메뉴 건너뛰기




Volumn 12, Issue 1, 2001, Pages 61-88

Sequencing with Ordered Criteria, Precedence and Group Technology Constraints

Author keywords

Group technology; Multiple criteria; Optimization; Precedence constraints; Scheduling theory; Sequencing

Indexed keywords


EID: 0347138143     PISSN: 08684952     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (9)

References (33)
  • 1
    • 0019058590 scopus 로고
    • Single machine scheduling to minimize weighted sum of completion times with secondary criterion
    • Bansal, S.P. (1980). Single machine scheduling to minimize weighted sum of completion times with secondary criterion. Europ. J. Oper. Res., 5, 177-181.
    • (1980) Europ. J. Oper. Res. , vol.5 , pp. 177-181
    • Bansal, S.P.1
  • 3
    • 0016936801 scopus 로고
    • Scheduling to minimize the weighted sum of completion times with secondary criteria
    • Burns, R.N. (1976). Scheduling to minimize the weighted sum of completion times with secondary criteria. Naval. Res. Logist. Quart., 23, 125-129.
    • (1976) Naval. Res. Logist. Quart. , vol.23 , pp. 125-129
    • Burns, R.N.1
  • 4
    • 0027912254 scopus 로고
    • Complexity of single machine multi-criteria scheduling problems
    • Chen, C.-L., R.L. Bulfin (1993). Complexity of single machine multi-criteria scheduling problems. Eur. J. Oper. Res., 70, 115-125.
    • (1993) Eur. J. Oper. Res. , vol.70 , pp. 115-125
    • Chen, C.-L.1    Bulfin, R.L.2
  • 5
    • 0002218558 scopus 로고
    • Bicriterion static scheduling research for a single machine
    • Dileepan, P., P. Sen (1988). Bicriterion static scheduling research for a single machine. Omega, 16, 53-59.
    • (1988) Omega , vol.16 , pp. 53-59
    • Dileepan, P.1    Sen, P.2
  • 6
    • 0000434305 scopus 로고
    • A note on a scheduling problem with dual criteria
    • Emmons, H. (1975). A note on a scheduling problem with dual criteria. Naval. Res. Logist. Quart., 22, 615-616.
    • (1975) Naval. Res. Logist. Quart. , vol.22 , pp. 615-616
    • Emmons, H.1
  • 7
    • 0345679391 scopus 로고
    • Optimal ordering with series-parallel precedence constraints
    • in Russian
    • Gordon, V.S., Y.M. Shafransky (1978). Optimal ordering with series-parallel precedence constraints. Doklady Akademii Nauk BSSR, 22(3), 244-247 (in Russian).
    • (1978) Doklady Akademii Nauk BSSR , vol.22 , Issue.3 , pp. 244-247
    • Gordon, V.S.1    Shafransky, Y.M.2
  • 9
    • 0003560479 scopus 로고
    • A note on the extension of a result on scheduling with secondary criteria
    • Heck, H., S.A. Roberts (1972). A note on the extension of a result on scheduling with secondary criteria. Naval. Res. Logist. Quart., 19, 403-405.
    • (1972) Naval. Res. Logist. Quart. , vol.19 , pp. 403-405
    • Heck, H.1    Roberts, S.A.2
  • 10
    • 0001253255 scopus 로고
    • Optimal sequencing of a single machine subject to precedence constraints
    • Lawler, E.L. (1973). Optimal sequencing of a single machine subject to precedence constraints. Management Science, 19(5), 544-546.
    • (1973) Management Science , vol.19 , Issue.5 , pp. 544-546
    • Lawler, E.L.1
  • 11
    • 0010916439 scopus 로고
    • Recent results in the theory of machine scheduling
    • A. Bachem, M. Grötschel and B. Korte (Ed.). Springer, Berlin
    • Lawler, E.L. (1983). Recent results in the theory of machine scheduling. In A. Bachem, M. Grötschel and B. Korte (Ed.), Mathematical Programming: the State of Art. Springer, Berlin, pp. 202-234.
    • (1983) Mathematical Programming: The State of Art , pp. 202-234
    • Lawler, E.L.1
  • 12
    • 0003988826 scopus 로고
    • Sequencing and scheduling: Algorithms and complexity
    • Center for Mathematics and Computer Science, Amsterdam
    • Lawler, E.L., J.K. Lenstra, A.H.G. Rinnooy Kan, D.B. Shmoys (1989). Sequencing and scheduling: Algorithms and complexity. Technical Report BS-R8909, Center for Mathematics and Computer Science, Amsterdam.
    • (1989) Technical Report BS-R8909
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3    Shmoys, D.B.4
  • 14
    • 85041790308 scopus 로고
    • The sequence of operations for complex detail production
    • in Russian
    • Livshitz, E.M. (1968). The sequence of operations for complex detail production. Avtomatika i Telemekhanika, 11, 94-95 (in Russian).
    • (1968) Avtomatika i Telemekhanika , vol.11 , pp. 94-95
    • Livshitz, E.M.1
  • 15
    • 0004433033 scopus 로고
    • An analytic solution to the least cost testing sequence problem
