-
1
-
-
0037316821
-
Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
-
Akturk, M.S., Ghosh, J.B. and Gunes, E.D, Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Nav. Res. Logistics, 2002, 50, 15-30.
-
(2002)
Nav. Res. Logistics
, vol.50
, pp. 15-30
-
-
Akturk, M.S.1
Ghosh, J.B.2
Gunes, E.D.3
-
2
-
-
0030263614
-
Tool allocation and machining conditions optimization for CNC machines
-
Akturk, M.S. and Avci, S., Tool allocation and machining conditions optimization for CNC machines. Eur: J. Operational Res., 1996, 94, 335-348.
-
(1996)
Eur: J. Operational Res.
, vol.94
, pp. 335-348
-
-
Akturk, M.S.1
Avci, S.2
-
3
-
-
0024140442
-
A heuristic for minimizing the number of tool switches on a flexible machine
-
Bard, J.F., A heuristic for minimizing the number of tool switches on a flexible machine. IIE Trans., 1988, 20(4), 382-391.
-
(1988)
IIE Trans.
, vol.20
, Issue.4
, pp. 382-391
-
-
Bard, J.F.1
-
4
-
-
33244463772
-
-
Prentice-Hall: Englewood Cliffs, NJ
-
Brassard, G. and Bratley, P., Fundementals of Algorithmus, pp. 205-207, 1996 (Prentice-Hall: Englewood Cliffs, NJ).
-
(1996)
Fundementals of Algorithmus
, pp. 205-207
-
-
Brassard, G.1
Bratley, P.2
-
5
-
-
85023843371
-
Allocation of bandwidth and storage
-
Chen, B., Hassin, R. and Tzur, M., Allocation of bandwidth and storage. IIE Trans., 2002, 34, 501-507.
-
(2002)
IIE Trans.
, vol.34
, pp. 501-507
-
-
Chen, B.1
Hassin, R.2
Tzur, M.3
-
6
-
-
0003415664
-
The approximability of tool management problems
-
Maastricht Economic Research School on Technology and Organisation
-
Crama, Y., and Klundert, J., The approximability of tool management problems. Technical Report rm96034, Maastricht Economic Research School on Technology and Organisation, 1996.
-
(1996)
Technical Report Rm96034
-
-
Crama, Y.1
Klundert, J.2
-
7
-
-
0028014137
-
Minimizing the number of tool switches on a flexible machine
-
Crama, Y., Kolen, A.W. J., Oerlemans, A.G. and Spieksma, F.C.R., Minimizing the number of tool switches on a flexible machine. Int. J. Flexible Mfg Syst., 1994, 6, 33-53.
-
(1994)
Int. J. Flexible Mfg Syst.
, vol.6
, pp. 33-53
-
-
Crama, Y.1
Kolen, A.W.J.2
Oerlemans, A.G.3
Spieksma, F.C.R.4
-
8
-
-
0027591340
-
A synthesis of decision models for tool management in automated manufacturing
-
Gray, E., Seidmann, A. and Stecke, K.E., A synthesis of decision models for tool management in automated manufacturing. Mgmt Sci., 1993, 39, 549-567.
-
(1993)
Mgmt Sci.
, vol.39
, pp. 549-567
-
-
Gray, E.1
Seidmann, A.2
Stecke, K.E.3
-
9
-
-
6944232644
-
Grouping PCB assembly jobs with typed component feeder units
-
Knuutila, T., Hirvikorpi, M., Johnsson, M. and Nevalainen, O.S., Grouping PCB assembly jobs with typed component feeder units. Int. J. Flexible Mfg, 2004, 16(2), 151-167.
-
(2004)
Int. J. Flexible Mfg
, vol.16
, Issue.2
, pp. 151-167
-
-
Knuutila, T.1
Hirvikorpi, M.2
Johnsson, M.3
Nevalainen, O.S.4
-
10
-
-
0032131897
-
Heuristics for minimizing tool switches when scheduling parts types on a flexible machine
-
Hertz, A., Laporte, G., Mittaz, M. and Stecke, K.E., Heuristics for minimizing tool switches when scheduling parts types on a flexible machine. IIE Trans., 1998, 300, 689-694.
