3
-
-
33645107509
-
-
DOE-DP-STD-3023-98, (DOE LIMITED STANDARD), U.S. Department of Energy AREA MISC Washington, DC 20585
-
DOE-DP-STD-3023-98, (1998), GUIDELINES FOR RISK-BASED PRIORITIZATION OF DOE ACTIVITIES, (DOE LIMITED STANDARD), U.S. Department of Energy AREA MISC Washington, DC 20585.
-
(1998)
GUIDELINES for RISK-BASED PRIORITIZATION of DOE ACTIVITIES
-
-
-
4
-
-
55549140281
-
RCM helps operations get the most out of equipment
-
Ednie, H. (2004), RCM Helps Operations Get the Most Out of Equipment, CIM Bulletin, vol. 95, no.1065, pp. 20-25.
-
(2004)
CIM Bulletin
, vol.95
, Issue.1065
, pp. 20-25
-
-
Ednie, H.1
-
5
-
-
0742284492
-
Reducing maintenance cost through predictive fault detection
-
Faitakis, Y., C.Mackenzie and G.J. Powley, (2004), Reducing maintenance cost through predictive fault detection, CIM Bulletin, vol. 97, no.1076, pp. 63-66.
-
(2004)
CIM Bulletin
, vol.97
, Issue.1076
, pp. 63-66
-
-
Faitakis, Y.1
Mackenzie, C.2
Powley, G.J.3
-
6
-
-
55549095768
-
North american nuclear maintenance best practices compared to japanese utility maintenance practices
-
Toronto
-
Harazim, M.L, and J.B. Ferguson, (2003), North American Nuclear Maintenance Best Practices Compared to Japanese Utility Maintenance Practices, 24th Annual Conference of the Canadian Nuclear Society, Toronto.
-
(2003)
th Annual Conference of the Canadian Nuclear Society
-
-
Harazim, M.L.1
Ferguson, J.B.2
-
7
-
-
0347805024
-
-
Institute of Nuclear Power Operations (INPO), AP-913, Revision 1, Atlanta
-
Institute of Nuclear Power Operations (INPO), AP-913, Revision 1, Equipment Reliability Process Description, (2001), Atlanta.
-
(2001)
Equipment Reliability Process Description
-
-
-
10
-
-
23944479476
-
Approach regarding the implementation of S-98 reliability program at the gentilly-2 power plant considering AP-913 equipment reliability process
-
Toronto
-
Komljenovic, D., R. Vaillancourt, D. Messaoudi, (2004), Approach Regarding the Implementation of S-98 Reliability Program at the Gentilly-2 Power Plant Considering AP-913 Equipment Reliability Process, 25th Annual Conference of the Canadian Nuclear Society, Toronto.
-
(2004)
th Annual Conference of the Canadian Nuclear Society
-
-
Komljenovic, D.1
Vaillancourt, R.2
Messaoudi, D.3
-
11
-
-
0001241159
-
Analysing breakdowns
-
September
-
Knights, P.F., (1999), Analysing Breakdowns, Mining Magazine, Vol. 181, no.3 (September), pp. 165-171.
-
(1999)
Mining Magazine
, vol.181
, Issue.3
, pp. 165-171
-
-
Knights, P.F.1
-
12
-
-
55549117575
-
Best-in-class maintenance benchmarks in chilean open-pit mines
-
full text available on the, webpage
-
Knights, P. and P.Oyaneder; (2005) Best-in-class maintenance benchmarks in Chilean open-pit mines, CIM Bulletin, vol. 98, no.1088, p. 93 (full text available on the CIM webpage: www.cim.org).
-
(2005)
CIM Bulletin
, vol.98
, Issue.1088
, pp. 93
-
-
Knights, P.1
Oyaneder, P.2
-
13
-
-
55549088319
-
-
Lecture 5, Division of Mining Equipment Engineering, Lulea University of Technology, Lulea, Sweden
-
Kumar, U, (2003), Economic Aspects of Equipment Breakdowns in Mines and Control Measures, Lecture 5, Division of Mining Equipment Engineering, Lulea University of Technology, Lulea, Sweden.
