-
1
-
-
84974717618
-
The impact of more accurate requested runtimes on production job scheduling performance
-
8th Job Scheduling Strategies for Pamllel Processing JSSPP, pp, Springer-Verlag, Jul
-
S-H. Chiang, A. Arpaci-Dusseau, and M. K. Vernon, "The impact of more accurate requested runtimes on production job scheduling performance". In 8th Job Scheduling Strategies for Pamllel Processing (JSSPP), pp. 103-127, Springer-Verlag, Jul 2002. LNCS 2537.
-
(2002)
LNCS
, vol.2537
, pp. 103-127
-
-
Chiang, S.-H.1
Arpaci-Dusseau, A.2
Vernon, M.K.3
-
4
-
-
33847116477
-
A Short Survey of Commercial Cluster Batch Schedulers
-
Tech. Report 2005-13, The Hebrew University, May
-
Y. Etsion and D. Tsafrir. A Short Survey of Commercial Cluster Batch Schedulers. Tech. Report 2005-13, The Hebrew University, May 2005.
-
(2005)
-
-
Etsion, Y.1
Tsafrir, D.2
-
5
-
-
14844355898
-
-
D. G. Feitelson, Experimental analysis of the root causes of performance evaluation results: a backfilling case study. IEEE Trans. Parallel & Distributed Syst. (TPDS) 16(2), pp. 175-182, Feb 2005.
-
D. G. Feitelson, "Experimental analysis of the root causes of performance evaluation results: a backfilling case study". IEEE Trans. Parallel & Distributed Syst. (TPDS) 16(2), pp. 175-182, Feb 2005.
-
-
-
-
6
-
-
85044952193
-
-
D. G. Feitelson and A. Mualem Weil, Utilization and predictability in scheduling the IBM SP2 with backfilling. In 12th IEEE Int'l Parallel Processing Symp. (IPPS), pp. 542-546, Apr 1998.
-
D. G. Feitelson and A. Mualem Weil, "Utilization and predictability in scheduling the IBM SP2 with backfilling". In 12th IEEE Int'l Parallel Processing Symp. (IPPS), pp. 542-546, Apr 1998.
-
-
-
-
8
-
-
28244460212
-
Adaptive parallel job scheduling with flexible coscheduling
-
IEEE Trans. Parallel & Distributed Syst, TPDS, Nov
-
E. Frachtenberg, D. G. Feitelson, F. Petrini, and J. Fernandez. "Adaptive parallel job scheduling with flexible coscheduling". IEEE Trans. Parallel & Distributed Syst. (TPDS) 16(11), pp. 1066-1077, Nov 2005.
-
(2005)
, vol.16
, Issue.11
, pp. 1066-1077
-
-
Frachtenberg, E.1
Feitelson, D.G.2
Petrini, F.3
Fernandez, J.4
-
11
-
-
84947940358
-
On the design and evaluation of job scheduling algorithms
-
Job Scheduling Strategies for Parallel Processing JSSPP, pp, Springer Verlag
-
J. Krallmann, U. Schwiegeishohn, and R. Yahyapour. "On the design and evaluation of job scheduling algorithms". In Job Scheduling Strategies for Parallel Processing (JSSPP), pp. 17-42, Springer Verlag, 1999. LNCS 1659.
-
(1999)
LNCS
, vol.1659
, pp. 17-42
-
-
Krallmann, J.1
Schwiegeishohn, U.2
Yahyapour, R.3
-
12
-
-
23944500342
-
Are user runtime estimates inherently inaccurate
-
10th Job Scheduling Strategies for Parallel Processing JSSPP, pp, Springer-Verlag, Jun
-
C. B. Lee, Y. Schwartzman, J. Hardy, and A. Snavely, "Are user runtime estimates inherently inaccurate'.'". In 10th Job Scheduling Strategies for Parallel Processing (JSSPP), pp. 253-263, Springer-Verlag, Jun 2004. LNCS 3277.
-
(2004)
LNCS
, vol.3277
, pp. 253-263
-
-
Lee, C.B.1
Schwartzman, Y.2
Hardy, J.3
Snavely, A.4
-
13
-
-
84947720919
-
The ANL/IBM SPscheduling system
-
1st Job Scheduling Strategies for Parallel Processing JSSPP, pp, Springer-Verlag. Apr
-
D. Lifka, "The ANL/IBM SPscheduling system". In 1st Job Scheduling Strategies for Parallel Processing (JSSPP). pp. 295-303, Springer-Verlag. Apr 1995. LNCS 949.
