메뉴 건너뛰기




Volumn , Issue , 2007, Pages 2234-2240

Simulation of adaptive project management analytics

Author keywords

[No Author keywords available]

Indexed keywords

ADAPTIVE ALGORITHMS; BUDGET CONTROL; OPTIMIZATION; RISK ASSESSMENT; RISKS;

EID: 49749113737     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2007.4419859     Document Type: Conference Paper
Times cited : (4)

References (12)
  • 1
    • 0001878102 scopus 로고
    • Runaway Projects - Cause and Effects
    • Cole, A. 1995. Runaway Projects - Cause and Effects. Software World (UK) 26(3), pp. 3-5.
    • (1995) Software World (UK) , vol.26 , Issue.3 , pp. 3-5
    • Cole, A.1
  • 2
    • 49749131329 scopus 로고    scopus 로고
    • Decision Systems Laboratory of the University of Pittsburgh
    • Decision Systems Laboratory of the University of Pittsburgh. (http://dsl.sis.pitt.edu).
  • 4
    • 46149113273 scopus 로고    scopus 로고
    • IBM SmartSCOR - A SCOR based supply chain transformation platform through simulation and optimization techniques
    • Dong, J., Ding, H., Ren, C., Wang. W. 2006. IBM SmartSCOR - A SCOR based supply chain transformation platform through simulation and optimization techniques. Proceedings of the 2006 Winter Simulation Conference.
    • (2006) Proceedings of the 2006 Winter Simulation Conference
    • Dong, J.1    Ding, H.2    Ren, C.3    Wang, W.4
  • 5
    • 3242704207 scopus 로고    scopus 로고
    • BBN-based Software Project Risk Management
    • Fan, C.-F. and Yu. Yuan-Chang. 2004. BBN-based Software Project Risk Management. J. Systems and Software 73(2), pp. 193-203.
    • (2004) J. Systems and Software , vol.73 , Issue.2 , pp. 193-203
    • Fan, C.-F.1    Yuan-Chang, Y.2
  • 6
    • 34249761849 scopus 로고
    • Learning Bayesian Networks: The Combination of Knowledge and Statistical Data
    • Heckerman, D., Geiger, D. and Chickering, D. 1995. Learning Bayesian Networks: The Combination of Knowledge and Statistical Data. Machine Learning, 20(3) pp. 197-243.
    • (1995) Machine Learning , vol.20 , Issue.3 , pp. 197-243
    • Heckerman, D.1    Geiger, D.2    Chickering, D.3
  • 9
    • 13944275955 scopus 로고    scopus 로고
    • Nasir, D., McCabe B. and Hartono, L. 2003. Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction Schedule Risk Model. J. Construction Eng. and Management, 129(5), pp. 518-527.
    • Nasir, D., McCabe B. and Hartono, L. 2003. Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction Schedule Risk Model. J. Construction Eng. and Management, 129(5), pp. 518-527.
  • 12
    • 33750715130 scopus 로고    scopus 로고
    • Critical Risks in Outsourced IT Projects: The Intractable and the Unforeseen
    • Taylor, H. 2006. Critical Risks in Outsourced IT Projects: The Intractable and the Unforeseen. Comm. ACM 49(11), 75.
    • (2006) Comm. ACM , vol.49 , Issue.11 , pp. 75
    • Taylor, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.