메뉴 건너뛰기




Volumn 2, Issue , 2004, Pages 1368-1374

A hydro unit commitment model using genetic algorithm

Author keywords

Genetic Algorithms; Hydropower generation system; Power loss function; Pre dispatch

Indexed keywords

HYDRO UNITS; HYDROPOWER GENERATION SYSTEM; POWER LOSS FUNCTION; PRE-DISPATCH;

EID: 4344673386     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (15)

References (15)
  • 1
    • 0020750196 scopus 로고
    • A new method for unit commitment at Electricité de France
    • PAS, May
    • A. Merlin, P. Sandrin, "A new method for unit commitment at Electricité de France", IEEE Trans. on Power Apparatus and Systems, PAS-vol.102, no. 3, May 1983, pp. 1218-1225.
    • (1983) IEEE Trans. on Power Apparatus and Systems , vol.102 , Issue.3 , pp. 1218-1225
    • Merlin, A.1    Sandrin, P.2
  • 2
    • 0031079225 scopus 로고    scopus 로고
    • Hydro unit star-up costs and their impacts on the short term scheduling strategies of Swedish power producers
    • February
    • O. Nilsson and D. Sjelvgren, "Hydro unit star-up costs and their impacts on the short term scheduling strategies of Swedish power producers", IEEE Trans. on Power Systems, vol.12, no. 1, February 1997, pp. 38-43.
    • (1997) IEEE Trans. on Power Systems , vol.12 , Issue.1 , pp. 38-43
    • Nilsson, O.1    Sjelvgren, D.2
  • 4
    • 0031198406 scopus 로고    scopus 로고
    • Minimum loss predispatch model for hydroelectric power systems
    • August
    • S. Soares and C.T. Salmazo, "Minimum loss predispatch model for hydroelectric power systems", IEEE Trans. on Power Systems, vol.12, no. 3, August 1997, pp. 1220-1227.
    • (1997) IEEE Trans. on Power Systems , vol.12 , Issue.3 , pp. 1220-1227
    • Soares, S.1    Salmazo, C.T.2
  • 5
    • 0031142782 scopus 로고    scopus 로고
    • Variable splitting applied to modeling of start-up costs in short term hydro generation scheduling
    • paper 96-SM 493-6, July-August, Denver, Colorado
    • O. Nilsson, D. Sjelvgren, "Variable splitting applied to modeling of start-up costs in short term hydro generation scheduling", IEEE PES-99 Summer Meeting, paper 96-SM 493-6, July-August, 1996, Denver, Colorado.
    • (1996) IEEE PES-99 Summer Meeting
    • Nilsson, O.1    Sjelvgren, D.2
  • 6
    • 0033080313 scopus 로고    scopus 로고
    • Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
    • February
    • X. Guan, A. Svoboda, C. LI, "Scheduling hydro power systems with restricted operating zones and discharge ramping constraints", IEEE Trans. on Power Systems, vol.14, no. 1, February, 1999, pp. 126-131.
    • (1999) IEEE Trans. on Power Systems , vol.14 , Issue.1 , pp. 126-131
    • Guan, X.1    Svoboda, A.2    Li, C.3
  • 7
    • 0032140499 scopus 로고    scopus 로고
    • Integer modeling of spinning reserve requirements in short term scheduling of hydro systems
    • August
    • O. Nilsson, D. Sjelvgren, "Integer modeling of spinning reserve requirements in short term scheduling of hydro systems", IEEE Trans. on Power Systems, vol.13, no. 3, August 1998, pp. 959-964.
    • (1998) IEEE Trans. on Power Systems , vol.13 , Issue.3 , pp. 959-964
    • Nilsson, O.1    Sjelvgren, D.2
  • 8
    • 0036474056 scopus 로고    scopus 로고
    • Optimal dispatch of generating units of the itaipu hydroelectric plant
    • February
    • A. Arce, T. Ohishi, S. Soares, Optimal Dispatch of Generating Units of the Itaipu Hydroelectric Plant, IEEE Trans. on Power Systems, V. 17, N. 1, February, 2002, pp. 154-158.
    • (2002) IEEE Trans. on Power Systems , vol.17 , Issue.1 , pp. 154-158
    • Arce, A.1    Ohishi, T.2    Soares, S.3
  • 10
    • 0032073503 scopus 로고    scopus 로고
    • A genetic algorithm modeling framework and solution technique for short term optimal hydrothermal scheduling
    • May
    • S. O. Orero; M. R. Irving, "A genetic algorithm modeling framework and solution technique for short term optimal hydrothermal scheduling", IEEE Trans. on Power Systems, vol.13, no. 2, May 1998, pp. 501-517.
    • (1998) IEEE Trans. on Power Systems , vol.13 , Issue.2 , pp. 501-517
    • Orero, S.O.1    Irving, M.R.2
  • 11
    • 0030148470 scopus 로고    scopus 로고
    • Genetic aided scheduling of hydraulic coupled plants in hydro-thermal coordination
    • May
    • P. H. Chen and H. C. Chang, "Genetic aided scheduling of hydraulic coupled plants in hydro-thermal coordination", IEEE Trans. on Power Systems, Vol. 11, N. 2, May, 1996, pp. 975-981.
    • (1996) IEEE Trans. on Power Systems , vol.11 , Issue.2 , pp. 975-981
    • Chen, P.H.1    Chang, H.C.2
  • 13
    • 0036872194 scopus 로고    scopus 로고
    • A parallel repair genetic algorithm to solve the unit commitment problem
    • November
    • J. M. Arroyo, A. J. Conejo, "A parallel repair genetic algorithm to solve the unit commitment problem", IEEE Trans. On Power Systems, Vol. N. 4, November 2002, pp. 1216-1224.
    • (2002) IEEE Trans. on Power Systems , Issue.4 , pp. 1216-1224
    • Arroyo, J.M.1    Conejo, A.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.