메뉴 건너뛰기




Volumn 19, Issue 4, 2008, Pages 381-398

Applying Six-Sigma methodology in constructing the quick response of a case reporting system

Author keywords

Cause and countermeasure diagram; Cause and effect diagram; Process capability index; Quick response system; Radio chart; Six Sigma

Indexed keywords


EID: 41549099611     PISSN: 14783363     EISSN: 14783371     Source Type: Journal    
DOI: 10.1080/14783360600753836     Document Type: Article
Times cited : (9)

References (16)
  • 3
    • 0030086718 scopus 로고    scopus 로고
    • Multivariate process analysis with lattice data
    • Boyles, R.A. (1996). Multivariate process analysis with lattice data. Technometrics, 38(1), 37-49.
    • (1996) Technometrics , vol.38 , Issue.1 , pp. 37-49
    • Boyles, R.A.1
  • 4
    • 84986117279 scopus 로고    scopus 로고
    • The integrated evaluation model for administration quality based on service time
    • Chen, J.P., Chen, C.K., & Chen, K.S. (2001). The integrated evaluation model for administration quality based on service time. Managing Service Quality, 11(5), 342-349.
    • (2001) Managing Service Quality , vol.11 , Issue.5 , pp. 342-349
    • Chen, J.P.1    Chen, C.K.2    Chen, K.S.3
  • 5
    • 0036408825 scopus 로고    scopus 로고
    • Performance assessment of processing and delivery times for very large scale integration using process capability indices
    • Chen, K.S., Chen, H.T., & Tong, L.I. (2002a). Performance assessment of processing and delivery times for very large scale integration using process capability indices. International Journal of Advance Manufacturing Tecltnology, 20, 526-531.
    • (2002) International Journal of Advance Manufacturing Tecltnology , vol.20 , pp. 526-531
    • Chen, K.S.1    Chen, H.T.2    Tong, L.I.3
  • 8
    • 0036396213 scopus 로고    scopus 로고
    • Intelligent integrated plant operation system for Six Sigma
    • Ham, C. & Lee, Y.-H. (2002). Intelligent integrated plant operation system for Six Sigma. Annual Reviews in Control, 26, 27-43.
    • (2002) Annual Reviews in Control , vol.26 , pp. 27-43
    • Ham, C.1    Lee, Y.-H.2
  • 9
    • 2442464909 scopus 로고    scopus 로고
    • An algorithm, of performance evaluation for mould development
    • Huang, J.M., & Chen, K.S. (2004). An algorithm, of performance evaluation for mould development. Production Planning and Control, /5(1), 55-62.
    • (2004) Production Planning and Control, /5 , pp. 55-62
    • Huang, J.M.1    Chen, K.S.2
  • 11
    • 41549161787 scopus 로고    scopus 로고
    • Using the signal-to-noise ratio to evaluate the teller performance in the banking system
    • Liang, S.K., Hung, Y.H., & Chen, K.S. (2001). Using the signal-to-noise ratio to evaluate the teller performance in the banking system. Advance and Applications in Statistics, 1(2), 133-148.
    • (2001) Advance and Applications in Statistics , vol.1 , Issue.2 , pp. 133-148
    • Liang, S.K.1    Hung, Y.H.2    Chen, K.S.3
  • 15
    • 0000595789 scopus 로고    scopus 로고
    • One-Sided capability indices Cpu and CpI: Decision making with sample information
    • Pearn, W.L., & Chen, K.S. (2002). One-Sided capability indices Cpu and CpI: decision making with sample information. International Journal of Quality & Reliability Management, 19(3), 221-245.
    • (2002) International Journal of Quality & Reliability Management , vol.19 , Issue.3 , pp. 221-245
    • Pearn, W.L.1    Chen, K.S.2
  • 16
    • 0037399642 scopus 로고    scopus 로고
    • Die casting process optimization using Taguchi method
    • Syrcos, G.P. (2003). Die casting process optimization using Taguchi method. Journal of Materials Processing Technology, 135, 68-74.
    • (2003) Journal of Materials Processing Technology , vol.135 , pp. 68-74
    • Syrcos, G.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.