메뉴 건너뛰기




Volumn 2, Issue 3, 2008, Pages 279-297

A novel differential evolution algorithm for no-idle permutation flow-shop scheduling problems

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; EVOLUTIONARY ALGORITHMS; HEURISTIC METHODS; PARTICLE SWARM OPTIMIZATION (PSO); SCHEDULING;

EID: 41749107959     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2008.017687     Document Type: Article
Times cited : (63)

References (36)
  • 1
    • 0000078316 scopus 로고
    • Flow- shop/no-idle or no-wait scheduling to minimize the sum of completion times
    • Adiri, I. and Pohoryles, D. (1982) 'Flow- shop/no-idle or no-wait scheduling to minimize the sum of completion times', Naval Research Quarterly, Vol. 29, pp.495-504.
    • (1982) Naval Research Quarterly , vol.29 , pp. 495-504
    • Adiri, I.1    Pohoryles, D.2
  • 3
    • 34548509933 scopus 로고    scopus 로고
    • A note on a greedy heuristic for the flow-shop makespan minimization with no machine idle-time
    • doi: 10.1016/j.ejor.2006.11.025
    • Baraz, D. and Mosheiov, G. (2007) 'A note on a greedy heuristic for the flow-shop makespan minimization with no machine idle-time', Eur J Oper Res, doi: 10.1016/j.ejor.2006.11.025.
    • (2007) Eur J Oper Res
    • Baraz, D.1    Mosheiov, G.2
  • 4
    • 84969446242 scopus 로고    scopus 로고
    • Metaheuristics for solving Economic Lot Scheduling Problems (ELSP) using time-varying lot-sizes approach
    • Chandrasekaran, C., Rajendran, C., Chetty, K.O.V., et al. (2007) 'Metaheuristics for solving Economic Lot Scheduling Problems (ELSP) using time-varying lot-sizes approach', European Journal of Industrial Engineering, Vol. 1, pp. 158-181.
    • (2007) European Journal of Industrial Engineering , vol.1 , pp. 158-181
    • Chandrasekaran, C.1    Rajendran, C.2    Chetty, K.O.V.3
  • 5
    • 12944258908 scopus 로고    scopus 로고
    • Design of digital PID controllers for continuous-time plants with integral performance criteria
    • Chang, F.P. and Hwang, C. (2004) 'Design of digital PID controllers for continuous-time plants with integral performance criteria', J Chin Inst Chem Eng, Vol. 35, pp.683-696.
    • (2004) J Chin Inst Chem Eng , vol.35 , pp. 683-696
    • Chang, F.P.1    Hwang, C.2
  • 7
    • 0034229139 scopus 로고    scopus 로고
    • Recent development in evolutionary computation for manufacturing optimization: Problems, solutions, and comparisons
    • Dimopoulos, C. and Zalazala, A.M.S. (2000) 'Recent development in evolutionary computation for manufacturing optimization: Problems, solutions, and comparisons', IEEE Trans Evolut Comput, Vol. 4, pp.93-113.
    • (2000) IEEE Trans Evolut Comput , vol.4 , pp. 93-113
    • Dimopoulos, C.1    Zalazala, A.M.S.2
  • 8
    • 10644272560 scopus 로고    scopus 로고
    • Some local search algorithms for no-wait flow-shop problem with makespan criterion
    • Grabowski, J. and Pempera, J. (2005) 'Some local search algorithms for no-wait flow-shop problem with makespan criterion', Comput Oper Res Vol. 32, pp.2197-2212.
    • (2005) Comput Oper Res , vol.32 , pp. 2197-2212
    • Grabowski, J.1    Pempera, J.2
  • 9
    • 84969447092 scopus 로고    scopus 로고
    • Climbing depth-bounded discrepancy search for solving hybrid flow shop problems
    • Hmida, A.B., Huguet, M.J., Lopez, P., et al. (2007) 'Climbing depth-bounded discrepancy search for solving hybrid flow shop problems', European Journal of Industrial Engineering, Vol. 1, pp.223-243.
    • (2007) European Journal of Industrial Engineering , vol.1 , pp. 223-243
    • Hmida, A.B.1    Huguet, M.J.2    Lopez, P.3
  • 10
    • 0037312458 scopus 로고    scopus 로고
    • Differential evolution training algorithm for feed-forward neural networks
    • Ilonen, J., Kamarainen, J.K. and Lampinen, J. (2003) 'Differential evolution training algorithm for feed-forward neural networks', Neural Process Lett, Vol. 17, pp.93-105.
    • (2003) Neural Process Lett , vol.17 , pp. 93-105
    • Ilonen, J.1    Kamarainen, J.K.2    Lampinen, J.3
  • 11
