Sequencing with earliness and tardiness penalties: A review
-
Baker, KR and GD Scudder (1990). Sequencing with earliness and tardiness penalties: A review. Operations Research, 38, 22-36.
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
4
-
-
0020809540
-
Minimizing a quadratic function of job lateness on a single machine
-
Gupta, SK and T Sen (1983). Minimizing a quadratic function of job lateness on a single machine. Engineering Costs and Production Economics, 7, 187-194.
-
(1983)
Engineering Costs and Production Economics
, vol.7
, pp. 187-194
-
-
Gupta, S.K.1
Sen, T.2
-
5
-
-
0033685372
-
Scheduling with inserted idle time: Problem taxonomy and literature review
-
Kanet, JJ and V Sridharan (2000). Scheduling with inserted idle time: Problem taxonomy and literature review. Operations Research, 48, 99-110.
-
(2000)
Operations Research
, vol.48
, pp. 99-110
-
-
Kanet, J.J.1
Sridharan, V.2
-
6
-
-
0028734441
-
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
-
Kim, YD and CA Yano (1994). Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates. Naval Research Logistics, 41, 913-933.
-
(1994)
Naval Research Logistics
, vol.41
, pp. 913-933
-
-
Kim, Y.D.1
Yano, C.A.2
-
7
-
-
13844249320
-
A pressing matter
-
Korman, K (1994). A pressing matter. Video, 46-50.
-
(1994)
Video
, pp. 46-50
-
-
Korman, K.1
-
8
-
-
47749134429
-
-
Landis, K (1993). Group technology and cellular manufacturing in the Westvaco Los Angeles VH department. Project report in IOM 581, School of Business, University of Southern California.
-
Landis, K (1993). Group technology and cellular manufacturing in the Westvaco Los Angeles VH department. Project report in IOM 581, School of Business, University of Southern California.
-
-
-
-
9
-
-
0037121183
-
Minimizing the sum of squares lateness on a single machine
-
Schaller, J (2002). Minimizing the sum of squares lateness on a single machine. European Journal of Operational Research, 143, 64-79.
-
(2002)
European Journal of Operational Research
, vol.143
, pp. 64-79
-
-
Schaller, J.1
-
10
-
-
2342473349
-
Single machine scheduling with early and quadratic tardy penalties
-
Schaller, J (2004). Single machine scheduling with early and quadratic tardy penalties. Computers & Industrial Engineering, 46, 511-532.
-
(2004)
Computers & Industrial Engineering
, vol.46
, pp. 511-532
-
-
Schaller, J.1
-
11
-
-
0030125484
-
Minimizing a weighted quadratic function of job lateness in the single machine system
-
Sen, T, P Dileepan and MR Lind (1995). Minimizing a weighted quadratic function of job lateness in the single machine system. International Journal of Production Economics, 42, 237-243.
-
(1995)
International Journal of Production Economics
, vol.42
, pp. 237-243
-
-
Sen, T.1
Dileepan, P.2
Lind, M.R.3
-
12
-
-
0032114993
-
A heuristic to minimize a quadratic function of job lateness on a single machine
-
Su, L-H and P-C Chang (1998). A heuristic to minimize a quadratic function of job lateness on a single machine. International Journal of Production Economics, 55, 169-175.
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 169-175
-
-
Su, L.-H.1
Chang, P.-C.2
-
13
-
-
0032628094
-
Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
-
Sun, X, JS Noble and CM Klein (1999). Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness. IIE Transactions, 31, 113-124.
-
(1999)
IIE Transactions
, vol.31
, pp. 113-124
-
-
Sun, X.1
Noble, J.S.2
Klein, C.M.3
-
15
-
-
84969451575
-
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
-
Valente, JMS (2006). Heuristics for the single machine scheduling problem with early and quadratic tardy penalties. European Journal of Industrial Engineering, 1, 431-448.
-
(2006)
European Journal of Industrial Engineering
, vol.1
, pp. 431-448
-
-
Valente, J.M.S.1
-
17
-
-
0036626376
-
The production of several items in a single facility with linearly changing demand rates
-
Wagner, BJ, DJ Davis and H Kher (2002). The production of several items in a single facility with linearly changing demand rates. Decision Sciences, 33, 317-346.
-
(2002)
Decision Sciences
, vol.33
, pp. 317-346
-
-
Wagner, B.J.1
Davis, D.J.2
Kher, H.3
|