메뉴 건너뛰기




Volumn 10, Issue 4, 2004, Pages 400-414

Re-engineering proves effective for reducing courier costs

Author keywords

Business process re engineering; Information systems; Optimization techniques; Process management

Indexed keywords


EID: 49349105133     PISSN: 14637154     EISSN: None     Source Type: Journal    
DOI: 10.1108/14637150410548074     Document Type: Article
Times cited : (18)

References (22)
  • 1
    • 0002110806 scopus 로고
    • Applying integer linear programming to the fleet assignment problem
    • -
    • Abara, J. (1989), “Applying integer linear programming to the fleet assignment problem”, Interfaces, Vol. 28 No. 2, pp. 58-71.
    • (1989) Interfaces , vol.28 , Issue.2 , pp. 58-71
    • Abara, J.1
  • 2
    • 84986172540 scopus 로고    scopus 로고
    • Business process re-engineering: a survey of international experience
    • -
    • Al-Mashari, M., Irani, Z. and Zairi, M. (2001), “Business process re-engineering: a survey of international experience”, Business Process Management, Vol. 7 No. 5, pp. 437-55.
    • (2001) Business Process Management , vol.7 , Issue.5 , pp. 437-455
    • Al-Mashari, M.1    Irani, Z.2    Zairi, M.3
  • 3
    • 0032716485 scopus 로고    scopus 로고
    • Managerial implications of calculating optimum nurse staffing in Medicare units
    • -
    • Bordoloi, S.K. and Weatherby, E.J. (1999), “Managerial implications of calculating optimum nurse staffing in Medicare units”, Interfaces, Vol. 24 No. 4, pp. 35-44.
    • (1999) Interfaces , vol.24 , Issue.4 , pp. 35-44
    • Bordoloi, S.K.1    Weatherby, E.J.2
  • 4
    • 4544277697 scopus 로고    scopus 로고
    • Scheduling employees for around-the-clock operations
    • -
    • Browne, J. (2000), “Scheduling employees for around-the-clock operations”, IIE Solutions, Vol. 32 No. 2, pp. 30-3.
    • (2000) IIE Solutions , vol.32 , Issue.2 , pp. 30-33
    • Browne, J.1
  • 6
    • 0027284618 scopus 로고
    • Heuristic algorithms for the multiple depot vehicle-scheduling problem
    • -
    • Dell'Amico, M., Fischetti, M. and Toth, P. (1993), “Heuristic algorithms for the multiple depot vehicle-scheduling problem”, Management Science, Vol. 39 No. 1, pp. 115-25.
    • (1993) Management Science , vol.39 , Issue.1 , pp. 115-125
    • Dell'Amico, M.1    Fischetti, M.2    Toth, P.3
  • 7
    • 0040956878 scopus 로고    scopus 로고
    • Air Transat uses ALTITUDE to manage its aircraft routing, crew pairing, and work assignment
    • -
    • Desrosiers, J., Lasry, A., McInnis, D., Solomon, M.M. and Soumis, F. (2000), “Air Transat uses ALTITUDE to manage its aircraft routing, crew pairing, and work assignment”, Interfaces, Vol. 30 No. 2, pp. 41-54.
    • (2000) Interfaces , vol.30 , Issue.2 , pp. 41-54
    • Desrosiers, J.1    Lasry, A.2    McInnis, D.3    Solomon, M.M.4    Soumis, F.5
  • 8
    • 0036656916 scopus 로고    scopus 로고
    • On tightening the relaxations of Miller-Tucker-Zemlin formulations for asymmetric traveling salesman problems
    • -
    • Driscoll, P.J. and Sherali, H.D. (2002), “On tightening the relaxations of Miller-Tucker-Zemlin formulations for asymmetric traveling salesman problems”, Operations Research, Vol. 50 No. 4, pp. 656-70.
    • (2002) Operations Research , vol.50 , Issue.4 , pp. 656-670
    • Driscoll, P.J.1    Sherali, H.D.2
  • 9
    • 85044702118 scopus 로고    scopus 로고
    • Reorganization, cross-training, and automation have allowed the laboratory department to reduce hospital-paid personnel by more than 70 full-time equivalent (FTE) employees
    • -
    • Ellis, J.E. and Moser, L.H. (1998), “Reorganization, cross-training, and automation have allowed the laboratory department to reduce hospital-paid personnel by more than 70 full-time equivalent (FTE) employees”, Health-care Financial Management, Vol. 52 No. 8, pp. 52-5.
