-
1
-
-
21144477219
-
Re-entrant lines
-
P. R. Kumar, "Re-entrant lines," Queuing Systems: Theory and Applications, Special Issue on Queuing Networks, Vol. 13, 1993, pp. 87-110.
-
(1993)
Queuing Systems: Theory and Applications, Special Issue on Queuing Networks
, vol.13
, pp. 87-110
-
-
Kumar, P.R.1
-
2
-
-
0000231669
-
Scheduling manufacturing systems of re-entrant lines
-
D. D. Yao ed, Springer-Verlag, New York
-
P. R. Kumar, "Scheduling manufacturing systems of re-entrant lines," Stochastic Modeling and Analysis of Manufacturing Systems, in D. D. Yao ed., Springer-Verlag, New York, 1994, pp. 325-360.
-
(1994)
Stochastic Modeling and Analysis of Manufacturing Systems
, pp. 325-360
-
-
Kumar, P.R.1
-
3
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing Plants
-
S. C. H. Lu, D. Ramaswamy, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing Plants," IEEE Transactions on Semiconductor Manufacturing, Vol. 7, 1994, pp. 374-385.
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, pp. 374-385
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
5
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
E. Akcalt, K. Nemoto, and R. Uzsoy, "Cycle-time improvements for photolithography process in semiconductor manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 14, 2001, pp. 48-56.
-
(2001)
IEEE Transactions on Semiconductor Manufacturing
, vol.14
, pp. 48-56
-
-
Akcalt, E.1
Nemoto, K.2
Uzsoy, R.3
-
6
-
-
28644441612
-
Automated stepper load balance allocation system
-
T. Miwa, N. Nishihara, and K. Yamamoto, "Automated stepper load balance allocation system," IEEE Transactions on Semiconductor Manufacturing, Vol. 18, 2005, pp. 510-516.
-
(2005)
IEEE Transactions on Semiconductor Manufacturing
, vol.18
, pp. 510-516
-
-
Miwa, T.1
Nishihara, N.2
Yamamoto, K.3
-
7
-
-
17744381413
-
Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
-
A. Arisha and P. Young, "Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility," in Proceedings of the 36th Conference on Winter Simulation, 2004, pp. 1935-1942.
-
(2004)
Proceedings of the 36th Conference on Winter Simulation
, pp. 1935-1942
-
-
Arisha, A.1
Young, P.2
-
8
-
-
0035707020
-
Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility
-
L. Mönch, M. Prause, and V. Schmalfuss, "Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility," in Proceedings of the 33rd Conference on Winter Simulation, 2001, pp. 1170-1177.
-
(2001)
Proceedings of the 33rd Conference on Winter Simulation
, pp. 1170-1177
-
-
Mönch, L.1
Prause, M.2
Schmalfuss, V.3
-
9
-
-
0035485518
-
Queuing network models in the design and analysis of semiconductor wafer fabs
-
S. Kumar and P. R. Kumar, "Queuing network models in the design and analysis of semiconductor wafer fabs," IEEE Transactions on Robotics and Automation, Vol. 17, 2001, pp. 548-561.
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, pp. 548-561
-
-
Kumar, S.1
Kumar, P.R.2
-
10
-
-
0026369803
-
Distributed scheduling based on due dates and buffer priorities
-
S. H. Lu and P. R. Kumar, "Distributed scheduling based on due dates and buffer priorities," IEEE Transactions on Automatic Control, 1991, pp. 1406-1416.
-
(1991)
IEEE Transactions on Automatic Control
, pp. 1406-1416
-
-
Lu, S.H.1
Kumar, P.R.2
-
11
-
-
33847749994
-
A load balancing scheduling approach for dedicated machine constraint
-
A. M. D. Shr, A. Liu, and P. P. Chen, "A load balancing scheduling approach for dedicated machine constraint," in Proceedings of the 8th International Conference on Enterprise Information System, Vol. 2, 2006, pp. 170-175.
-
(2006)
Proceedings of the 8th International Conference on Enterprise Information System
, vol.2
, pp. 170-175
-
-
Shr, A.M.D.1
Liu, A.2
Chen, P.P.3
-
12
-
-
33746191243
-
A heuristic load balancing scheduling method for dedicated machine constraint
-
Proceedings of the 19th International Conference on Industrial, Engineering & Other Applications of Applied Intelligent Systems, Springer-Verlag, Berlin Heidelberg
-
A. M. D. Shr, A. Liu, and P. P. Chen, "A heuristic load balancing scheduling method for dedicated machine constraint," in Proceedings of the 19th International Conference on Industrial, Engineering & Other Applications of Applied Intelligent Systems, LNAI 4031, Springer-Verlag, Berlin Heidelberg, 2006, pp. 750-759.
-
(2006)
LNAI
, vol.4031
, pp. 750-759
-
-
Shr, A.M.D.1
Liu, A.2
Chen, P.P.3
-
13
-
-
33947102082
-
A load balancing method for dedicated photolithography machine constraint
-
A. M. D. Shr, A. Liu, and P. P. Chen, "A load balancing method for dedicated photolithography machine constraint," in Proceedings of IFIP International Federation for Information Processing, Information Technology for Balanced Automation Systems, Vol. 220, 2006, pp. 339-348.
-
(2006)
Proceedings of IFIP International Federation for Information Processing, Information Technology for Balanced Automation Systems
, vol.220
, pp. 339-348
-
-
Shr, A.M.D.1
Liu, A.2
Chen, P.P.3
-
14
-
-
41549154860
-
-
NetBeans IDE, http://www.netbeans.org/.
-
-
-
|