-
2
-
-
0348167632
-
Short-term site-wise maintenance scheduling
-
Cheung, K.Y., Hui, C.W., Salamoti, H.O., Hirata, K.O. and O'Young, L.G. (2004) 'Short-term site-wise maintenance scheduling', Computers and Chemical Engineering, Vol. 28, Nos. 1-2, pp.91-102.
-
(2004)
Computers and Chemical Engineering
, vol.28
, Issue.1-2
, pp. 91-102
-
-
Cheung, K.Y.1
Hui, C.W.2
Salamoti, H.O.3
Hirata, K.O.4
O'Young, L.G.5
-
3
-
-
33947162394
-
Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
-
Dahal, K.P. and Chakpitak, N. (2007) 'Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches', Electric Power Systems Research, Vol. 77, No. 7, pp.771-779.
-
(2007)
Electric Power Systems Research
, vol.77
, Issue.7
, pp. 771-779
-
-
Dahal, K.P.1
Chakpitak, N.2
-
4
-
-
33846381038
-
Machine scheduling performance with maintenance and failure
-
Guo, Y., Lim, A., Rodrigues, B. and Yu, S. (2007) 'Machine scheduling performance with maintenance and failure', Mathematical and Computer Modelling, Vol. 45, Nos. 9-10, pp.1067-1080.
-
(2007)
Mathematical and Computer Modelling
, vol.45
, Issue.9-10
, pp. 1067-1080
-
-
Guo, Y.1
Lim, A.2
Rodrigues, B.3
Yu, S.4
-
5
-
-
33749681702
-
Single-machine scheduling with periodic maintenance to minimize makespan
-
Ji, M., He, Y. and Cheng, T.C.E. (2007) 'Single-machine scheduling with periodic maintenance to minimize makespan', Computers and Operations Research, Vol. 34, No. 6, pp.1764-1770.
-
(2007)
Computers and Operations Research
, vol.34
, Issue.6
, pp. 1764-1770
-
-
Ji, M.1
He, Y.2
Cheng, T.C.E.3
-
6
-
-
12344285382
-
Generating unit maintenance scheduling under competitive market environments
-
Kim, J.H., Park, J.B., Park, J.K. and Chun, Y.H. (2005) 'Generating unit maintenance scheduling under competitive market environments', International Journal of Electrical Power and Energy Systems, Vol. 27, No. 3, pp.189-194.
-
(2005)
International Journal of Electrical Power and Energy Systems
, vol.27
, Issue.3
, pp. 189-194
-
-
Kim, J.H.1
Park, J.B.2
Park, J.K.3
Chun, Y.H.4
-
7
-
-
33745860078
-
A new method for unit maintenance scheduling considering reliability and operation expense
-
Leou, R.C. (2006) 'A new method for unit maintenance scheduling considering reliability and operation expense', International Journal of Electrical Power and Energy Systems, Vol. 28, No. 7, pp.471-481.
-
(2006)
International Journal of Electrical Power and Energy Systems
, vol.28
, Issue.7
, pp. 471-481
-
-
Leou, R.C.1
-
8
-
-
4344664498
-
Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation
-
Mohanta, D.K., Sadhu, P.K. and Chakrabarti, R. (2004) 'Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation', Electric Power System Research, Vol. 72, pp.73-84.
-
(2004)
Electric Power System Research
, vol.72
, pp. 73-84
-
-
Mohanta, D.K.1
Sadhu, P.K.2
Chakrabarti, R.3
-
9
-
-
40749102685
-
Safety and reliability optimisation of captive power plants using intelligent maintenance scheduling
-
Mohanta, D.K., Sadhu, P.K. and Chakrabarti, R. (2006) 'Safety and reliability optimisation of captive power plants using intelligent maintenance scheduling', International Journal of Reliability and Safety, Vol. 1, Nos. 1/2, pp.155-167.
-
(2006)
International Journal of Reliability and Safety
, vol.1
, Issue.1-2
, pp. 155-167
-
-
Mohanta, D.K.1
Sadhu, P.K.2
Chakrabarti, R.3
-
10
-
-
33750358079
-
Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results
-
Mohanta, D.K., Sadhu, P.K. and Chakrabarti, R. (2007) 'Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: a comparison of results', Reliability Engineering and System Safety Vol. 92, No. 2, pp.187-199.
