메뉴 건너뛰기




Volumn 21, Issue 4, 2008, Pages 396-406

Modelling of multi-stage production lines with maintenance operations

Author keywords

Buffers; Multi stage production; Preventive maintenance; Reliability; Simulation

Indexed keywords

CLOSED FORM SOLUTIONS; CORRECTIVE AND PREVENTIVE MAINTENANCE; CORRECTIVE MAINTENANCE (CM); ITERATIVE SIMULATION; MAINTENANCE OPERATIONS; MULTI-STAGE; PREVENTIVE MAINTENANCE (PM); PRODUCTION LINES; PRODUCTION LOSSES; PRODUCTION OUTPUTS; RANDOM CAUSES; RANDOM FAILURES; STORAGE UNITS; SYSTEMS MANAGEMENT; TOOL CHANGES;

EID: 47749144776     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920701575112     Document Type: Article
Times cited : (10)

References (38)
  • 1
    • 47749111128 scopus 로고    scopus 로고
    • An integrated simulation-genetic algorithm model for buffer allocation in unreliable production lines
    • Amman, Jordan, 23-27 September
    • Al-Harkan, I.M. and Al-Fawzan, M.A. An integrated simulation-genetic algorithm model for buffer allocation in unreliable production lines, First International Industrial Engineering Conference, Amman, Jordan, 23-27 September 2001, pp. 397-405.
    • (2001) First International Industrial Engineering Conference , pp. 397-405
    • Al-Harkan, I.M.1    Al-Fawzan, M.A.2
  • 2
    • 0023533125 scopus 로고
    • Matrix- geometric and recursive algorithm solution of a two-stage unreliable flow line
    • Buzacott, J.A. and Kostelski, D., Matrix- geometric and recursive algorithm solution of a two-stage unreliable flow line. AIIE Trans, 1987, 19, 429-438.
    • (1987) AIIE Trans , vol.19 , pp. 429-438
    • Buzacott, J.A.1    Kostelski, D.2
  • 3
    • 29744459910 scopus 로고    scopus 로고
    • Maintenance resources optimization applied to a manufacturing system
    • Castro, H.F.D. and Cavalce, K.L., Maintenance resources optimization applied to a manufacturing system. Reliability Engng System Safety, 2006, 91, 413-420.
    • (2006) Reliability Engng System Safety , vol.91 , pp. 413-420
    • Castro, H.F.D.1    Cavalce, K.L.2
  • 4
    • 0023981046 scopus 로고
    • The role of work-in-process inventories in series production lines
    • Conway, R.W., Maxwell, W.L., McClain, J.O. and Thomas, L.J., The role of work-in-process inventories in series production lines. Ops Res., 1988, 36, 229-241.
    • (1988) Ops Res , vol.36 , pp. 229-241
    • Conway, R.W.1    Maxwell, W.L.2    McClain, J.O.3    Thomas, L.J.4
  • 5
    • 0026417692 scopus 로고
    • A survey of maintenance models for multi-unit systems
    • Cho, I.D. and Parlar, M., A survey of maintenance models for multi-unit systems. Eur. J. Opl Res., 1991, 51, 1-23.
    • (1991) Eur. J. Opl Res , vol.51 , pp. 1-23
    • Cho, I.D.1    Parlar, M.2
  • 6
    • 0023366315 scopus 로고
    • A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
    • Choong, Y.F. and Gershwin, S.B., A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. IIE Trans, 1989, 19, 150-158.
    • (1989) IIE Trans , vol.19 , pp. 150-158
    • Choong, Y.F.1    Gershwin, S.B.2
  • 7
    • 0031337014 scopus 로고    scopus 로고
    • Homogenization techniques for the analysis of production lines with unreliable machines having different speeds
    • Dallery, Y. and Le Bihan, H., Homogenization techniques for the analysis of production lines with unreliable machines having different speeds. Eur. J. Control, 1997, 3, 200-215.
    • (1997) Eur. J. Control , vol.3 , pp. 200-215
    • Dallery, Y.1    Le Bihan, H.2
  • 8
    • 0030106093 scopus 로고    scopus 로고
    • Applications of maintenance optimization models: A review and analysis
    • Dekker, R., Applications of maintenance optimization models: a review and analysis. Reliability Engng System Safety, 1996, 51, 229-240.
    • (1996) Reliability Engng System Safety , vol.51 , pp. 229-240
    • Dekker, R.1
  • 10
    • 0020721475 scopus 로고
    • Modeling and analysis of three stage transfer lines with unreliable machines and finite buffers
    • Gershwin, S.B. and Schick, I.C., Modeling and analysis of three stage transfer lines with unreliable machines and finite buffers. Ops Res., 1983, 31, 354-379.
    • (1983) Ops Res , vol.31 , pp. 354-379
    • Gershwin, S.B.1    Schick, I.C.2
  • 11
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Gershwin, S.B., An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Ops Res., 1987, 35, 291-305.
    • (1987) Ops Res , vol.35 , pp. 291-305
    • Gershwin, S.B.1
  • 12
    • 0034418438 scopus 로고    scopus 로고
