|
Volumn 184, Issue 2, 2008, Pages 810-813
|
Erratum to "A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time" [European Journal of Operational Research, 184 (2) (2008), 810-813] (DOI:10.1016/j.ejor.2006.11.025);A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time
|
Author keywords
Flowshop; Heuristics; Makespan; Scheduling
|
Indexed keywords
NUMERICAL METHODS;
OPERATIONS RESEARCH;
OPTIMIZATION;
SCHEDULING;
FLOWSHOPS;
MAKESPAN;
HEURISTIC ALGORITHMS;
|
EID: 34548509933
PISSN: 03772217
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ejor.2008.07.010 Document Type: Erratum |
Times cited : (49)
|
References (3)
|