    • Mitten, L.G. (1960). An analytic solution to the least cost testing sequence problem. J. Industrial Engineering, 11, 17-23.
    • (1960) J. Industrial Engineering , vol.11 , pp. 17-23
    • Mitten, L.G.1
  • 16
    • 0006762642 scopus 로고
    • One machine scheduling problem with dual criteria
    • Miyazaki, S. (1981). One machine scheduling problem with dual criteria. J. Oper. Res. Soc. Japan, 24, 37-50.
    • (1981) J. Oper. Res. Soc. Japan , vol.24 , pp. 37-50
    • Miyazaki, S.1
  • 17
    • 0343827327 scopus 로고
    • Sequencing with general precedence constraints
    • Monma, C.L. (1981). Sequencing with general precedence constraints. Discrete Appl. Math., 3, 137-150.
    • (1981) Discrete Appl. Math. , vol.3 , pp. 137-150
    • Monma, C.L.1
  • 18
    • 0018501967 scopus 로고
    • Sequencing with series-parallel precedence constraints
    • Monma, C.L., J.B. Sidney (1979). Sequencing with series-parallel precedence constraints. Math. Oper. Res., 4, 215-224.
    • (1979) Math. Oper. Res. , vol.4 , pp. 215-224
    • Monma, C.L.1    Sidney, J.B.2
  • 19
    • 0023294434 scopus 로고
    • Optimal sequencing via modular decomposition: Characterization of sequencing functions
    • Monma, C.L., J.B. Sidney (1987). Optimal sequencing via modular decomposition: Characterization of sequencing functions. Math. Oper. Res., 12, 22-31.
    • (1987) Math. Oper. Res. , vol.12 , pp. 22-31
    • Monma, C.L.1    Sidney, J.B.2
  • 20
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimizing the number of late jobs
    • Moore, J.M. (1968). An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science, 15(1), 102-109.
    • (1968) Management Science , vol.15 , Issue.1 , pp. 102-109
    • Moore, J.M.1
  • 22
    • 0345767921 scopus 로고
    • On optimal sequencing for deterministic systems with tree-like partial order
    • in Russian
    • Shafransky, Y.M. (1978). On optimal sequencing for deterministic systems with tree-like partial order. Vestsi Akademii Navuk BSSR. Ser. Fizika-Matein. Navuk 2, 119-120 (in Russian).
    • (1978) Vestsi Akademii Navuk BSSR. Ser. Fizika-Matein. Navuk , vol.2 , pp. 119-120
    • Shafransky, Y.M.1
  • 23
    • 0345767978 scopus 로고
    • On a problem of minimizing functions over a set of permutations of partially ordered elements
    • in Russian
    • Shafransky, Y.M. (1980). On a problem of minimizing functions over a set of permutations of partially ordered elements. Vestsi Akademii Navuk BSSR. Ser. Fizika-Matem. Navuk 5, 132 (in Russian).
    • (1980) Vestsi Akademii Navuk BSSR. Ser. Fizika-Matem. Navuk , vol.5 , pp. 132
    • Shafransky, Y.M.1
  • 24
    • 0020633499 scopus 로고
    • Scheduling n jobs on one machine to minimize the maximal tardiness with minimum number tardy
    • Shanthikumar, J.G. (1983). Scheduling n jobs on one machine to minimize the maximal tardiness with minimum number tardy. Comput. and Oper. Res., 10, 255-266.
    • (1983) Comput. and Oper. Res. , vol.10 , pp. 255-266
    • Shanthikumar, J.G.1
  • 25
    • 0042511276 scopus 로고
    • Multiobjective project scheduling under multiple-category resource constraints
    • R. Slowinski and J. Weglon (Eds.). Elsevier Science Publishers B.U., Amsterdam
    • Slowinski, R. (1989). Multiobjective project scheduling under multiple-category resource constraints. In R. Slowinski and J. Weglon (Eds.), Advances in Project Scheduling. Elsevier Science Publishers B.U., Amsterdam.
    • (1989) Advances in Project Scheduling
    • Slowinski, R.1
  • 26
    • 0002066821 scopus 로고
    • Various optimizers for single stage production
    • Smith, W.E. (1956). Various optimizers for single stage production. Naval. Res. Logist. Quart., 3, 59-66.
    • (1956) Naval. Res. Logist. Quart. , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 31
    • 0001404569 scopus 로고
    • The recognition of series-parallel digraphs
    • Valdes, J., R.E. Tarjan, E.L. Lawler (1982). The recognition of series-parallel digraphs. SIAM J. Comput., 11, 298-313.
    • (1982) SIAM J. Comput. , vol.11 , pp. 298-313
    • Valdes, J.1    Tarjan, R.E.2    Lawler, E.L.3
  • 32
    • 0345767977 scopus 로고
    • Strongly NP-hardness results in the single machine secondary criterion scheduling problems with weigted flowtime or tardiness as one of the criteria
    • Yuan, J., Y. Zhao (1994). Strongly NP-hardness results in the single machine secondary criterion scheduling problems with weigted flowtime or tardiness as one of the criteria. ZOR.
    • (1994) ZOR
    • Yuan, J.1    Zhao, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.