메뉴 건너뛰기




Volumn , Issue , 2007, Pages 658-663

A decomposition method with cut generation for simultaneous production scheduling and routing for multiple AGVs

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; LAGRANGE MULTIPLIERS; NUMERICAL METHODS; PROBLEM SOLVING; SCHEDULING;

EID: 44449175696     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/COASE.2007.4341680     Document Type: Conference Paper
Times cited : (3)

References (7)
  • 1
    • 0031124354 scopus 로고    scopus 로고
    • A Genetic Algorithm Approach to the Simultaneous Scheduling of Machines and Automated Guided Vehicles
    • G. Ulusoy, F. Sivrikaya-Srifoglu, U. Bilge, A Genetic Algorithm Approach to the Simultaneous Scheduling of Machines and Automated Guided Vehicles, Computers Ops. Res., Vol. 24. No. 4, pp. 335-351, 1997
    • (1997) Computers Ops. Res , vol.24 , Issue.4 , pp. 335-351
    • Ulusoy, G.1    Sivrikaya-Srifoglu, F.2    Bilge, U.3
  • 2
    • 33749665423 scopus 로고    scopus 로고
    • Scheduling and Routing of Automated Guided Vehicles:A hybrid approach
    • A. I. Corréa, A. Langevin, L.-M. Rousseau, Scheduling and Routing of Automated Guided Vehicles:A hybrid approach, Computers and Operations Research, Vol. 34, No. 6, pp. 1688-1707, 2007
    • (2007) Computers and Operations Research , vol.34 , Issue.6 , pp. 1688-1707
    • Corréa, A.I.1    Langevin, A.2    Rousseau, L.-M.3
  • 3
    • 33748920331 scopus 로고    scopus 로고
    • Integrated Production and Material Handling Scheduling using Mathematical Programming and Constraint Programming
    • G. E. Khayat, A. Langevin, D. Riopel, Integrated Production and Material Handling Scheduling using Mathematical Programming and Constraint Programming, Eur. J. Opr. Res., Vol. 175, No. 3, pp. 1818-1832, 2006
    • (2006) Eur. J. Opr. Res , vol.175 , Issue.3 , pp. 1818-1832
    • Khayat, G.E.1    Langevin, A.2    Riopel, D.3
  • 4
    • 30444434197 scopus 로고    scopus 로고
    • A Decomposition Method for the Simultaneous Planning and Scheduling of Single Stage Continuous Multiproduct Plants
    • M. Erdirik Dogan and I. E. Grossmann, A Decomposition Method for the Simultaneous Planning and Scheduling of Single Stage Continuous Multiproduct Plants, Ind. Eng. Chem. Res., Vol. 45, pp. 299-315, 2006
    • (2006) Ind. Eng. Chem. Res , vol.45 , pp. 299-315
    • Erdirik Dogan, M.1    Grossmann, I.E.2
  • 5
    • 29844437910 scopus 로고    scopus 로고
    • Distributed Route Planning for Multiple Mobile Robots using an Augmented Lagrangian Decomposition Technique
    • Nishi, T., Ando, M., Konishi, M., 2005, "Distributed Route Planning for Multiple Mobile Robots using an Augmented Lagrangian Decomposition Technique", IEEE Transactions on Robotics, Vol. 22, No. 6, pp. 1191-1200.
    • (2005) IEEE Transactions on Robotics , vol.22 , Issue.6 , pp. 1191-1200
    • Nishi, T.1    Ando, M.2    Konishi, M.3
  • 6
    • 0005314463 scopus 로고    scopus 로고
    • R.J. Mantel, H.R.A. Landeweerd: Mantel, R.J. and Landeweerd, H.R.A., 1995, Design and operational control of an AGV system, Int. J. Production Economics, 41, pp. 257-266.
    • R.J. Mantel, H.R.A. Landeweerd: Mantel, R.J. and Landeweerd, H.R.A., 1995, "Design and operational control of an AGV system", Int. J. Production Economics, Vol. 41, pp. 257-266.
  • 7
    • 0029179964 scopus 로고    scopus 로고
    • H. Chen, C. Chu and J. M. Proth, A More Efficient Lagrangian Relaxation Approach to Job-Shop Scheduling Problems, 1995 IEEE Int. Conf. Robotics and Automation, pp. 495-501, 1995
    • H. Chen, C. Chu and J. M. Proth, A More Efficient Lagrangian Relaxation Approach to Job-Shop Scheduling Problems, 1995 IEEE Int. Conf. Robotics and Automation, pp. 495-501, 1995


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.