testing on the availability of programmable safety systems. WSEAS Transactions on Systems 5(8), 1861-1867.
-
(2006)
WSEAS Transactions on Systems
, vol.5
, Issue.8
, pp. 1861-1867
-
-
Velten-Philipp, W.1
Houtermans, M.J.2
|