-
(2003)
Economic Aspects of Equipment Breakdowns in Mines and Control Measures
-
-
Kumar, U.1
-
14
-
-
84892644354
-
-
Lecture 14, Division of Mining Equipment Engineering, Lulea University of Technology, Lulea, Sweden
-
Kumar, U, (2003), Reliability Technique - A Powerful Tool for Mine Operators, Lecture 13; Application of Reliability Centred Maintenance (RCM) Strategy, Lecture 14, Division of Mining Equipment Engineering, Lulea University of Technology, Lulea, Sweden.
-
(2003)
Reliability Technique - A Powerful Tool for Mine Operators, Lecture 13; Application of Reliability Centred Maintenance (RCM) Strategy
-
-
Kumar, U.1
-
15
-
-
0002697943
-
Remote-control monitoring cuts maintenance cost
-
Lewis, M.W., (2000), Remote-control monitoring cuts maintenance cost, Mining Engineering, Vol.52, No.8, pp. 15-19.
-
(2000)
Mining Engineering
, vol.52
, Issue.8
, pp. 15-19
-
-
Lewis, M.W.1
-
17
-
-
11244278737
-
Raglan mine
-
Maintenance at Falconbridge Ltd.'s
-
Mercier, E, P.Vallée, B.Tapp, R.Méthot and J.-M. Clouet, (2004), Maintenance at Falconbridge Ltd.'s Raglan Mine, CIM Bulletin, vol. 97, no.1084, pp. 53-58.
-
(2004)
CIM Bulletin
, vol.97
, Issue.1084
, pp. 53-58
-
-
Mercier, E.1
Vallée, P.2
Tapp, B.3
Méthot, R.4
Clouet, J.-M.5
-
18
-
-
84892650902
-
-
Ottawa
-
Messaoudi, D, G. Abdul-Nour, D. Komljenovic, R. Vaillancourt, (2003), RCM in Nuclear Power Plants, Canadian Reliability and Maintainability Symposium, Ottawa.
-
(2003)
RCM in Nuclear Power Plants, Canadian Reliability and Maintainability Symposium
-
-
Messaoudi, D.1
Abdul-Nour, G.2
Komljenovic, D.3
Vaillancourt, R.4
-
20
-
-
2642542421
-
-
editor-in-chief), 3rd edition. Clarion Technical Publishers
-
Mitchell, J.S. (editor-in-chief), (2002), Physical Asset Management Handbook, 3rd edition. Clarion Technical Publishers.
-
(2002)
Physical Asset Management Handbook
-
-
Mitchell, J.S.1
-
22
-
-
80051972635
-
-
NUREG-0800, Chapter 19, Revision 1 of Standard Review Plan Chapter 19, U.S. Nuclear Regulatory Commission, Washington, DC 20555-001
-
NUREG-0800, (2002), Chapter 19, USE OF PROBABILISTIC RISK ASSESSMENT IN PLANT-SPECIFIC, RISK-INFORMED DECISIONMAKING: GENERAL GUIDANCE, Revision 1 of Standard Review Plan Chapter 19, U.S. Nuclear Regulatory Commission, Washington, DC 20555-001.
-
(2002)
USE of probabilistic risk assessment in plant-specific, risk-informed decisionmaking: General Guidance
-
-
-
23
-
-
33747052695
-
-
NUREG-1513, U.S. Nuclear Regulatory Commission, Washington, DC 20555-001
-
NUREG-1513, (2001), Integrated Safety Analysis Guidance Document, U.S. Nuclear Regulatory Commission, Washington, DC 20555-001.
-
(2001)
Integrated Safety Analysis Guidance Document
-
-
-
24
-
-
0006518889
-
Benefits of studies on LHD reliability and availability for mines
-
Strakos et al. (Eds.), Ostrava, Czech Republic, 3-6 September
-
Paraszczak, J., J. Vachon and L. Grammond, (1997), Benefits of studies on LHD reliability and availability for mines, Proc. 6th Int. Symposium on Mine Planning and Equipment Selection, Strakos et al. (Eds.), Ostrava, Czech Republic, 3-6 September, pp. 469-475.
-
(1997)
th Int. Symposium on Mine Planning and Equipment Selection
, pp. 469-475
-
-
Paraszczak, J.1
Vachon, J.2
Grammond, L.3
-
25
-
-
84892645155
-
-
OMCS Ph 0419397035, Webpage
-
Turner, S., (2002), PM Optimization, Maintenance Analysis of the Future, OMCS Ph 0419397035, Webpage: http://www.pmoptimisation.com.au.
-
(2002)
Maintenance Analysis of the Future
-
-
Turner, S.1
|