메뉴 건너뛰기




Volumn , Issue , 2007, Pages 1666-1671

Economic batch quantity with setup time for immediate and delayed rework

Author keywords

Economic batch quantity; Imperfect production; Rework

Indexed keywords

AUTOMATION; COMPUTER NETWORKS; EXHIBITIONS; INDUSTRIAL ENGINEERING; PROJECT MANAGEMENT; SYSTEMS ENGINEERING; TECHNOLOGY;

EID: 44949111630     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (12)
  • 1
    • 3242721026 scopus 로고
    • EBQ for a Mmulti Stage Production System Considering Rework
    • Chakrabarty, S., and Rao, N.V., 1988, "EBQ for a Mmulti Stage Production System Considering Rework," Opsearch, 25(2), 75-88.
    • (1988) Opsearch , vol.25 , Issue.2 , pp. 75-88
    • Chakrabarty, S.1    Rao, N.V.2
  • 4
    • 0035470201 scopus 로고    scopus 로고
    • Production Lot Sizing with the Reworking of Imperfect Quality Item Produced
    • Hayek, P.A., and Salameh, M.K., 2001, "Production Lot Sizing with the Reworking of Imperfect Quality Item Produced," Production Planning and Control, 12(6), 584 - 590.
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 5
    • 3242701287 scopus 로고    scopus 로고
    • Optimal Manufacturing Batch Size with Retwork Process at a Single-Stage Production System
    • Jamal, A.M.M., Sarker, B.R., and Mondel, S., 2004, "Optimal Manufacturing Batch Size with Retwork Process at a Single-Stage Production System," Computers & Industrial Engineering, 47(1), 77-89.
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.1 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondel, S.3
  • 7
    • 0001012373 scopus 로고
    • Lot Sizing to Reduce Capacity Utilization in Production Process with Defective Item, Process Corrections, and Rework
    • Lee, H.L., 1992, "Lot Sizing to Reduce Capacity Utilization in Production Process with Defective Item, Process Corrections, and Rework," Management Science, 38(9), 1314 -1328.
    • (1992) Management Science , vol.38 , Issue.9 , pp. 1314-1328
    • Lee, H.L.1
  • 8
    • 0022676316 scopus 로고
    • Economic Production Cycles with Imperfect Production Processes
    • Lee, H.L., and Rosenblat, M.J., 1986, "Economic Production Cycles with Imperfect Production Processes," IIE Transactions, 18(1), 48-55.
    • (1986) IIE Transactions , vol.18 , Issue.1 , pp. 48-55
    • Lee, H.L.1    Rosenblat, M.J.2
  • 9
    • 0031237390 scopus 로고    scopus 로고
    • Optimal Batch Size and Investment in Multistage Production Systems with Scrap
    • Lee, H.H., Chandra, M.J., and Deleveaux, V.J., 1997, "Optimal Batch Size and Investment in Multistage Production Systems with Scrap," Production Planning and Control, 8(6), 586-596.
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 586-596
    • Lee, H.H.1    Chandra, M.J.2    Deleveaux, V.J.3
  • 11
    • 0022613610 scopus 로고
    • Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
    • Porteus, E.L., 1986, "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, 34(1), 137-144.
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 137-144
    • Porteus, E.L.1
  • 12
    • 0019083768 scopus 로고
    • Optimal Inventory Polices when Stock outs Result from Defective Product
    • Shih, W., 1980, "Optimal Inventory Polices when Stock outs Result from Defective Product," International Journal of Production Research, 18(6), 677-686.
    • (1980) International Journal of Production Research , vol.18 , Issue.6 , pp. 677-686
    • Shih, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.