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson, S.M. (1954) 'Optimal two- and three-stage production schedules with setup times included', Naval Research Logistics Quarterly, Vol. 1, pp.61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 12
    • 23144465801 scopus 로고    scopus 로고
    • A heuristic for minimizing the makespan in no-idle permutation flow shop
    • Kalczynski, P.J. and Kamburowski, J. (2005) 'A heuristic for minimizing the makespan in no-idle permutation flow shop', Computers & Industrial Engineering, Vol. 49, pp. 146-154.
    • (2005) Computers & Industrial Engineering , vol.49 , pp. 146-154
    • Kalczynski, P.J.1    Kamburowski, J.2
  • 13
    • 33751114446 scopus 로고    scopus 로고
    • On no-wait and no-idle flow shops with makespan criterion
    • Kalczynski, P.J. and Kamburowski, J. (2007) 'On no-wait and no-idle flow shops with makespan criterion', Eur J Oper Res, Vol. 178, pp.677-685.
    • (2007) Eur J Oper Res , vol.178 , pp. 677-685
    • Kalczynski, P.J.1    Kamburowski, J.2
  • 14
    • 2342622157 scopus 로고    scopus 로고
    • More on three-machine no-idle flow shops
    • Kamburowski, J. (2004) 'More on three-machine no-idle flow shops', Computers & Industrial Engineering, Vol. 46, pp.461-466.
    • (2004) Computers & Industrial Engineering , vol.46 , pp. 461-466
    • Kamburowski, J.1
  • 15
    • 34249018250 scopus 로고    scopus 로고
    • A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling
    • Li, B.B. and Wang, L. (2007) 'A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling', IEEE Trans Syst, Man and Cybern, B, Cybern, Vol. 37, pp.576-591.
    • (2007) IEEE Trans Syst, Man and Cybern, B, Cybern , vol.37 , pp. 576-591
    • Li, B.B.1    Wang, L.2
  • 16
    • 33846194668 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    • Liu, B., Wang, L. and Jin, Y.H. (2007) 'An effective hybrid particle swarm optimization for no-wait flow shop scheduling', Int J Ada Manuf Technol, Vol. 31, pp.1001-1011.
    • (2007) Int J Ada Manuf Technol , vol.31 , pp. 1001-1011
    • Liu, B.1    Wang, L.2    Jin, Y.H.3
  • 17
    • 27844543515 scopus 로고    scopus 로고
    • Flowshop/No-idle scheduling to minimize total elapse time
    • Narain, L. and Bagga, P.C. (2005) 'Flowshop/No-idle scheduling to minimize total elapse time', Journal of Global Optimization, Vol. 33, pp.349-367.
    • (2005) Journal of Global Optimization , vol.33 , pp. 349-367
    • Narain, L.1    Bagga, P.C.2
  • 18
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow shop sequencing problem
    • Nawaz, M., Enscore, E.E.J. and Ham, I. (1983) 'A heuristic algorithm for the m-machine, n-job flow shop sequencing problem', OMEGA, Vol. 11, pp.91-95.
    • (1983) OMEGA , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore, E.E.J.2    Ham, I.3
  • 19
    • 28244447023 scopus 로고    scopus 로고
    • Scheduling flow shops using differential evolution algorithm
    • Onwubolu, G.C. and Davendra, D. (2006) 'Scheduling flow shops using differential evolution algorithm', Eur J Oper Res, Vol. 171, No. 2, pp.674-692.
    • (2006) Eur J Oper Res , vol.171 , Issue.2 , pp. 674-692
    • Onwubolu, G.C.1    Davendra, D.2
  • 20
    • 38249025037 scopus 로고
    • Simulated annealing for permutation flow shop scheduling
    • Osman, I. and Potts, C. (1989) 'Simulated annealing for permutation flow shop scheduling', OMEGA, Vol. 17, pp.551-557.
    • (1989) OMEGA , vol.17 , pp. 551-557
    • Osman, I.1    Potts, C.2
  • 21
    • 33751382312 scopus 로고    scopus 로고
    • Minimizing total earliness and tardiness penalties with a common due date on a single-machine using a discrete particle swarm optimization algorithm
    • Pan,Q.K., Tasgetiren, M.F. and Liang, Y.C. (2006) 'Minimizing total earliness and tardiness penalties with a common due date on a single-machine using a discrete particle swarm optimization algorithm', LNCS, Vol. 4150, pp.460-467.
    • (2006) LNCS , vol.4150 , pp. 460-467
    • Pan, Q.K.1    Tasgetiren, M.F.2    Liang, Y.C.3
  • 22
    • 38849205466 scopus 로고    scopus 로고
    • A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
    • doi:10.1016/j.cor.2006.12.030
