-
1
-
-
51849090704
-
Schedulability analysis and utilization bounds for highly scalable real-time services
-
T. F. Abdelzaher and C. Lu. Schedulability analysis and utilization bounds for highly scalable real-time services. In RTAS, 2001.
-
(2001)
RTAS
-
-
Abdelzaher, T.F.1
Lu, C.2
-
2
-
-
0033220904
-
Combined task and message scheduling in distributed real-time systems
-
T. F. Abdelzaher and K. G. Shin. Combined task and message scheduling in distributed real-time systems. IEEE TPDS, 10(11):1179-1191, 1999.
-
(1999)
IEEE TPDS
, vol.10
, Issue.11
, pp. 1179-1191
-
-
Abdelzaher, T.F.1
Shin, K.G.2
-
3
-
-
0036377430
-
Performance guarantees for web server end-systems: A controltheoretical approach
-
T. F. Abdelzaher, K. G. Shin, and N. Bhatti. Performance guarantees for web server end-systems: A controltheoretical approach. IEEE Transactions on Parallel and Distributed Systems, 13(1):80-96, 2002.
-
(2002)
IEEE Transactions on Parallel and Distributed Systems
, vol.13
, Issue.1
, pp. 80-96
-
-
Abdelzaher, T.F.1
Shin, K.G.2
Bhatti, N.3
-
4
-
-
31844454867
-
Syncopation: Generational real-time garbage collection in the metronome
-
D. F. Bacon, P. Cheng, D. Grove, and M. T. Vechev. Syncopation: generational real-time garbage collection in the metronome. In LCTES, pages 183-192, 2005.
-
(2005)
LCTES
, pp. 183-192
-
-
Bacon, D.F.1
Cheng, P.2
Grove, D.3
Vechev, M.T.4
-
6
-
-
85009483376
-
End-to-end scheduling to meet deadlines in distributed systems
-
R. Bettati and J. W.-S. Liu. End-to-end scheduling to meet deadlines in distributed systems. In ICDCS, 1992.
-
(1992)
ICDCS
-
-
Bettati, R.1
Liu, J.W.-S.2
-
7
-
-
85015430888
-
Surplus fair scheduling: A Proportional-Share CPU scheduling algorithm for symmetric multiprocessors
-
A. Chandra, M. Adler, P. Goyal, and P. Shenoy. Surplus fair scheduling: A Proportional-Share CPU scheduling algorithm for symmetric multiprocessors. In OSDI, 2000.
-
(2000)
OSDI
-
-
Chandra, A.1
Adler, M.2
Goyal, P.3
Shenoy, P.4
-
8
-
-
84866446879
-
Optimized priority assignment for tasks and messages in distributed hard realtime systems
-
J. J. G. García and M. G. Harbour. Optimized priority assignment for tasks and messages in distributed hard realtime systems. In WPDRTS, 1995.
-
(1995)
WPDRTS
-
-
García, J.J.G.1
Harbour, M.G.2
-
10
-
-
51849134226
-
A robust adaptive metric for deadline assignment in heterogeneous distributed real-time systems
-
J. Jonsson. A robust adaptive metric for deadline assignment in heterogeneous distributed real-time systems. In IPPS / SPDP, 1999.
-
(1999)
IPPS / SPDP
-
-
Jonsson, J.1
-
11
-
-
0030645834
-
Deadline assignment in distributed hard real-time systems with relaxed locality constraints
-
J. Jonsson and K. G. Shin. Deadline assignment in distributed hard real-time systems with relaxed locality constraints. In ICDCS, 1997.
-
(1997)
ICDCS
-
-
Jonsson, J.1
Shin, K.G.2
-
13
-
-
0035010961
-
Optimization based rate control for multirate multicast sesions
-
K. Kar, S. Sarkar, and L. Tassiulas. Optimization based rate control for multirate multicast sesions. In IEEE Infocom, 2001.
