Volumn 25, Issue 2, 2008, Pages 169-186

An exact approach for the single machine scheduling problem with linear early and quadratic tardy penalties

Author keywords

Branch and bound; Linear earliness; Lower bound; Quadratic tardiness; Scheduling; Single machine

Indexed keywords

ALGORITHMS; CONTROL THEORY; EIGENVALUES AND EIGENFUNCTIONS; MILITARY DATA PROCESSING; QUADRATIC PROGRAMMING;

EID: 47749150300     PISSN: 02175959     EISSN: None     Source Type: Journal    
DOI: 10.1142/S0217595908001730     Document Type: Article
Times cited : (14)

References (17)
  • 1
    • 0026243299 scopus 로고
    • Bicriteria scheduling problem involving total tardiness and total earliness penalties
    • Azizoglu, M, S Kondakci and O Kirca (1991). Bicriteria scheduling problem involving total tardiness and total earliness penalties. International Journal of Production Economics, 23, 17-24.
    • (1991) International Journal of Production Economics , vol.23 , pp. 17-24
    • Azizoglu, M.1    Kondakci, S.2    Kirca, O.3
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, KR and GD Scudder (1990). Sequencing with earliness and tardiness penalties: A review. Operations Research, 38, 22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric earliness and tardiness penalties
    • Garey, MR, RE Tarjan and GT Wilfong (1988). One-processor scheduling with symmetric earliness and tardiness penalties. Mathematics of Operations Research, 13, 330-348.
    • (1988) Mathematics of Operations Research , vol.13 , pp. 330-348
    • Garey, M.R.1    Tarjan, R.E.2    Wilfong, G.T.3
  • 4
    • 0020809540 scopus 로고
    • Minimizing a quadratic function of job lateness on a single machine
    • Gupta, SK and T Sen (1983). Minimizing a quadratic function of job lateness on a single machine. Engineering Costs and Production Economics, 7, 187-194.
    • (1983) Engineering Costs and Production Economics , vol.7 , pp. 187-194
    • Gupta, S.K.1    Sen, T.2
  • 5
    • 0033685372 scopus 로고    scopus 로고
    • Scheduling with inserted idle time: Problem taxonomy and literature review
    • Kanet, JJ and V Sridharan (2000). Scheduling with inserted idle time: Problem taxonomy and literature review. Operations Research, 48, 99-110.
    • (2000) Operations Research , vol.48 , pp. 99-110
    • Kanet, J.J.1    Sridharan, V.2
  • 6
    • 0028734441 scopus 로고
    • Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
    • Kim, YD and CA Yano (1994). Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates. Naval Research Logistics, 41, 913-933.
    • (1994) Naval Research Logistics , vol.41 , pp. 913-933
    • Kim, Y.D.1    Yano, C.A.2
  • 7
    • 13844249320 scopus 로고
    • A pressing matter
    • Korman, K (1994). A pressing matter. Video, 46-50.
    • (1994) Video , pp. 46-50
    • Korman, K.1
  • 8
    • 47749134429 scopus 로고    scopus 로고
    • Landis, K (1993). Group technology and cellular manufacturing in the Westvaco Los Angeles VH department. Project report in IOM 581, School of Business, University of Southern California.
    • Landis, K (1993). Group technology and cellular manufacturing in the Westvaco Los Angeles VH department. Project report in IOM 581, School of Business, University of Southern California.
  • 9
    • 0037121183 scopus 로고    scopus 로고
    • Minimizing the sum of squares lateness on a single machine
    • Schaller, J (2002). Minimizing the sum of squares lateness on a single machine. European Journal of Operational Research, 143, 64-79.
    • (2002) European Journal of Operational Research , vol.143 , pp. 64-79
    • Schaller, J.1
  • 10
    • 2342473349 scopus 로고    scopus 로고
    • Single machine scheduling with early and quadratic tardy penalties
    • Schaller, J (2004). Single machine scheduling with early and quadratic tardy penalties. Computers & Industrial Engineering, 46, 511-532.
    • (2004) Computers & Industrial Engineering , vol.46 , pp. 511-532
    • Schaller, J.1
  • 11
    • 0030125484 scopus 로고
    • Minimizing a weighted quadratic function of job lateness in the single machine system
    • Sen, T, P Dileepan and MR Lind (1995). Minimizing a weighted quadratic function of job lateness in the single machine system. International Journal of Production Economics, 42, 237-243.
    • (1995) International Journal of Production Economics , vol.42 , pp. 237-243
    • Sen, T.1    Dileepan, P.2    Lind, M.R.3
  • 12
    • 0032114993 scopus 로고    scopus 로고
    • A heuristic to minimize a quadratic function of job lateness on a single machine
    • Su, L-H and P-C Chang (1998). A heuristic to minimize a quadratic function of job lateness on a single machine. International Journal of Production Economics, 55, 169-175.
    • (1998) International Journal of Production Economics , vol.55 , pp. 169-175
    • Su, L.-H.1    Chang, P.-C.2
  • 13
    • 0032628094 scopus 로고    scopus 로고
    • Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
    • Sun, X, JS Noble and CM Klein (1999). Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness. IIE Transactions, 31, 113-124.
    • (1999) IIE Transactions , vol.31 , pp. 113-124
    • Sun, X.1    Noble, J.S.2    Klein, C.M.3
  • 15
    • 84969451575 scopus 로고    scopus 로고
    • Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
    • Valente, JMS (2006). Heuristics for the single machine scheduling problem with early and quadratic tardy penalties. European Journal of Industrial Engineering, 1, 431-448.
    • (2006) European Journal of Industrial Engineering , vol.1 , pp. 431-448
    • Valente, J.M.S.1
  • 17
    • 0036626376 scopus 로고    scopus 로고
    • The production of several items in a single facility with linearly changing demand rates
    • Wagner, BJ, DJ Davis and H Kher (2002). The production of several items in a single facility with linearly changing demand rates. Decision Sciences, 33, 317-346.
    • (2002) Decision Sciences , vol.33 , pp. 317-346
    • Wagner, B.J.1    Davis, D.J.2    Kher, H.3