-
(2007)
Reliability Engineering and System Safety
, vol.92
, Issue.2
, pp. 187-199
-
-
Mohanta, D.K.1
Sadhu, P.K.2
Chakrabarti, R.3
-
11
-
-
14644396586
-
Reliability-based optimal maintenance scheduling by considering maintenance effect to reduce cost
-
Nakamura, M. and Zhang, T. (2005) 'Reliability-based optimal maintenance scheduling by considering maintenance effect to reduce cost', Quality and Reliability Engineering, International, Vol. 21, No. 2, pp.203-220.
-
(2005)
Quality and Reliability Engineering, International
, vol.21
, Issue.2
, pp. 203-220
-
-
Nakamura, M.1
Zhang, T.2
-
12
-
-
31144443602
-
Maintenance scheduling: Description, status, and future directions
-
Oke, S.A. (2004) 'Maintenance scheduling: Description, status, and future directions', South African Journal of Industrial Engineering Vol. 15, No. 1, pp.101-117.
-
(2004)
South African Journal of Industrial Engineering
, vol.15
, Issue.1
, pp. 101-117
-
-
Oke, S.A.1
-
13
-
-
33747124241
-
An inflation-based maintenance scheduling model
-
Oke, S.A. and Charles-Owaba, O.E. (2005a) 'An inflation-based maintenance scheduling model', South African Journal of Industrial Engineering, Vol. 16, No. 2, pp.123-142.
-
(2005)
South African Journal of Industrial Engineering
, vol.16
, Issue.2
, pp. 123-142
-
-
Oke, S.A.1
Charles-Owaba, O.E.2
-
14
-
-
31144460304
-
A sensitivity analysis of an optimal Gantt charting maintenance scheduling model
-
Oke, S.A. and Charles-Owaba, O.E. (2005b) 'A sensitivity analysis of an optimal Gantt charting maintenance scheduling model', International Journal of Quality and Reliability Management, Vol. 23, No. 2, pp.197-229.
-
(2005)
International Journal of Quality and Reliability Management
, vol.23
, Issue.2
, pp. 197-229
-
-
Oke, S.A.1
Charles-Owaba, O.E.2
-
15
-
-
33646348744
-
Application of fuzzy logic control model to Gantt charting preventive maintenance scheduling
-
Oke, S.A. and Charles-Owaba, O.E. (2005c) 'Application of fuzzy logic control model to Gantt charting preventive maintenance scheduling', International Journal of Quality and Reliability Management, Vol. 23, No. 4, pp.441-459.
-
(2005)
International Journal of Quality and Reliability Management
, vol.23
, Issue.4
, pp. 441-459
-
-
Oke, S.A.1
Charles-Owaba, O.E.2
-
16
-
-
42449123182
-
A fuzzy linguistic approach of preventive maintenance scheduling cost optimisation
-
Oke, S.A. and Charles-Owaba, O.E. (2007) 'A fuzzy linguistic approach of preventive maintenance scheduling cost optimisation', Kathmandu University Journal of Science, Engineering and Technology, Vol. I, No. III, pp.1-13.
-
(2007)
Kathmandu University Journal of Science, Engineering and Technology
, vol.1
, Issue.III
, pp. 1-13
-
-
Oke, S.A.1
Charles-Owaba, O.E.2
-
17
-
-
33751164384
-
A note on worst-case performance of heuristics for maintenance scheduling problems
-
Qi, X. (2007) 'A note on worst-case performance of heuristics for maintenance scheduling problems', Discrete Applied Mathematics, Vol. 155, No. 3, pp.416-422.
-
(2007)
Discrete Applied Mathematics
, vol.155
, Issue.3
, pp. 416-422
-
-
Qi, X.1
-
18
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
-
Quan, G., Greenwood, G.W., Liu, D. and Hu, S. (2007) 'Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms', European Journal of Operational Research, Vol. 177, No. 3, pp.1969-1984.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
19
-
-
33845605765
-
Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation
-
Zhou, X., Xi, L. and Lee, J. (2007) 'Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation', Reliability Engineering and System Safety, Vol. 92, No. 4, pp.530-534.
-
(2007)
Reliability Engineering and System Safety
, vol.92
, Issue.4
, pp. 530-534
-
-
Zhou, X.1
Xi, L.2
Lee, J.3
|