    • Efficient algorithms for buffer space allocation
    • Gershwin, S.B. and Schor, J.E., Efficient algorithms for buffer space allocation. Annls Ops Res., 2000, 93, 117-144.
    • (2000) Annls Ops Res , vol.93 , pp. 117-144
    • Gershwin, S.B.1    Schor, J.E.2
  • 13
    • 0027912836 scopus 로고
    • The throughput rate of multi-station unreliable production lines
    • Heavey, C., Papadopoulos, H.D. and Browne, J., The throughput rate of multi-station unreliable production lines. Eur. J. Opl Res., 1993, 68, 69-89.
    • (1993) Eur. J. Opl Res , vol.68 , pp. 69-89
    • Heavey, C.1    Papadopoulos, H.D.2    Browne, J.3
  • 14
    • 0001012830 scopus 로고
    • The effect of the coefficient of variation of operation times on the allocation of storage space in production line system
    • Hillier, F.S. and So, K.C., The effect of the coefficient of variation of operation times on the allocation of storage space in production line system. IIE Trans, 1991, 23, 198-206.
    • (1991) IIE Trans , vol.23 , pp. 198-206
    • Hillier, F.S.1    So, K.C.2
  • 15
    • 0027251210 scopus 로고
    • Notes: Toward characterizing the optimal allocation of storage space in production line systems with variable processing times
    • Hillier, F.S., So, K.C. and Boling, R.W., Notes: toward characterizing the optimal allocation of storage space in production line systems with variable processing times. Mgmt Sci., 1993, 39, 126-133.
    • (1993) Mgmt Sci , vol.39 , pp. 126-133
    • Hillier, F.S.1    So, K.C.2    Boling, R.W.3
  • 16
    • 0026634465 scopus 로고
    • Determination of optimal intermediate storage capacity
    • Houshyar, A., Determination of optimal intermediate storage capacity. Comput. Ind. Engng, 1992, 22, 9-18.
    • (1992) Comput. Ind. Engng , vol.22 , pp. 9-18
    • Houshyar, A.1
  • 17
    • 0038475612 scopus 로고    scopus 로고
    • Efficiently solving the redundancy allocation problem using tabu search
    • Kulturel-Konak, S., Smith, A.E. and Coit, D.W., Efficiently solving the redundancy allocation problem using tabu search. IIE Trans, 2003, 35, 515-526.
    • (2003) IIE Trans , vol.35 , pp. 515-526
    • Kulturel-Konak, S.1    Smith, A.E.2    Coit, D.W.3
  • 18
    • 16244374307 scopus 로고    scopus 로고
    • Optimal preventive maintenance of a production system with an intermediate buffer
    • Kyriakidis, E.G. and Dimitrakos, T.D., Optimal preventive maintenance of a production system with an intermediate buffer. Eur. J. Opl Res., 2006, 168, 86-99.
    • (2006) Eur. J. Opl Res , vol.168 , pp. 86-99
    • Kyriakidis, E.G.1    Dimitrakos, T.D.2
  • 19
    • 0035283561 scopus 로고    scopus 로고
    • Structure optimization for continuous production systems with buffers under reliability constraints
    • Levitin, G. and Meizin, L., Structure optimization for continuous production systems with buffers under reliability constraints. Int. J. Prod. Econ., 2001, 70, 77-787.
    • (2001) Int. J. Prod. Econ , vol.70 , pp. 77-787
    • Levitin, G.1    Meizin, L.2
  • 20
    • 0025414457 scopus 로고
    • Approximate models of assembly systems with finite banks
    • Liu, X-G. and Buzacott, J.A., Approximate models of assembly systems with finite banks. Eur. J. Opl Res., 1990, 45, 145-154.
    • (1990) Eur. J. Opl Res , vol.45 , pp. 145-154
    • Liu, X.-G.1    Buzacott, J.A.2
  • 21
    • 0022863538 scopus 로고
    • The allocation of inter-stage buffer storage capacity in production lines
    • Mak, K.L., The allocation of inter-stage buffer storage capacity in production lines. Comput. Ind. Engng, 1986, 10, 163-169.
    • (1986) Comput. Ind. Engng , vol.10 , pp. 163-169
    • Mak, K.L.1
  • 22
    • 0024862759 scopus 로고
    • A computer algorithm for determining optimal buffer size in a serial flow production system
    • Mohanty, R.P., Dey, D. and Kulkarni, R.V., A computer algorithm for determining optimal buffer size in a serial flow production system. Comput. Ind. Engng, 1989, 16, 75-86.
    • (1989) Comput. Ind. Engng , vol.16 , pp. 75-86
    • Mohanty, R.P.1    Dey, D.2    Kulkarni, R.V.3
  • 24
    • 0030570340 scopus 로고    scopus 로고
    • Queuing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H.T. and Heavey, C., Queuing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. Eur. J. Opl Res., 1996, 92, 1-27.
    • (1996) Eur. J. Opl Res , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 25
    • 0031199591 scopus 로고    scopus 로고
    • A model management system (MMS) for the design and operation of production lines
