메뉴 건너뛰기




Volumn 28, Issue 13, 2008, Pages 41-46

New strategy for short-term scheduling optimization of cascade hydro plants based on chance-constrained programming

Author keywords

Cascade hydro plants; Chance constrained programming; Monte carlo simulation; Particle swarm optimization; Short term optimization scheduling; Uncertainty

Indexed keywords

MONTE CARLO METHODS; PROBABILITY; SCHEDULING;

EID: 44449089531     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (17)

References (21)
  • 1
    • 3142730878 scopus 로고    scopus 로고
    • A long-term scheduling model for stored energy maximization of three gorges cascade hydroelectric stations and its decomposition algorithm
    • in Chinese
    • Zeng Yonghong, Jiang Tiebing, Zhang Yongchuan. A long-term scheduling model for stored energy maximization of three gorges cascade hydroelectric stations and its decomposition algorithm[J]. Power System Technology, 2004, 28(10): 5-8(in Chinese).
    • (2004) Power System Technology , vol.28 , Issue.10 , pp. 5-8
    • Zeng, Y.1    Jiang, T.2    Zhang, Y.3
  • 2
    • 24944489292 scopus 로고    scopus 로고
    • A medium-term integrated risk management model for a hydrothermal generation company
    • Cabero J, Baillo A, Cerisola S, et al. A medium-term integrated risk management model for a hydrothermal generation company[J]. IEEE Trans on Power Systems, 2005, 20(3): 1379-1388.
    • (2005) IEEE Trans on Power Systems , vol.20 , Issue.3 , pp. 1379-1388
    • Cabero, J.1    Baillo, A.2    Cerisola, S.3
  • 3
    • 0037292136 scopus 로고    scopus 로고
    • Optimal reliable operation of hydrothermal power systems with random unit outages
    • Amjady N, Farrokhzad D, Modarres M. Optimal reliable operation of hydrothermal power systems with random unit outages[J]. IEEE Transactions on Power Systems, 2003, 18(1): 279-287.
    • (2003) IEEE Transactions on Power Systems , vol.18 , Issue.1 , pp. 279-287
    • Amjady, N.1    Farrokhzad, D.2    Modarres, M.3
  • 4
    • 13844308349 scopus 로고    scopus 로고
    • Reliability analysis for systems with large hydro resources in a deregulated electric power market
    • González C, Juan J, Mira J, et al. Reliability analysis for systems with large hydro resources in a deregulated electric power market[J]. IEEE Transactions on Power Systems, 2005, 20(1): 90-95.
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.1 , pp. 90-95
    • González, C.1    Juan, J.2    Mira, J.3
  • 5
    • 0344899138 scopus 로고    scopus 로고
    • Study on bidding price of cascaded hydro plants in spot transaction
    • in Chinese
    • Cai Xingguo, Lin Shiying, Ma Ping. Study on bidding price of cascaded hydro plants in spot transaction[J]. Proceedings of the CSEE, 2003, 23(8): 56-59(in Chinese).
    • (2003) Proceedings of the CSEE , vol.23 , Issue.8 , pp. 56-59
    • Cai, X.1    Lin, S.2    Ma, P.3
  • 6
    • 4043080873 scopus 로고    scopus 로고
    • Study on optimal operational of cascaded hydropower plants in electricity market
    • in Chinese
    • Cai Xingguo, Lin Shiying, Ma Ping, et al. Study on optimal operational of cascaded hydropower plants in electricity market[J]. Power System Technology, 2003, 27(9): 6-9(in Chinese).
    • (2003) Power System Technology , vol.27 , Issue.9 , pp. 6-9
    • Cai, X.1    Lin, S.2    Ma, P.3
  • 7
    • 33747387170 scopus 로고    scopus 로고
    • Short-term scheduling optimization of cascade hydro plants via triangle gyration algorithm
    • in Chinese
    • Zuo Xing, Ma Guangwen, Guo Xiaming. Short-term scheduling optimization of cascade hydro plants via triangle gyration algorithm[J]. Automation of Electric Power Systems, 2006, 30(13): 28-32(in Chinese).
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.13 , pp. 28-32
    • Zuo, X.1    Ma, G.2    Guo, X.3
  • 8
    • 0036474056 scopus 로고    scopus 로고
    • Optimal dispatch of generating units of itaipú hydroelectric plant
    • Arce A, Ohishi T, Soares S. Optimal dispatch of generating units of itaipú hydroelectric plant[J]. IEEE Transactions on Power Systems, 2002, 17(2): 154-158.
