A review of recent advances on generator maintenance scheduling
-
Ahmad, A. and Kothari, D.P. (1998) ‘A review of recent advances on generator maintenance scheduling’, Electrical Machines and Power System, Vol. 26, No. 4.
-
(1998)
Electrical Machines and Power System
, vol.26
, Issue.4
-
-
Ahmad, A.1
Kothari, D.P.2
-
3
-
-
0015398090
-
Adjusting maintenance schedules to levelize risk
-
PAS-91
-
Graver, L.L. (1972) ‘Adjusting maintenance schedules to levelize risk’, IEEE Transactions on Power Apparatus and Systems, PAS-91, September/October, pp. 2057-2063.
-
(1972)
IEEE Transactions on Power Apparatus and Systems
, vol.September/October
, pp. 2057-2063
-
-
Graver, L.L.1
-
4
-
-
0031276372
-
Reliability analysis for hydrothermal generating systems including the effect of maintenance scheduling
-
PE-399-PWRS-0-12-1997
-
Juan, J. and Oretega, I. (1997) ‘Reliability analysis for hydrothermal generating systems including the effect of maintenance scheduling’, IEEE Transactions on Power Systems, PE-399-PWRS-0-12-1997.
-
(1997)
IEEE Transactions on Power Systems
-
-
Juan, J.1
Oretega, I.2
-
5
-
-
0005868488
-
Method for maintenance scheduling using GA combined with SA
-
Kim, H., Nara, Y. and Gen, M.A. (1994) ‘Method for maintenance scheduling using GA combined with SA’, Computer and Industrial Engineering, Vol. 27, pp.477–480.
-
(1994)
Computer and Industrial Engineering
, vol.27
, pp. 477-480
-
-
Kim, H.1
Nara, Y.2
Gen, M.A.3
-
6
-
-
26444479778
-
Optimisation by simulated annealing
-
Kirkpatrick, S., Gelatt Jr., C.D. and Vecchi, M.P. (1983) ‘Optimisation by simulated annealing’, Science, Vol. 220, pp.671–680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
7
-
-
4344664498
-
Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation
-
Mohanta, D.K., Sadhu, P.K. and Chakrabarti, R. (2004) ‘Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation’, Electrical Power System Research, Vol. 72, pp.73–84.
-
(2004)
Electrical Power System Research
, vol.72
, pp. 73-84
-
-
Mohanta, D.K.1
Sadhu, P.K.2
Chakrabarti, R.3
-
8
-
-
0026155671
-
Power plant maintenance scheduling: optimising economics and reliability
-
Mukerji, R., Parker, J.H., Merill, H.M. and Friedman, R.E. (1991) ‘Power plant maintenance scheduling: optimising economics and reliability’, IEEE Transactions on Power Systems, Vol. 6, No. 2, pp.476–481.
-
(1991)
IEEE Transactions on Power Systems
, vol.6
, Issue.2
, pp. 476-481
-
-
Mukerji, R.1
Parker, J.H.2
Merill, H.M.3
Friedman, R.E.4
-
9
-
-
84952974561
-
Comparison of methods for generator maintenance scheduling
-
San Francisco, 9–14 July
-
Patton, A.D. and Ali, J. (1972) “Comparison of methods for generator maintenance scheduling’, IEEE Paper C 72 452–1, Presented at the 1972 Power Engineering Society Summer Meeting, San Francisco, 9–14 July.
-
(1972)
IEEE Paper C 72 452–1, Presented at the 1972 Power Engineering Society Summer Meeting
-
-
Patton, A.D.1
Ali, J.2
-
10
-
-
84952972869
-
-
Power-line
-
Power-line (1997) ‘India’s first power magazine’, Vol. 1, No. 6, pp.36–37.
-
(1997)
India’s first power magazine
, vol.1
, Issue.6
, pp. 36-37
-
-
-
13
-
-
0026153980
-
Maintenance scheduling using simulated annealing method
-
Satoh, T. and Nara, K. (1991) ‘Maintenance scheduling using simulated annealing method’, IEEE Transactions on Power Systems, Vol. 6., No. 5, pp.850–857.
-
(1991)
IEEE Transactions on Power Systems
, vol.6
, Issue.5
, pp. 850-857
-
-
Satoh, T.1
Nara, K.2
-
15
-
-
0017493313
-
Several objective criteria for optimal generator preventive maintenance scheduling
-
PAS-96
-
Zurn, H.H. and Quintana, V.H. (1977) ‘Several objective criteria for optimal generator preventive maintenance scheduling’, IEEE transactions on Power Apparatus and Systems, PAS-96, May/June, pp.984–992.
-
(1977)
IEEE transactions on Power Apparatus and Systems
, vol.May/June
, pp. 984-992
-
-
Zurn, H.H.1
Quintana, V.H.2
|