    • Papadopoulos, H.T. and Vouros, G.A., A model management system (MMS) for the design and operation of production lines. Int. J. Prod. Res., 1996, 35, 2213-2236.
    • (1996) Int. J. Prod. Res , vol.35 , pp. 2213-2236
    • Papadopoulos, H.T.1    Vouros, G.A.2
  • 26
    • 0000816262 scopus 로고
    • Buffer allocation in unbalanced three-station serial lines
    • Powel, S.G., Buffer allocation in unbalanced three-station serial lines. Int. J. Prod. Res., 1994, 32, 2201-2217.
    • (1994) Int. J. Prod. Res , vol.32 , pp. 2201-2217
    • Powel, S.G.1
  • 27
    • 0029735339 scopus 로고    scopus 로고
    • Allocation of buffers to serial production lines with bottlenecks
    • Powel, S.G. and Pyke, D.F., Allocation of buffers to serial production lines with bottlenecks. IIE Trans, 1996, 28, 18-29.
    • (1996) IIE Trans , vol.28 , pp. 18-29
    • Powel, S.G.1    Pyke, D.F.2
  • 28
    • 0021427333 scopus 로고
    • Two-stage production lines with single repair crew
    • Savsar, M. and Biles, W.E., Two-stage production lines with single repair crew. Int. J. Prod. Res., 1984, 22, 499-514.
    • (1984) Int. J. Prod. Res , vol.22 , pp. 499-514
    • Savsar, M.1    Biles, W.E.2
  • 29
    • 3543053535 scopus 로고    scopus 로고
    • Simulation analysis of maintenance policies in just-in-time production systems
    • Savsar, M., Simulation analysis of maintenance policies in just-in-time production systems. Int. J. Ops Prod. Mgmt, 1997, 17, 256-266.
    • (1997) Int. J. Ops Prod. Mgmt , vol.17 , pp. 256-266
    • Savsar, M.1
  • 30
    • 47749118155 scopus 로고    scopus 로고
    • Savsar, M. and Youssef, A.S., An integrated simulation-neural network meta model application in designing production flow lines. WSEAS Trans Electronics, 2004, 2, 366-371.
    • Savsar, M. and Youssef, A.S., An integrated simulation-neural network meta model application in designing production flow lines. WSEAS Trans Electronics, 2004, 2, 366-371.
  • 31
    • 27744581624 scopus 로고    scopus 로고
    • Effects of maintenance policies on the productivity of flexible manufacturing cells
    • Savsar, M., Effects of maintenance policies on the productivity of flexible manufacturing cells. Omega, 2006, 34, 274-282.
    • (2006) Omega , vol.34 , pp. 274-282
    • Savsar, M.1
  • 32
    • 0028456013 scopus 로고
    • A decision model for corrective maintenance management
    • Sheu, C. and Krajewski, L.J., A decision model for corrective maintenance management. Int. J. Prod. Res., 1994, 32, 1365-1382.
    • (1994) Int. J. Prod. Res , vol.32 , pp. 1365-1382
    • Sheu, C.1    Krajewski, L.J.2
  • 34
    • 0011653696 scopus 로고
    • Buffer size planning versus transfer line efficiency
    • Villa, A., Fassino, B. and Rossetto, S., Buffer size planning versus transfer line efficiency. J. Engng Ind., 1986, 108, 105-112.
    • (1986) J. Engng Ind , vol.108 , pp. 105-112
    • Villa, A.1    Fassino, B.2    Rossetto, S.3
  • 35
    • 0032351556 scopus 로고    scopus 로고
    • Buffer allocation in unreliable production lines using a knowledge based system
    • Vouros, G.A. and Papadopoulos, H.T., Buffer allocation in unreliable production lines using a knowledge based system. Comput. Ops Res., 1998, 25, 1055-1067
    • (1998) Comput. Ops Res , vol.25 , pp. 1055-1067
    • Vouros, G.A.1    Papadopoulos, H.T.2
  • 36
    • 43949142709 scopus 로고    scopus 로고
    • A heuristic algorithm for buffer allocation in unreliable production lines
    • Vouros, G.A., Vidalis, M.I. and Papadopoulos, H.T., A heuristic algorithm for buffer allocation in unreliable production lines. Int. J. Quantitative Methods, 2000, 6, 23-43.
    • (2000) Int. J. Quantitative Methods , vol.6 , pp. 23-43
    • Vouros, G.A.1    Vidalis, M.I.2    Papadopoulos, H.T.3
  • 37
    • 2442432546 scopus 로고    scopus 로고
    • a case study
    • Maintenance concept development
    • Waeyenbergh, G. and Pintelon, L., Maintenance concept development: a case study. Int. J. Prod. Econ., 2004, 89, 395-405.
    • (2004) Int. J. Prod. Econ , vol.89 , pp. 395-405
    • Waeyenbergh, G.1    Pintelon, L.2
  • 38
    • 0023366797 scopus 로고
    • A general model of a production line with intermediate buffer and station breakdown
    • Yeralan, S. and Muth, E.J., A general model of a production line with intermediate buffer and station breakdown. AIIE Trans, 1987, 19, 130-139
    • (1987) AIIE Trans , vol.19 , pp. 130-139
    • Yeralan, S.1    Muth, E.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.