메뉴 건너뛰기




Volumn , Issue , 2007, Pages 1163-1170

A study of the EPQ model using Fuzzy AHP when flaw of the products or unreliable machineries exists

Author keywords

Economic production quantity (EPQ) model; Fuzzy analysis hierarchy procedure (fuzzy AHP)

Indexed keywords

ECONOMIC ANALYSIS; FUZZY CLUSTERING; HIERARCHICAL SYSTEMS; INDUSTRIAL RESEARCH; MATHEMATICAL MODELS; PROBLEM SOLVING;

EID: 40649115475     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IEEM.2007.4419375     Document Type: Conference Paper
Times cited : (3)

References (15)
  • 1
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J., and Gershwin, S. B. 1983. An algorithm for the computer control of a flexible manufacturing system. IIE Transactions 15, 353-362.
    • (1983) IIE Transactions , vol.15 , pp. 353-362
    • Kimemia, J.1    Gershwin, S.B.2
  • 2
    • 0023978351 scopus 로고
    • Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines
    • Maimon, O. Z., and Gershwin, S. B. 1988. Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research 36, 279-292.
    • (1988) Operations Research , vol.36 , pp. 279-292
    • Maimon, O.Z.1    Gershwin, S.B.2
  • 3
    • 0022667867 scopus 로고
    • Optimal control of production rate in a failure prone manufacturing system
    • Akella, R., and Kumar, P. R. 1986. Optimal control of production rate in a failure prone manufacturing system. IEEE Transactions on Automatic Control 31, 116-126.
    • (1986) IEEE Transactions on Automatic Control , vol.31 , pp. 116-126
    • Akella, R.1    Kumar, P.R.2
  • 4
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bieleckl, T., and Kumar, P. R. 1988. Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research 36, 532-541.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bieleckl, T.1    Kumar, P.R.2
  • 5
    • 0024048635 scopus 로고
    • Production control of a manufacturing system with multiple machine states
    • Sharifhia, A. 1988. Production control of a manufacturing system with multiple machine states. IEEE Transactions on Automatic Control 33, 620-625.
    • (1988) IEEE Transactions on Automatic Control , vol.33 , pp. 620-625
    • Sharifhia, A.1
  • 6
    • 0030648767 scopus 로고    scopus 로고
    • Production control of an unreliable manufacturing system under the assumption of no backlog
    • Liu, B., and Cao, J. 1997. Production control of an unreliable manufacturing system under the assumption of no backlog. Mathematical Methods of Operations Research 46, 103-117.
    • (1997) Mathematical Methods of Operations Research , vol.46 , pp. 103-117
    • Liu, B.1    Cao, J.2
  • 7
    • 0001012373 scopus 로고
    • Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework
    • Lee, H. L. 1992. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science 38, 1314-1328.
    • (1992) Management Science , vol.38 , pp. 1314-1328
    • Lee, H.L.1
  • 8
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu, J. J., and Yang, P. 1996. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 91, 517-527.
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 9
    • 0023979032 scopus 로고    scopus 로고
    • Lee, H. L., and Yano, C. A, 1988. Production control in multistage systems with variable yield losses. Operations Research 36, 269-278.
    • Lee, H. L., and Yano, C. A, 1988. Production control in multistage systems with variable yield losses. Operations Research 36, 269-278.
  • 11
    • 0032096710 scopus 로고    scopus 로고
    • Note: The economic manufacturing lot-sizing problem with imperfect production processes: bounds and optimal solutions
    • Hariga, M., and Ben-Daya, M. 1998. Note: the economic manufacturing lot-sizing problem with imperfect production processes: bounds and optimal solutions. Naval Research Logistics 45, 423-433.
    • (1998) Naval Research Logistics , vol.45 , pp. 423-433
    • Hariga, M.1    Ben-Daya, M.2
  • 12
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt, M. J., and Lee, H. L. 1986. Economic production cycles with imperfect production processes. IIE Transactions 18, 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 13
    • 0020843523 scopus 로고    scopus 로고
    • Laarhove n, P.J.M. van and Perdrycz, W. (1983), A Fuzzy Extension of Saaty's Priority Theory, Fuzzy Sets and Systems, 11, 229-241.
    • Laarhove n, P.J.M. van and Perdrycz, W. (1983), "A Fuzzy Extension of Saaty's Priority Theory", Fuzzy Sets and Systems, Vol. 11, 229-241.
  • 14
    • 40649090626 scopus 로고    scopus 로고
    • The economic quantity model of unreliable manufacturing system - considering defective products and rework process
    • master thesis, graduate institute of industrial management at National Cheng Kung University
    • Chia-Chang Cheng, 2002, "The economic quantity model of unreliable manufacturing system - considering defective products and rework process", master thesis, graduate institute of industrial management at National Cheng Kung University.
    • (2002)
    • Cheng, C.-C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.