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.2 , pp. 154-158
    • Arce, A.1    Ohishi, T.2    Soares, S.3
  • 9
    • 0037291089 scopus 로고    scopus 로고
    • Lagrangian heuristics based on disaggregated bundle methods for hydrothermal unit commitment
    • Borghetti A, Frangioni A, Lacalandra F, et al. Lagrangian heuristics based on disaggregated bundle methods for hydrothermal unit commitment[J]. IEEE Transactions on Power Systems, 2003, 18(1): 313-322.
    • (2003) IEEE Transactions on Power Systems , vol.18 , Issue.1 , pp. 313-322
    • Borghetti, A.1    Frangioni, A.2    Lacalandra, F.3
  • 10
    • 0344826834 scopus 로고    scopus 로고
    • Medium-term hydrothermal coordination by semidefinite programming
    • Fuentes-Loyola R, Quintana V H. Medium-term hydrothermal coordination by semidefinite programming[J]. IEEE Transactions on Power Systems, 2003, 18(4): 1515-1522.
    • (2003) IEEE Transactions on Power Systems , vol.18 , Issue.4 , pp. 1515-1522
    • Fuentes-Loyola, R.1    Quintana, V.H.2
  • 11
    • 10944249439 scopus 로고    scopus 로고
    • Peak load dispatching of three gorges power system
    • in Chinese
    • He Guangyu, Wang Zhen, Pei Zheyi, et a1. Peak load dispatching of three gorges power system[J]. Power System Technology, 2003, 27(10): 12-16(in Chinese).
    • (2003) Power System Technology , vol.27 , Issue.10 , pp. 12-16
    • He, G.1    Wang, Z.2    Pei, Z.3
  • 12
    • 4644221992 scopus 로고    scopus 로고
    • Transmission system expansion planning based on chance constrained programming
    • in Chinese
    • Yang Ning, Wen Fushuan. Transmission system expansion planning based on chance constrained programming[J]. Automation of Electric Power Systems, 2004, 28(14): 23-27(in Chinese).
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.14 , pp. 23-27
    • Yang, N.1    Wen, F.2
  • 13
    • 27644519176 scopus 로고    scopus 로고
    • Bidding strategy of power generation company using chance-constrained programming
    • in Chinese
    • Gao Chunfeng, Jiang Hui, Peng Jianchun. Bidding strategy of power generation company using chance-constrained programming[J]. Power System Technology, 2005, 29(19): 75-78(in Chinese).
    • (2005) Power System Technology , vol.29 , Issue.19 , pp. 75-78
    • Gao, C.1    Jiang, H.2    Peng, J.3
  • 14
    • 44449131884 scopus 로고    scopus 로고
    • Optimization calculation of power system security cost based on chance constrained programming
    • in Chinese
    • Li Jinyan, Wu Jiekang. Optimization calculation of power system security cost based on chance constrained programming[J]. Power System Technology, 2006, 30(4): 78-81(in Chinese).
    • (2006) Power System Technology , vol.30 , Issue.4 , pp. 78-81
    • Li, J.1    Wu, J.2
  • 15
    • 4043072671 scopus 로고    scopus 로고
    • A solution to the stochastic unit comm.-itment problem using chance constrained programming
    • Ozturk U A, Mazumdar M. A solution to the stochastic unit comm.-itment problem using chance constrained programming[J]. IEEE Transactions on Power Systems, 2004, 19(3): 1589-1598.
    • (2004) IEEE Transactions on Power Systems , vol.19 , Issue.3 , pp. 1589-1598
    • Ozturk, U.A.1    Mazumdar, M.2
  • 20
    • 24344477079 scopus 로고    scopus 로고
    • Short-term electricity price forecasting based on period-decoupled price sequence
    • in Chinese
    • Zhang Xian, Wang Xifan, Chen Fanghua, et al. Short-term electricity price forecasting based on period-decoupled price sequence[J]. Proceedings of the CSEE, 2005, 25(15): 1-6(in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.15 , pp. 1-6
    • Zhang, X.1    Wang, X.2    Chen, F.3
  • 21
    • 26644442793 scopus 로고    scopus 로고
    • Study on hybrid model for system marginal price forecasting in electricity market
    • in Chinese
    • Zheng Hua, Xie Li, Zhang Lizi, et al. Study on hybrid model for system marginal price forecasting in electricity market[J]. Proceedings of the CSEE, 2005, 25(17): 66-71(in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.17 , pp. 66-71
    • Zheng, H.1    Xie, L.2    Zhang, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.