-
(1998)
IIE Trans.
, vol.300
, pp. 689-694
-
-
Hertz, A.1
Laporte, G.2
Mittaz, M.3
Stecke, K.E.4
-
11
-
-
11844298367
-
Grouping of PCB assembly jobs in the case of flexible feeder units
-
Hirvikorpi, M., Knuutila, T., Johnsson, M. and Nevalainen, O.S., Grouping of PCB assembly jobs in the case of flexible feeder units. Engng Optimization, 2005, 37(1), 29-48.
-
(2005)
Engng Optimization
, vol.37
, Issue.1
, pp. 29-48
-
-
Hirvikorpi, M.1
Knuutila, T.2
Johnsson, M.3
Nevalainen, O.S.4
-
12
-
-
28044434900
-
General two level storage management problem-reconsideration of the KTNS-rule
-
Hirvikorpi, M., Salonen, K., Knuutila, T. and Nevalainen, O.S., General two level storage management problem-reconsideration of the KTNS-rule. Eur. J. Operational Res., 2006, 171(1), 189-207.
-
(2006)
Eur. J. Operational Res.
, vol.171
, Issue.1
, pp. 189-207
-
-
Hirvikorpi, M.1
Salonen, K.2
Knuutila, T.3
Nevalainen, O.S.4
-
13
-
-
0033898298
-
Storage management of items in two levels of availability
-
Matzliach, B. and Tzur, M., Storage management of items in two levels of availability. Eur. J. Operational Res., 2000, 121, 363-379.
-
(2000)
Eur. J. Operational Res.
, vol.121
, pp. 363-379
-
-
Matzliach, B.1
Tzur, M.2
-
14
-
-
0004255908
-
-
McGraw-Hill: New York
-
Mitchell, T. M., Machine Learning, pp. 249-270, 1997 (McGraw-Hill: New York).
-
(1997)
Machine Learning
, pp. 249-270
-
-
Mitchell, T.M.1
-
15
-
-
0033446820
-
Scheduling the maintenance on a single machine
-
Qi, X., Chen, T. and Tu, F., Scheduling the maintenance on a single machine. J. Operations Res. Soc., 1999, 50, 1071-1078.
-
(1999)
J. Operations Res. Soc.
, vol.50
, pp. 1071-1078
-
-
Qi, X.1
Chen, T.2
Tu, F.3
-
17
-
-
0038510816
-
-
PhD thesis, TUCS dissertation 36, University of Turku and Turku Centre for Computer Science
-
Smed, J., Production planning in printed circuit board assembly. PhD thesis, TUCS dissertation 36, University of Turku and Turku Centre for Computer Science, 2002.
-
(2002)
Production Planning in Printed Circuit Board Assembly
-
-
Smed, J.1
-
18
-
-
33244478559
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer, R.H., Wu, D.S and Vaccari, R., New search spaces for sequencing problems with application to job shop scheduling. Mgmt Sci., 1983, 29, 273-288.
-
(1983)
Mgmt Sci.
, vol.29
, pp. 273-288
-
-
Storer, R.H.1
Wu, D.S.2
Vaccari, R.3
-
19
-
-
0024070715
-
Models arising from a flexible manufacturing machine
-
Tang, C.S. and Denardo, E.V., Models arising from a flexible manufacturing machine. Operations Res., 1988, 36(5), 767-784.
-
(1988)
Operations Res.
, vol.36
, Issue.5
, pp. 767-784
-
-
Tang, C.S.1
Denardo, E.V.2
-
20
-
-
1642461408
-
Minimization of tool switches for a flexible manufacturing machine with slot assignment of different tool sizes
-
Tzar, M. and Altman, A., Minimization of tool switches for a flexible manufacturing machine with slot assignment of different tool sizes. IIE Trans., 2004, 36, 95-100.
-
(2004)
IIE Trans.
, vol.36
, pp. 95-100
-
-
Tzar, M.1
Altman, A.2
|