Alkass., S.,Mazerolle, M.,Tribaldos., and Harris, F. Computer aided construction delay analysis and claim preparation, Journal of Construction Management and Economics, 13, pp.335-352, 1995.
-
Alkass., S.,Mazerolle, M.,Tribaldos., and Harris, F. "Computer aided construction delay analysis and claim preparation," Journal of Construction Management and Economics, Vol.13, pp.335-352, 1995.
-
-
-
-
3
-
-
50849093132
-
Selecting a delay analysis method in resolving construction claims
-
Article in Press, September
-
Arditi David and Thanat Pattanakitchamroon. "Selecting a delay analysis method in resolving construction claims". International Journal Of Project Management, Article in Press, September 2005.
-
(2005)
International Journal Of Project Management
-
-
David, A.1
Pattanakitchamroon, T.2
-
4
-
-
9144238349
-
Analytic Hierarchy Process Analyzes Risk of Operating Cross-Country Petroleum Pipelines in India
-
Dey, P. K, "Analytic Hierarchy Process Analyzes Risk of Operating Cross-Country Petroleum Pipelines in India," ASCE, Natural Hazards Review, Vol. 4, pp. 213-221, 2003
-
(2003)
ASCE, Natural Hazards Review
, vol.4
, pp. 213-221
-
-
Dey, P.K.1
-
5
-
-
0026854294
-
Group decision support with analytic hierarchy process
-
Dyer R.F., and E.H Forman., "Group decision support with analytic hierarchy process," Decision support system, Vol. 8 pp. 99-124,1992.
-
(1992)
Decision support system
, vol.8
, pp. 99-124
-
-
Dyer, R.F.1
Forman, E.H.2
-
6
-
-
50849115411
-
-
Fruchtman E., Delay analysis-eliminating the smoke and mirrors, Trans AACE Int, CDR. 6.1-CDR.6.4, 2000.
-
Fruchtman E., "Delay analysis-eliminating the smoke and mirrors," Trans AACE Int, CDR. 6.1-CDR.6.4, 2000.
-
-
-
-
7
-
-
0028756101
-
-
Jentzen GH, P Spittler., Ponce de Leon G. Responsibility for delay after the expiration of the contract time. Trans AACE Int, DCL.9.1.-DCL.9.7, 1994.
-
Jentzen GH, P Spittler., Ponce de Leon G. "Responsibility for delay after the expiration of the contract time". Trans AACE Int, DCL.9.1.-DCL.9.7, 1994.
-
-
-
-
8
-
-
50849130490
-
-
McCulloough R. B. CPM schedules in construction claims from the Contractor's prespective. Trans AACE Int,CDR.2.1.-CDR.2.4, (1999).
-
McCulloough R. B. "CPM schedules in construction claims from the Contractor's prespective". Trans AACE Int,CDR.2.1.-CDR.2.4, (1999).
-
-
-
-
9
-
-
50849133152
-
-
Richard J.Long, P.E., Andrew Avalon, P.E., Ronald J. Rider, MBA and Anamaria Popescu, Ph.D. 2005. Long International's Schedule and Delay Analysis Methodologies, Retrived 1/18/06 www.long-intl.com/schedule.pdf
-
Richard J.Long, P.E., Andrew Avalon, P.E., Ronald J. Rider, MBA and Anamaria Popescu, Ph.D. 2005. "Long International's Schedule and Delay Analysis Methodologies, "Retrived 1/18/06 www.long-intl.com/schedule.pdf
-
-
-
-
10
-
-
50849135090
-
Delay analysis construction claims analysis
-
New York NY, Van Nostrand Reinhold
-
Rubin RA, Guy SD, Maevis AC, Fairweather V. "Delay analysis construction claims analysis, presentation, and defense. New York (NY): Van Nostrand Reinhold, 1983.
-
(1983)
presentation, and defense
-
-
Rubin, R.A.1
Guy, S.D.2
Maevis, A.C.3
Fairweather, V.4
-
13
-
-
0020164915
-
Priority setting in complex problems
-
August
-
Saaty, T.L, "Priority setting in complex problems". IEEE Trans. Eng. Manage., Vol. 30, pp. 140-155, August 1983.
-
(1983)
IEEE Trans. Eng. Manage
, vol.30
, pp. 140-155
-
-
Saaty, T.L.1
-
14
-
-
0000893055
-
Construction delay analysis Techniques
-
Sabah Alkass, Mark Mazerolle and Frank Harris.,"Construction delay analysis Techniques," Journal of Construction management and Economics, Vol. 14, pp. 375-394, 1996.
-
(1996)
Journal of Construction management and Economics
, vol.14
, pp. 375-394
-
-
Alkass, S.1
Mazerolle, M.2
Harris, F.3
-
16
-
-
29244433489
-
-
SCL-Society of Construction Law, Available from
-
SCL-Society of Construction Law. "Delay and Disruption protocol;" 2002. Available from: www.eotprotocol.com
-
(2002)
Delay and Disruption protocol
-
-
-
17
-
-
44949288762
-
An overview of the analytic hierarchy process and its applications,
-
Vargas, L.G.., "An overview of the analytic hierarchy process and its applications,". European Journal of Operation and Res, Vol. 48, pp. 2-8. 1990.
-
(1990)
European Journal of Operation and Res
, vol.48
, pp. 2-8
-
-
Vargas, L.G.1
-
19
-
-
0242411323
-
But-for schedule-analysis and defense
-
Zack Jr J., "But-for schedule-analysis and defense," Cost Engineering AACE, Vol 43), pp. 13-17, 2001.
-
(2001)
Cost Engineering AACE
, vol.43
, pp. 13-17
-
-
Zack Jr, J.1
|