-
2
-
-
0021168311
-
Berstein reliability model: Derivation and estimation of parameters
-
Ahmad M, Sheikh AK (1984) Berstein reliability model: derivation and estimation of parameters. Rel Eng 8:131-148
-
(1984)
Rel Eng
, vol.8
, pp. 131-148
-
-
Ahmad, M.1
Sheikh, A.K.2
-
3
-
-
0037316821
-
Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
-
Akturk MS, Ghosh JB, Gunes ED (2002) Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Naval Res Logist 50:15-30
-
(2002)
Naval Res Logist
, vol.50
, pp. 15-30
-
-
Akturk, M.S.1
Ghosh, J.B.2
Gunes, E.D.3
-
4
-
-
0026114841
-
General optimization model for multi-tool manufacturing systems
-
10
-
Billatos SB, Kendall LAA (1991) General optimization model for multi-tool manufacturing systems. Trans ASME 113(10):10-16
-
(1991)
Trans ASME
, vol.113
, pp. 10-16
-
-
Billatos, S.B.1
Kendall, L.A.A.2
-
8
-
-
0027591340
-
A synthesis of decision models for tool management in automated manufacturing
-
Gray E, Seidmann A, Stecke KE (1993) A synthesis of decision models for tool management in automated manufacturing. Manage Sci 39:549-567
-
(1993)
Manage Sci
, vol.39
, pp. 549-567
-
-
Gray, E.1
Seidmann, A.2
Stecke, K.E.3
-
9
-
-
33244482813
-
Job ordering and management of wearing tools in flexible manufacturing
-
2
-
Hirvikorpi M, Knuutila T, Nevalainen O (2006) Job ordering and management of wearing tools in flexible manufacturing. Eng Optimiz 38(2):227-244
-
(2006)
Eng Optimiz
, vol.38
, pp. 227-244
-
-
Hirvikorpi, M.1
Knuutila, T.2
Nevalainen, O.3
-
10
-
-
0030570341
-
Optimal solutions for the machining economics problem with stochastically distributed tool lives
-
1
-
Iakovou E, Ip CM, Koulamas C (1996) Optimal solutions for the machining economics problem with stochastically distributed tool lives. Eur J Oper Res 92(1):63-68
-
(1996)
Eur J Oper Res
, vol.92
, pp. 63-68
-
-
Iakovou, E.1
Ip, C.M.2
Koulamas, C.3
-
11
-
-
0015432917
-
A probabilistic approach to the determination of the optimum cutting conditions
-
4
-
Iawata K, Murostu Y, Iwatsubo T, Fujii S (1972) A probabilistic approach to the determination of the optimum cutting conditions. J Eng Ind Ser B 94(4):1099-1107
-
(1972)
J Eng Ind ser B
, vol.94
, pp. 1099-1107
-
-
Iawata, K.1
Murostu, Y.2
Iwatsubo, T.3
Fujii, S.4
-
12
-
-
0030701443
-
Economical optimization of tool replacement intervals
-
1
-
Jianqiang M, Keow LM (1997) Economical optimization of tool replacement intervals. Int Manuf Syst 8(1): 59-62
-
(1997)
Int Manuf Syst
, vol.8
, pp. 59-62
-
-
Jianqiang, M.1
Keow, L.M.2
-
14
-
-
0026897390
-
Single machine flow-time scheduling with scheduled maintenance
-
Lee CY, Liman SD (1992) Single machine flow-time scheduling with scheduled maintenance. Acta Inform 29:375-382
-
(1992)
Acta Inform
, vol.29
, pp. 375-382
-
-
Lee, C.Y.1
Liman, S.D.2
-
15
-
-
0000541519
-
Machine scheduling with an availability constraint
-
Lee CY (1996) Machine scheduling with an availability constraint. J Glob Optim 9:395-416
-
(1996)
J Glob Optim
, vol.9
, pp. 395-416
-
-
Lee, C.Y.1
-
16
-
-
0000049036
-
Minimizing the makespan in two-machine flowshop scheduling problem with an availability constraint
-
Lee CY (1997) Minimizing the makespan in two-machine flowshop scheduling problem with an availability constraint. Oper Res Lett 20:129-139
-
(1997)
Oper Res Lett
, vol.20
, pp. 129-139
-
-
Lee, C.Y.1
-
18
-
-
0033446820
-
Scheduling the maintenance on a single machine
-
Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071-1078
-
(1999)
J Oper Res Soc
, vol.50
, pp. 1071-1078
-
-
Qi, X.1
Chen, T.2
Tu, F.3
-
20
-
-
33244478559
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer RH, Wu DS, Vaccari R (1983) New search spaces for sequencing problems with application to job shop scheduling. Manage Sci 29:273-288
-
(1983)
Manage Sci
, vol.29
, pp. 273-288
-
-
Storer, R.H.1
Wu, D.S.2
Vaccari, R.3
-
21
-
-
0024070715
-
Models arising from a flexible manufacturing machine
-
5
-
Tang CS, Denardo EV (1988) Models arising from a flexible manufacturing machine. Oper Res 36(5):767-784
-
(1988)
Oper Res
, vol.36
, pp. 767-784
-
-
Tang, C.S.1
Denardo, E.V.2
-
22
-
-
0242269881
-
Non-identical parallel CNC machine scheduling
-
10
-
Turkcan A, Akturk MS, Storer RH (2003) Non-identical parallel CNC machine scheduling. Int J Prod Res 41(10):2143-2168
-
(2003)
Int J Prod Res
, vol.41
, pp. 2143-2168
-
-
Turkcan, A.1
Akturk, M.S.2
Storer, R.H.3
|