메뉴 건너뛰기




Volumn 19, Issue 4, 2007, Pages 443-462

Job scheduling and management of wearing tools with stochastic tool lifetimes

Author keywords

CNC manufacturing; Heuristic algorithms; Job scheduling; Stochastic tool lifetimes; Tool wear

Indexed keywords

GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; MACHINING; RANDOM PROCESSES; SCHEDULING;

EID: 44649180677     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10696-008-9043-y     Document Type: Article
Times cited : (10)

References (22)
  • 1
    • 0024944070 scopus 로고
    • Single machine flow-time scheduling with a single breakdown
    • Adiri IJ, Bruno E, Frostig AHG, Rinnooy K (1989) Single machine flow-time scheduling with a single breakdown. Acta Inform 26:679-696
    • (1989) Acta Inform , vol.26 , pp. 679-696
    • Adiri, I.J.1    Bruno, E.2    Frostig, A.H.G.3    Rinnooy, K.4
  • 2
    • 0021168311 scopus 로고
    • Berstein reliability model: Derivation and estimation of parameters
    • Ahmad M, Sheikh AK (1984) Berstein reliability model: derivation and estimation of parameters. Rel Eng 8:131-148
    • (1984) Rel Eng , vol.8 , pp. 131-148
    • Ahmad, M.1    Sheikh, A.K.2
  • 3
    • 0037316821 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
    • Akturk MS, Ghosh JB, Gunes ED (2002) Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Naval Res Logist 50:15-30
    • (2002) Naval Res Logist , vol.50 , pp. 15-30
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 4
    • 0026114841 scopus 로고
    • General optimization model for multi-tool manufacturing systems
    • 10
    • Billatos SB, Kendall LAA (1991) General optimization model for multi-tool manufacturing systems. Trans ASME 113(10):10-16
    • (1991) Trans ASME , vol.113 , pp. 10-16
    • Billatos, S.B.1    Kendall, L.A.A.2
  • 8
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray E, Seidmann A, Stecke KE (1993) A synthesis of decision models for tool management in automated manufacturing. Manage Sci 39:549-567
    • (1993) Manage Sci , vol.39 , pp. 549-567
    • Gray, E.1    Seidmann, A.2    Stecke, K.E.3
  • 9
    • 33244482813 scopus 로고    scopus 로고
    • Job ordering and management of wearing tools in flexible manufacturing
    • 2
    • Hirvikorpi M, Knuutila T, Nevalainen O (2006) Job ordering and management of wearing tools in flexible manufacturing. Eng Optimiz 38(2):227-244
    • (2006) Eng Optimiz , vol.38 , pp. 227-244
    • Hirvikorpi, M.1    Knuutila, T.2    Nevalainen, O.3
  • 10
    • 0030570341 scopus 로고    scopus 로고
    • Optimal solutions for the machining economics problem with stochastically distributed tool lives
    • 1
    • Iakovou E, Ip CM, Koulamas C (1996) Optimal solutions for the machining economics problem with stochastically distributed tool lives. Eur J Oper Res 92(1):63-68
    • (1996) Eur J Oper Res , vol.92 , pp. 63-68
    • Iakovou, E.1    Ip, C.M.2    Koulamas, C.3
  • 11
    • 0015432917 scopus 로고
    • A probabilistic approach to the determination of the optimum cutting conditions
    • 4
    • Iawata K, Murostu Y, Iwatsubo T, Fujii S (1972) A probabilistic approach to the determination of the optimum cutting conditions. J Eng Ind Ser B 94(4):1099-1107
    • (1972) J Eng Ind ser B , vol.94 , pp. 1099-1107
    • Iawata, K.1    Murostu, Y.2    Iwatsubo, T.3    Fujii, S.4
  • 12
    • 0030701443 scopus 로고    scopus 로고
    • Economical optimization of tool replacement intervals
    • 1
    • Jianqiang M, Keow LM (1997) Economical optimization of tool replacement intervals. Int Manuf Syst 8(1): 59-62
    • (1997) Int Manuf Syst , vol.8 , pp. 59-62
    • Jianqiang, M.1    Keow, L.M.2
  • 14
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • Lee CY, Liman SD (1992) Single machine flow-time scheduling with scheduled maintenance. Acta Inform 29:375-382
    • (1992) Acta Inform , vol.29 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2
  • 15
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • Lee CY (1996) Machine scheduling with an availability constraint. J Glob Optim 9:395-416
    • (1996) J Glob Optim , vol.9 , pp. 395-416
    • Lee, C.Y.1
  • 16
    • 0000049036 scopus 로고    scopus 로고
    • Minimizing the makespan in two-machine flowshop scheduling problem with an availability constraint
    • Lee CY (1997) Minimizing the makespan in two-machine flowshop scheduling problem with an availability constraint. Oper Res Lett 20:129-139
    • (1997) Oper Res Lett , vol.20 , pp. 129-139
    • Lee, C.Y.1
  • 18
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on a single machine
    • Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071-1078
    • (1999) J Oper Res Soc , vol.50 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 20
    • 33244478559 scopus 로고
    • New search spaces for sequencing problems with application to job shop scheduling
    • Storer RH, Wu DS, Vaccari R (1983) New search spaces for sequencing problems with application to job shop scheduling. Manage Sci 29:273-288
    • (1983) Manage Sci , vol.29 , pp. 273-288
    • Storer, R.H.1    Wu, D.S.2    Vaccari, R.3
  • 21
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine
    • 5
    • Tang CS, Denardo EV (1988) Models arising from a flexible manufacturing machine. Oper Res 36(5):767-784
    • (1988) Oper Res , vol.36 , pp. 767-784
    • Tang, C.S.1    Denardo, E.V.2
  • 22
    • 0242269881 scopus 로고    scopus 로고
    • Non-identical parallel CNC machine scheduling
    • 10
    • Turkcan A, Akturk MS, Storer RH (2003) Non-identical parallel CNC machine scheduling. Int J Prod Res 41(10):2143-2168
    • (2003) Int J Prod Res , vol.41 , pp. 2143-2168
    • Turkcan, A.1    Akturk, M.S.2    Storer, R.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.