-
(2001)
IEEE Infocom
-
-
Kar, K.1
Sarkar, S.2
Tassiulas, L.3
-
14
-
-
0032027247
-
Rate control for communication networks: Shadow prices, proportional fairness and stability
-
F. P. Kelly, A. Maulloo, and D. Tan. Rate control for communication networks: shadow prices, proportional fairness and stability. Journal of Operations Research Society, 49(3):237-252, 1998.
-
(1998)
Journal of Operations Research Society
, vol.49
, Issue.3
, pp. 237-252
-
-
Kelly, F.P.1
Maulloo, A.2
Tan, D.3
-
15
-
-
0242302646
-
End-to-end congestion control schemes: Utility functions, random losses and ECN marks
-
S. Kunniyur and R. Srikant. End-to-end congestion control schemes: Utility functions, random losses and ECN marks. IEEE/ACM ToN, 11(5):689-702, 2003.
-
(2003)
IEEE/ACM ToN
, vol.11
, Issue.5
, pp. 689-702
-
-
Kunniyur, S.1
Srikant, R.2
-
16
-
-
0033905882
-
-
R. J. La and V. Anantharam. Charge-sensitive TCP and rate control in the Internet. In IEEE Infocom, 2000.
-
R. J. La and V. Anantharam. Charge-sensitive TCP and rate control in the Internet. In IEEE Infocom, 2000.
-
-
-
-
17
-
-
0024915921
-
The rate monotonic scheduling algorithm: Exact characterization and average case behavior
-
J. Lehoczky, L. Sha, and Y. Ding. The rate monotonic scheduling algorithm: Exact characterization and average case behavior. In RTSS, 1989.
-
(1989)
RTSS
-
-
Lehoczky, J.1
Sha, L.2
Ding, Y.3
-
18
-
-
84974687699
-
Scheduling algorithms for multiprogramming in a hard real-time environment
-
C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogramming in a hard real-time environment. Journal of the ACM, 20(1):46-61, 1973.
-
(1973)
Journal of the ACM
, vol.20
, Issue.1
, pp. 46-61
-
-
Liu, C.L.1
Layland, J.W.2
-
19
-
-
0033355765
-
Optimization flow control I: Basic algorithm and convergence
-
S. H. Low and D. E. Lapsley. Optimization flow control I: Basic algorithm and convergence. IEEE/ACM ToN, 7(6):861-874, 1999.
-
(1999)
IEEE/ACM ToN
, vol.7
, Issue.6
, pp. 861-874
-
-
Low, S.H.1
Lapsley, D.E.2
-
20
-
-
0036641752
-
Feedback control real-time scheduling: Framework, modeling, and algorithms
-
C. Lu, J. A. Stankovic, S. H. Son, and G. Tao. Feedback control real-time scheduling: Framework, modeling, and algorithms. Real-Time Systems Journal, 23(1-2):85-126, 2002.
-
(2002)
Real-Time Systems Journal
, vol.23
, Issue.1-2
, pp. 85-126
-
-
Lu, C.1
Stankovic, J.A.2
Son, S.H.3
Tao, G.4
-
21
-
-
2442425392
-
End-to-end utilization control in distributed real-time systems
-
C. Lu, X. Wang, and X. Koutsoukos. End-to-end utilization control in distributed real-time systems. In ICDCS, 2004.
-
(2004)
ICDCS
-
-
Lu, C.1
Wang, X.2
Koutsoukos, X.3
-
22
-
-
51849148545
-
Online optimization for latency assignment in distributed real-time systems
-
24503, IBM T.J. Watson Research Center
-
C. Lumezanu, S. Bhola, and M. Astley. Online optimization for latency assignment in distributed real-time systems. Research Report RC 24503, IBM T.J. Watson Research Center, 2008.
-
(2008)
Research Report RC
-
-
Lumezanu, C.1
Bhola, S.2
Astley, M.3
-
23
-
-
84882700513
-
Dynamic end-to-end guarantees in distributed real time systems
-
M. D. Natale and J. A. Stankovic. Dynamic end-to-end guarantees in distributed real time systems. In RTSS, 1994.
-
(1994)
RTSS
-
-
Natale, M.D.1
Stankovic, J.A.2
-
24
-
-
33947660242
-
On alternative decompositions and distributed algorithms for network utility problems
-
D. P. Palomar and M. Chiang. On alternative decompositions and distributed algorithms for network utility problems. In IEEE Globecom, 2005.