    • (1998) Health-care Financial Management , vol.52 , Issue.8 , pp. 52-55
    • Ellis, J.E.1    Moser, L.H.2
  • 10
    • 0039770562 scopus 로고    scopus 로고
    • Trans Alta redesigns its service-delivery network
    • -
    • Erkut, E., Myroon, T. and Strangway, K. (2000), “Trans Alta redesigns its service-delivery network”, Interfaces, Vol. 30 No. 2, pp. 54-70.
    • (2000) Interfaces , vol.30 , Issue.2 , pp. 54-70
    • Erkut, E.1    Myroon, T.2    Strangway, K.3
  • 13
    • 0039466523 scopus 로고    scopus 로고
    • The problem of generating crew bidlines
    • -
    • Jarrah, A. and Diamond, J. (1997), “The problem of generating crew bidlines”, Interfaces, Vol. 27 No. 4, pp. 49-64.
    • (1997) Interfaces , vol.27 , Issue.4 , pp. 49-64
    • Jarrah, A.1    Diamond, J.2
  • 14
    • 0040790541 scopus 로고    scopus 로고
    • Heery International's spreadsheet optimization model for assigning managers to construction projects
    • -
    • LeBlanc, L.J., Randels, D. Jr, Swann, T.K. and Emory, E.F. (2000), “Heery International's spreadsheet optimization model for assigning managers to construction projects”, Interfaces, Vol. 30 No. 6, pp. 95-106.
    • (2000) Interfaces , vol.30 , Issue.6 , pp. 95-106
    • LeBlanc, L.J.1    Randels, D.J.2    Swann, T.K.3    Emory, E.F.4
  • 15
    • 0032298664 scopus 로고    scopus 로고
    • Vehicle scheduling in public transit and Lagrangean pricing
    • -
    • Lobel, A. (1998), “Vehicle scheduling in public transit and Lagrangean pricing”, Management Science, Vol. 44 No. 12, pp. 1637-9.
    • (1998) Management Science , vol.44 , Issue.12 , pp. 1637-1639
    • Lobel, A.1
  • 16
    • 0035749055 scopus 로고    scopus 로고
    • Health-care cost containment: a contradiction in terms?
    • -
    • McConnell, C.R. (2001), “Health-care cost containment: a contradiction in terms?”, The Health-care Manager, Vol. 20 No. 2, pp. 68-80.
    • (2001) The Health-care Manager , vol.20 , Issue.2 , pp. 68-80
    • McConnell, C.R.1
  • 18
    • 0040196089 scopus 로고    scopus 로고
    • Production scheduling theory: just where is it applicable?
    • -
    • Portougal, V. and Robb, D. (1996), “Production scheduling theory: just where is it applicable?”, Interfaces, Vol. 30 No. 6, pp. 64-77.
    • (1996) Interfaces , vol.30 , Issue.6 , pp. 64-77
    • Portougal, V.1    Robb, D.2
  • 19
    • 84951838135 scopus 로고    scopus 로고
    • inBPR online learning center (accessed 28 January 2003).
    • ProSci (2002), “Methodology selection guidelines”, in, BPR online learning center, available at: www.prosci.com/project=planning.htm (accessed 28 January 2003).
    • (2002) Methodology selection guidelines
    • ProSci, P.1
  • 20
    • 84986172348 scopus 로고    scopus 로고
    • Business process re-engineering and performance improvement: the case of Chase Manhattan Bank
    • -
    • Shin, N. and Jemella, D. (2002), “Business process re-engineering and performance improvement: the case of Chase Manhattan Bank”, Business Process Management Journal, Vol. 8 No. 4, pp. 351-63.
    • (2002) Business Process Management Journal , vol.8 , Issue.4 , pp. 351-363
    • Shin, N.1    Jemella, D.2
  • 21
    • 0005326952 scopus 로고    scopus 로고
    • Assigning telephone operators to shifts at New Brunswick Telephone Company
    • -
    • Thompson, G. (1997), “Assigning telephone operators to shifts at New Brunswick Telephone Company”, Inferfaces, Vol. 27 No. 1, pp. 1-11.
    • (1997) Inferfaces , vol.27 , Issue.1 , pp. 1-11
    • Thompson, G.1
  • 22
    • 0002444551 scopus 로고
    • The traveling salesman problem: a survey
    • -
    • Bellmore, M. and Nemhauser, G.L. (1968), “The traveling salesman problem: a survey”, Operations Research, Vol. 17 No. 3, pp. 538-58.
    • (1968) Operations Research , vol.17 , Issue.3 , pp. 538-558
    • Bellmore, M.1    Nemhauser, G.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.