메뉴 건너뛰기




Volumn , Issue , 2007, Pages 502-505

Deployment of IEC 61499 compliant distributed control applications

Author keywords

[No Author keywords available]

Indexed keywords

DEPLOYMENT PROBLEMS; DISTRIBUTED APPLICATIONS; DISTRIBUTED CONTROLS; EXECUTION SEMANTICS; HETEROGENEOUS NODES; HETEROGENEOUS PROCESSING; OPTIMAL SOLUTIONS; PAPER ADDRESSES; SOFTWARE INFRASTRUCTURES; STANDARD LIKES; TEMPORAL RESTRICTIONS;

EID: 47849124375     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/EFTA.2007.4416810     Document Type: Conference Paper
Times cited : (6)

References (14)
  • 1
    • 10044243949 scopus 로고    scopus 로고
    • A Methodology for the Development of Real-Time Control Applications With Focus on Task Allocation in Heterogeneous Systems
    • Dec
    • A. Prayati, C. Koulamas, S. Koubias and G. Papadopoulos, "A Methodology for the Development of Real-Time Control Applications With Focus on Task Allocation in Heterogeneous Systems", IEEE Transactions on Industrial Electronics, Vol. 51(6), pp.1194-1207, Dec. 2004.
    • (2004) IEEE Transactions on Industrial Electronics , vol.51 , Issue.6 , pp. 1194-1207
    • Prayati, A.1    Koulamas, C.2    Koubias, S.3    Papadopoulos, G.4
  • 6
    • 0029346629 scopus 로고
    • Guaranteeing Endto-End Timing Constraints by Calibrating Intermediate Processes
    • R. Gerber, M. Saksena and H. Hong, "Guaranteeing Endto-End Timing Constraints by Calibrating Intermediate Processes" IEEE Transaction on Software Engineering, Vol. 21(7), pp. 579-592, 1995.
    • (1995) IEEE Transaction on Software Engineering , vol.21 , Issue.7 , pp. 579-592
    • Gerber, R.1    Saksena, M.2    Hong, H.3
  • 7
    • 33845342493 scopus 로고    scopus 로고
    • Executing real-time constrained control applications modelled in IEC 61499 with respect to dynamic reconfiguration
    • A. Zoitl, G. Grabmair and C. Sünder, "Executing real-time constrained control applications modelled in IEC 61499 with respect to dynamic reconfiguration", Proc. of 3rd IEEE Conference on Industrial Informatics, 2005.
    • (2005) Proc. of 3rd IEEE Conference on Industrial Informatics
    • Zoitl, A.1    Grabmair, G.2    Sünder, C.3
  • 10
    • 0028202307 scopus 로고
    • Timing Analysis for Fixed-Priority Scheduling of Hard Real-Time Systems
    • M. Harbour, M. Klein and J. Lehoczky, "Timing Analysis for Fixed-Priority Scheduling of Hard Real-Time Systems", Software Engineering, Vol 20(1), pp. 13-28, 1994.
    • (1994) Software Engineering , vol.20 , Issue.1 , pp. 13-28
    • Harbour, M.1    Klein, M.2    Lehoczky, J.3
  • 11
    • 24944524857 scopus 로고    scopus 로고
    • Real-Time Scheduling Techniques for Implementation Synthesis from Component-Based Software Models
    • Z. Gu and Z. He, "Real-Time Scheduling Techniques for Implementation Synthesis from Component-Based Software Models", Component-Based Software Engineering, Vol. 3489/2005, pp. 235-250, 2005.
    • (2005) Component-Based Software Engineering , vol.3489 , Issue.2005 , pp. 235-250
    • Gu, Z.1    He, Z.2
  • 14
    • 47849103020 scopus 로고    scopus 로고
    • Modeling of IEC 61499 Compliant Distributed Control Applications for Automatic Deployment
    • 2 Technical Report 07/, July
    • 2 Technical Report 07/2007, July 2007.
    • (2007) , pp. 2007
    • Hussain, T.1    Frey, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.