-
(1995)
LNCS
, vol.949
, pp. 295-303
-
-
Lifka, D.1
-
14
-
-
0035363047
-
Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling
-
IEEE Trans. Parallel & Distributed Syst, TPDS, Jun
-
A. W. Mu'alem and D. G. Feitelson, "Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling". IEEE Trans. Parallel & Distributed Syst. (TPDS) 12(6), pp. 529-543, Jun 2001.
-
(2001)
, vol.12
, Issue.6
, pp. 529-543
-
-
Mu'alem, A.W.1
Feitelson, D.G.2
-
19
-
-
84949201596
-
-
V. Subrarnani, R. Kettimuthu. S. Srinivasan, and P. Sadayappan, Distributed job scheduling on computational grids using multiple simultaneous requests. In 11th IEEE Int'l Symp. High Performance Distributed Comput. (HPDC), p. 359, Jul 2002.
-
V. Subrarnani, R. Kettimuthu. S. Srinivasan, and P. Sadayappan, "Distributed job scheduling on computational grids using multiple simultaneous requests". In 11th IEEE Int'l Symp. High Performance Distributed Comput. (HPDC), p. 359, Jul 2002.
-
-
-
-
20
-
-
48449089707
-
Evaluating Job Scheduling Techniques for Highly Parallel Computers
-
Tech. Report CMU-CS-95-149, Carnegie Mellon University, Aug
-
T. Suzuoka, J. Subhlok, and T. Gross, Evaluating Job Scheduling Techniques for Highly Parallel Computers. Tech. Report CMU-CS-95-149, Carnegie Mellon University, Aug 1995.
-
(1995)
-
-
Suzuoka, T.1
Subhlok, J.2
Gross, T.3
-
23
-
-
33744910071
-
Modeling user runtime estimates
-
11th Job Scheduling Strategies for Parallel Processing JSSPP, pp, Springer-Verlag. Jun
-
D. Tsafrir, Y. Etsion, and D. G. Feitelson, "Modeling user runtime estimates". In 11th Job Scheduling Strategies for Parallel Processing (JSSPP), pp. 1-35, Springer-Verlag. Jun 2005. LNCS 3834.
-
(2005)
LNCS
, vol.3834
, pp. 1-35
-
-
Tsafrir, D.1
Etsion, Y.2
Feitelson, D.G.3
-
24
-
-
33847150570
-
-
D. Tsafrir and D. G. Feitelson, Instability in parallel job scheduling simulation: the role of workload flurries. In 20th IEEE Int'l Parallel & Distributed Processing Symp. (IPDPS), p. 10, Apr 2006.
-
D. Tsafrir and D. G. Feitelson, "Instability in parallel job scheduling simulation: the role of workload flurries". In 20th IEEE Int'l Parallel & Distributed Processing Symp. (IPDPS), p. 10, Apr 2006.
-
-
-
-
26
-
-
0033901383
-
-
Y. Zhang, H. Franke, J. Moreira, and A. Sivasubramaniam. Improving parallel job scheduling by combining gang scheduling and backfilling techniques. In 14th IEEE Int'l Parallel & Distributed Processing Symp. (IPDPS), pp. 133-142, May 2000.
-
Y. Zhang, H. Franke, J. Moreira, and A. Sivasubramaniam. "Improving parallel job scheduling by combining gang scheduling and backfilling techniques". In 14th IEEE Int'l Parallel & Distributed Processing Symp. (IPDPS), pp. 133-142, May 2000.
-
-
-
-
27
-
-
0038639099
-
An integrated approach to parallel scheduling using gang-scheduling, backfilling, and migration
-
IEEE Trans. Parallel & Distributed Svst, TPDS, Mar
-
Y. Zhang, H. Franke. J. Moreira, and A. Sivasubramaniam, "An integrated approach to parallel scheduling using gang-scheduling, backfilling, and migration''. IEEE Trans. Parallel & Distributed Svst. (TPDS) 14(3), pp. 236-247, Mar 2003.
-
(2003)
, vol.14
, Issue.3
, pp. 236-247
-
-
Zhang, Y.1
Franke, H.2
Moreira, J.3
Sivasubramaniam, A.4
-
28
-
-
0033358802
-
-
D. Zotkin and P. J. Keleher, Job-length estimation and performance in backfilling schedulers. In 8th IEEE Int'l Symp. High Performance Distributed Computing (HPDC), p. 39, Aug 1999.
-
D. Zotkin and P. J. Keleher, "Job-length estimation and performance in backfilling schedulers". In 8th IEEE Int'l Symp. High Performance Distributed Computing (HPDC), p. 39, Aug 1999.
-
-
-
|