-
1
-
-
0030102183
-
Primary production scheduling at steelmaking industries
-
Lee H.S., Murthy S.S., Haider S.W., and Morse D.V. Primary production scheduling at steelmaking industries. IBM Journal of Research and Development 40 2 (1996) 231-252
-
(1996)
IBM Journal of Research and Development
, vol.40
, Issue.2
, pp. 231-252
-
-
Lee, H.S.1
Murthy, S.S.2
Haider, S.W.3
Morse, D.V.4
-
2
-
-
0033892353
-
A mathematical programming model for scheduling steelmaking-continuous casting production
-
Tang L., Liu J., Rong A., and Yang Z. A mathematical programming model for scheduling steelmaking-continuous casting production. European Journal of Operational Research 120 (2000) 423-435
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 423-435
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
3
-
-
0033741404
-
A multiple traveling salesman problem model for hot rolling scheduling in Shangai Baoshan Iron & Steel Complex
-
Tang L., Liu J., Rong A., and Yang Z. A multiple traveling salesman problem model for hot rolling scheduling in Shangai Baoshan Iron & Steel Complex. European Journal of Operational Research 124 (2000) 267-282
-
(2000)
European Journal of Operational Research
, vol.124
, pp. 267-282
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
4
-
-
0035899628
-
A review of planning and scheduling systems and methods for integrated steel production
-
Tang L., Liu J., Rong A., and Yang Z. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research 133 (2001) 1-20
-
(2001)
European Journal of Operational Research
, vol.133
, pp. 1-20
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
5
-
-
44849088598
-
-
Dutta G, Fourer R. A survey of mathematical programming application in integrated steel plants. Interactive transactions of ORMS, vol. 4, (1).
-
Dutta G, Fourer R. A survey of mathematical programming application in integrated steel plants. Interactive transactions of ORMS, vol. 4, (1).
-
-
-
-
6
-
-
44849091093
-
-
Basu S, Dutta G, Seth R. A survey of the applications of non-optimization techniques in an integrated steel plant, 2004, 〈www.iimahd.ernet.in/∼goutam〉.
-
Basu S, Dutta G, Seth R. A survey of the applications of non-optimization techniques in an integrated steel plant, 2004, 〈www.iimahd.ernet.in/∼goutam〉.
-
-
-
-
7
-
-
44849105068
-
-
Wright JR, Houck MH. An application of systems modeling in steel production scheduling. Engineering software IV. In: Proceedings of the fourth international conference, Kensington Exhibition Center, London, England; 1985. p. 15.127-40.
-
Wright JR, Houck MH. An application of systems modeling in steel production scheduling. Engineering software IV. In: Proceedings of the fourth international conference, Kensington Exhibition Center, London, England; 1985. p. 15.127-40.
-
-
-
-
10
-
-
85002949113
-
Synchronized scheduling method in manufacturing steel sheets
-
Tamura R., Nagai M., Nakagawa Y., Tanizaki T., and Nakajima H. Synchronized scheduling method in manufacturing steel sheets. International Transactions in Operational Research 5 3 (1998) 189-199
-
(1998)
International Transactions in Operational Research
, vol.5
, Issue.3
, pp. 189-199
-
-
Tamura, R.1
Nagai, M.2
Nakagawa, Y.3
Tanizaki, T.4
Nakajima, H.5
-
11
-
-
0036542527
-
An efficient scheduling algorithm for the hot coil making in the steel mini-mill
-
Park H., Hong Y., and Chang S.Y. An efficient scheduling algorithm for the hot coil making in the steel mini-mill. Production Planning & Control 13 3 (2002) 298-306
-
(2002)
Production Planning & Control
, vol.13
, Issue.3
, pp. 298-306
-
-
Park, H.1
Hong, Y.2
Chang, S.Y.3
-
12
-
-
0032345070
-
Modeling rolling batch planning as vehicle routing problem with time windows
-
Chen X., Wan W., and Xu X. Modeling rolling batch planning as vehicle routing problem with time windows. Computers & Operations Research 25 12 (1998) 1127-1136
-
(1998)
Computers & Operations Research
, vol.25
, Issue.12
, pp. 1127-1136
-
-
Chen, X.1
Wan, W.2
Xu, X.3
-
13
-
-
10644258880
-
Finishing line scheduling in the steel industry
-
Okano H., Davenport A.J., Trumbo M., Reddy C., Yoda K., and Amano M. Finishing line scheduling in the steel industry. IBM Journal of Research and Development 48 5/6 (2004) 811-830
-
(2004)
IBM Journal of Research and Development
, vol.48
, Issue.5-6
, pp. 811-830
-
-
Okano, H.1
Davenport, A.J.2
Trumbo, M.3
Reddy, C.4
Yoda, K.5
Amano, M.6
-
14
-
-
33750079846
-
-
Kapanoglu M, Koc IO. A multi-population parallel genetic algorithm for highly constrained continuous galvanizing line scheduling. Lecture notes in computer science, vol. 4030. Book Hybrid Metaheuristics; 2006. p. 28-41.
-
Kapanoglu M, Koc IO. A multi-population parallel genetic algorithm for highly constrained continuous galvanizing line scheduling. Lecture notes in computer science, vol. 4030. Book Hybrid Metaheuristics; 2006. p. 28-41.
-
-
-
-
16
-
-
0026880377
-
Discrete event sequencing as a traveling salesman problem
-
Kosiba E.D., Wright J.R., and Cobbs A.E. Discrete event sequencing as a traveling salesman problem. Computers in Industry 19 (1992) 317-327
-
(1992)
Computers in Industry
, vol.19
, pp. 317-327
-
-
Kosiba, E.D.1
Wright, J.R.2
Cobbs, A.E.3
-
17
-
-
0032000378
-
Evaluation of ordering strategies for constraint satisfaction reactive scheduling
-
Suh M.S., Lee A., Lee Y.J., and Ko Y.K. Evaluation of ordering strategies for constraint satisfaction reactive scheduling. Decision Support Systems 22 (1998) 187-197
-
(1998)
Decision Support Systems
, vol.22
, pp. 187-197
-
-
Suh, M.S.1
Lee, A.2
Lee, Y.J.3
Ko, Y.K.4
-
18
-
-
44849137030
-
-
Okano H, Morioka T, Yoda K. A heuristic solution for the continuous galvanizing line scheduling problem in a steel mill. Research Report RT-0478, IBM Tokyo Research Laboratory, 1623-14 Shimo-tsuruma, Yamato-shi, Kanagawa-ken 242-8502, Japan; 2002.
-
Okano H, Morioka T, Yoda K. A heuristic solution for the continuous galvanizing line scheduling problem in a steel mill. Research Report RT-0478, IBM Tokyo Research Laboratory, 1623-14 Shimo-tsuruma, Yamato-shi, Kanagawa-ken 242-8502, Japan; 2002.
-
-
-
-
19
-
-
0004048738
-
-
Springer, New York
-
Blazewicz J., Ecker K.H., Schmidt G., and Weglarz J. Scheduling in computer and manufacturing systems (1994), Springer, New York
-
(1994)
Scheduling in computer and manufacturing systems
-
-
Blazewicz, J.1
Ecker, K.H.2
Schmidt, G.3
Weglarz, J.4
-
24
-
-
0001059374
-
Tabu thresholding: improved search by nonmonotonic trajectories
-
Glover F. Tabu thresholding: improved search by nonmonotonic trajectories. ORSA Journal on Computing 7 4 (1993) 426-442
-
(1993)
ORSA Journal on Computing
, vol.7
, Issue.4
, pp. 426-442
-
-
Glover, F.1
|