메뉴 건너뛰기




Volumn 24, Issue 2, 2008, Pages 379-391

Load balancing among photolithography machines in the semiconductor manufacturing system

Author keywords

Dedicated photolithography machine constraint; Load balancing; Photolithography; Resource schedule and execution matrix; Semiconductor manufacturing

Indexed keywords

COMPUTER SIMULATION; CONSTRAINT THEORY; PHOTOLITHOGRAPHY; RESOURCE ALLOCATION; SEMICONDUCTOR DEVICE MODELS;

EID: 41549128007     PISSN: 10162364     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (14)
  • 2
    • 0000231669 scopus 로고
    • Scheduling manufacturing systems of re-entrant lines
    • D. D. Yao ed, Springer-Verlag, New York
    • P. R. Kumar, "Scheduling manufacturing systems of re-entrant lines," Stochastic Modeling and Analysis of Manufacturing Systems, in D. D. Yao ed., Springer-Verlag, New York, 1994, pp. 325-360.
    • (1994) Stochastic Modeling and Analysis of Manufacturing Systems , pp. 325-360
    • Kumar, P.R.1
  • 3
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing Plants
    • S. C. H. Lu, D. Ramaswamy, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing Plants," IEEE Transactions on Semiconductor Manufacturing, Vol. 7, 1994, pp. 374-385.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , pp. 374-385
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 5
    • 0035248367 scopus 로고    scopus 로고
    • Cycle-time improvements for photolithography process in semiconductor manufacturing
    • E. Akcalt, K. Nemoto, and R. Uzsoy, "Cycle-time improvements for photolithography process in semiconductor manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 14, 2001, pp. 48-56.
    • (2001) IEEE Transactions on Semiconductor Manufacturing , vol.14 , pp. 48-56
    • Akcalt, E.1    Nemoto, K.2    Uzsoy, R.3
  • 7
    • 17744381413 scopus 로고    scopus 로고
    • Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
    • A. Arisha and P. Young, "Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility," in Proceedings of the 36th Conference on Winter Simulation, 2004, pp. 1935-1942.
    • (2004) Proceedings of the 36th Conference on Winter Simulation , pp. 1935-1942
    • Arisha, A.1    Young, P.2
  • 8
    • 0035707020 scopus 로고    scopus 로고
    • Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility
    • L. Mönch, M. Prause, and V. Schmalfuss, "Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility," in Proceedings of the 33rd Conference on Winter Simulation, 2001, pp. 1170-1177.
    • (2001) Proceedings of the 33rd Conference on Winter Simulation , pp. 1170-1177
    • Mönch, L.1    Prause, M.2    Schmalfuss, V.3
  • 9
    • 0035485518 scopus 로고    scopus 로고
    • Queuing network models in the design and analysis of semiconductor wafer fabs
    • S. Kumar and P. R. Kumar, "Queuing network models in the design and analysis of semiconductor wafer fabs," IEEE Transactions on Robotics and Automation, Vol. 17, 2001, pp. 548-561.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , pp. 548-561
    • Kumar, S.1    Kumar, P.R.2
  • 10
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • S. H. Lu and P. R. Kumar, "Distributed scheduling based on due dates and buffer priorities," IEEE Transactions on Automatic Control, 1991, pp. 1406-1416.
    • (1991) IEEE Transactions on Automatic Control , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2
  • 12
    • 33746191243 scopus 로고    scopus 로고
    • A heuristic load balancing scheduling method for dedicated machine constraint
    • Proceedings of the 19th International Conference on Industrial, Engineering & Other Applications of Applied Intelligent Systems, Springer-Verlag, Berlin Heidelberg
    • A. M. D. Shr, A. Liu, and P. P. Chen, "A heuristic load balancing scheduling method for dedicated machine constraint," in Proceedings of the 19th International Conference on Industrial, Engineering & Other Applications of Applied Intelligent Systems, LNAI 4031, Springer-Verlag, Berlin Heidelberg, 2006, pp. 750-759.
    • (2006) LNAI , vol.4031 , pp. 750-759
    • Shr, A.M.D.1    Liu, A.2    Chen, P.P.3
  • 14
    • 41549154860 scopus 로고    scopus 로고
    • NetBeans IDE, http://www.netbeans.org/.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.