-
(2005)
IEEE Globecom
-
-
Palomar, D.P.1
Chiang, M.2
-
25
-
-
51849155669
-
Static allocation of periodic tasks with precedence constraints in distributed real-time systems
-
D.-T. Peng and K. G. Shin. Static allocation of periodic tasks with precedence constraints in distributed real-time systems. In IEEE ICDCS, 1989.
-
(1989)
IEEE ICDCS
-
-
Peng, D.-T.1
Shin, K.G.2
-
26
-
-
51849163819
-
Allocation and scheduling of complex periodic tasks
-
K. Ramamritham. Allocation and scheduling of complex periodic tasks. In IEEE ICDCS, 1990.
-
(1990)
IEEE ICDCS
-
-
Ramamritham, K.1
-
27
-
-
0021458524
-
Dynamic task scheduling in distributed hard real-time systems
-
K. Ramamritham and J. A. Stankovic. Dynamic task scheduling in distributed hard real-time systems. IEEE Software, 1(3), 1984.
-
(1984)
IEEE Software
, vol.1
, Issue.3
-
-
Ramamritham, K.1
Stankovic, J.A.2
-
28
-
-
84964057131
-
Adaptive resource management in asynchronous real-time distributed systems using feedback control functions
-
B. Ravindran, P. Kachroo, and T. Hegazy. Adaptive resource management in asynchronous real-time distributed systems using feedback control functions. In ISADS, 2001.
-
(2001)
ISADS
-
-
Ravindran, B.1
Kachroo, P.2
Hegazy, T.3
-
29
-
-
79957908938
-
Some guidelines for proportional share CPU scheduling in general-purpose operating systems
-
J. Regehr. Some guidelines for proportional share CPU scheduling in general-purpose operating systems. In RTSS, 2001.
-
(2001)
RTSS
-
-
Regehr, J.1
-
30
-
-
0003022830
-
An engineering approach to decomposing end-to-end delays on a distributed real-time system
-
M. Saksena and S. Hong. An engineering approach to decomposing end-to-end delays on a distributed real-time system. In WPDRTS, 1996.
-
(1996)
WPDRTS
-
-
Saksena, M.1
Hong, S.2
-
31
-
-
51849155181
-
The case for feedback control real-time scheduling
-
Technical report, University of Virginia
-
J. A. Stankovic, C. Lu, and S. H. Son. The case for feedback control real-time scheduling. Technical report, University of Virginia, 1998.
-
(1998)
-
-
Stankovic, J.A.1
Lu, C.2
Son, S.H.3
-
32
-
-
33847351708
-
A reinforcement learning framework for utility-based scheduling in resource-constrained systems
-
Technical Report 141, Sun Microsystems Laboratory, 205
-
D. Vengerov. A reinforcement learning framework for utility-based scheduling in resource-constrained systems. Technical Report 141, Sun Microsystems Laboratory, 205.
-
-
-
Vengerov, D.1
-
33
-
-
0344494692
-
Necessary and sufficient conditions for optimal flow control in multirate multicast networks
-
W.-H. Wang, M. Palaniswami, and S. H. Low. Necessary and sufficient conditions for optimal flow control in multirate multicast networks. IEE Proceedings-Communications, 2003.
-
(2003)
IEE Proceedings-Communications
-
-
Wang, W.-H.1
Palaniswami, M.2
Low, S.H.3
-
34
-
-
84879341179
-
Decentralized utilization control in distributed real-time systems
-
X. Wang, D. Jia, C. Lu, and X. Koutsoukos. Decentralized utilization control in distributed real-time systems. In RTSS, 2005.
-
(2005)
RTSS
-
-
Wang, X.1
Jia, D.2
Lu, C.3
Koutsoukos, X.4
|