    • Pan, Q.K., Tasgetiren, M.F. and Liang, Y.C. (2007) 'A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem', Comput Oper Res, doi:10.1016/j.cor.2006.12.030.
    • (2007) Comput Oper Res
    • Pan, Q.K.1    Tasgetiren, M.F.2    Liang, Y.C.3
  • 23
    • 49649084890 scopus 로고    scopus 로고
    • A hybrid differential evolution for permutation flow-shop scheduling
    • doi: 10.1007/s00170-007-1115-8
    • Qian, B., Wang, L., Hu, R., et al. (2007) 'A hybrid differential evolution for permutation flow-shop scheduling', Int J Ada Manuf Technol, doi: 10.1007/s00170-007-1115-8.
    • (2007) Int J Ada Manuf Technol
    • Qian, B.1    Wang, L.2    Hu, R.3
  • 24
    • 33750841084 scopus 로고    scopus 로고
    • A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
    • Ruiz, R. and Stutzle, T. (2007) 'A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem', Eur J Oper Res, Vol. 177, pp.2033-2049.
    • (2007) Eur J Oper Res , vol.177 , pp. 2033-2049
    • Ruiz, R.1    Stutzle, T.2
  • 25
    • 17544395777 scopus 로고    scopus 로고
    • Differential evolution in the earthquake hypocenter location
    • Ruzek, B. and Kvasnicka, M. (2001) 'Differential evolution in the earthquake hypocenter location', Pure and Applied Geophysics, Vol. 158, pp.667-693.
    • (2001) Pure and Applied Geophysics , vol.158 , pp. 667-693
    • Ruzek, B.1    Kvasnicka, M.2
  • 26
    • 5144228666 scopus 로고    scopus 로고
    • The simple F2//Cmax with forbidden tasks in first or last position: A problem more complex than it seems
    • Saadani, H., Baptisete, P. and Moalla, M. (2005a) 'The simple F2//Cmax with forbidden tasks in first or last position: A problem more complex than it seems', Eur J Oper Res, Vol. 161, pp.21-31.
    • (2005) Eur J Oper Res , vol.161 , pp. 21-31
    • Saadani, H.1    Baptisete, P.2    Moalla, M.3
  • 29
    • 5144226946 scopus 로고    scopus 로고
    • A traveling salesman approach to solve the F/no-idle/Cmax problem
    • Saadani, H., Guinet, A. and Moalla, M. (2005b) 'A traveling salesman approach to solve the F/no-idle/Cmax problem', Eur J Oper Res, Vol. 161, pp. 11-20.
    • (2005) Eur J Oper Res , vol.161 , pp. 11-20
    • Saadani, H.1    Guinet, A.2    Moalla, M.3
  • 30
    • 12344289479 scopus 로고    scopus 로고
    • Designing digital filters with differential evolution
    • D. Corne, M. Dorigo and F. Glover Eds, London, UK: McGraw-Hill, pp
    • Storn, R. (1999) 'Designing digital filters with differential evolution', in D. Corne, M. Dorigo and F. Glover (Eds.) New Ideas in Optimization, London, UK: McGraw-Hill, pp. 109-125.
    • (1999) New Ideas in Optimization , pp. 109-125
    • Storn, R.1
  • 31
    • 0142000477 scopus 로고    scopus 로고
    • Differential evolution - a simple and efficient adaptive scheme for global optimization over continuous spaces
    • Storn, R. and Price, K. (1997) 'Differential evolution - a simple and efficient adaptive scheme for global optimization over continuous spaces', Journal of Global Optimization, Vol. 11, pp.341-359.
    • (1997) Journal of Global Optimization , vol.11 , pp. 341-359
    • Storn, R.1    Price, K.2
  • 32
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problems
    • Taillard, E. (1990) 'Some efficient heuristic methods for the flow shop sequencing problems', Eur J Oper Res, Vol. 47, pp.65-74.
    • (1990) Eur J Oper Res , vol.47 , pp. 65-74
    • Taillard, E.1
  • 33
    • 0027201278 scopus 로고
    • Benchmarks for basic scheduling problems
    • Taillard, E. (1993) 'Benchmarks for basic scheduling problems', Eur J Oper Res, Vol. 64, pp.278-285.
    • (1993) Eur J Oper Res , vol.64 , pp. 278-285
    • Taillard, E.1
  • 35
    • 41749086788 scopus 로고    scopus 로고
    • A particle swarm optimization and differential algorithm for job shop scheduling problem
    • Tasgetiren, M.F., Sevkli, M., Liang, Y.C., et al. (2006) 'A particle swarm optimization and differential algorithm for job shop scheduling problem', International Journal of Operations Research, Vol. 3, pp.120-135.
    • (2006) International Journal of Operations Research , vol.3 , pp. 120-135
    • Tasgetiren, M.F.1    Sevkli, M.2    Liang, Y.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.