-
1
-
-
0042778528
-
Introduction to fault tree analysis
-
R.E. Barlow, J. Fussel, & N. Singpurwalla. Philadelphia: Society for Industrial and Applied Mathematics
-
Barlow R.E., Lambert H.E. Introduction to fault tree analysis. Barlow R.E., Fussel J., Singpurwalla N. Reliability and Fault Tree Analysis. 1975;Society for Industrial and Applied Mathematics, Philadelphia.
-
(1975)
Reliability and Fault Tree Analysis
-
-
Barlow, R.E.1
Lambert, H.E.2
-
3
-
-
0012943749
-
Computer aided fault tree construction
-
R.E. Barlow, J. Fussel, & N. Singpurwalla. Philadelphia: Society for Industrial and Applied Mathematics
-
Fussell J.B. Computer aided fault tree construction. Barlow R.E., Fussel J., Singpurwalla N. Reliability and Fault Tree Analysis. 1975;Society for Industrial and Applied Mathematics, Philadelphia.
-
(1975)
Reliability and Fault Tree Analysis
-
-
Fussell, J.B.1
-
5
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource reallocation
-
Golenko-Ginzburg D., Gonik A. A heuristic for network project scheduling with random activity durations depending on the resource reallocation. International Journal of Production Economics. 55:1998;149-162.
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 149-162
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
7
-
-
4043051224
-
System reliability estimation via fault tree simulation
-
Golenko-Ginzburg D., Papic L. System reliability estimation via fault tree simulation. Communications in DQM. 1(1):1998;114-121.
-
(1998)
Communications in DQM
, vol.1
, Issue.1
, pp. 114-121
-
-
Golenko-Ginzburg, D.1
Papic, L.2
-
9
-
-
0034197692
-
An annotated overview of system - Reliability optimization
-
Kuo W., Prasad V.P. An annotated overview of system - Reliability optimization. IEEE Transactions on Reliability. R-49:2000;176-187.
-
(2000)
IEEE Transactions on Reliability
, vol.R-49
, pp. 176-187
-
-
Kuo, W.1
Prasad, V.P.2
-
10
-
-
0026882492
-
A decomposition method for optimization of large system reliability
-
Li D., Haimes Y.Y. A decomposition method for optimization of large system reliability. IEEE Transactions on Reliability. R-41:1992;183-188.
-
(1992)
IEEE Transactions on Reliability
, vol.R-41
, pp. 183-188
-
-
Li, D.1
Haimes, Y.Y.2
-
12
-
-
0019583039
-
Optimal reliability-design of a series - Parallel system by a large-scale multiobjective optimization method
-
Sakawa M. Optimal reliability-design of a series - parallel system by a large-scale multiobjective optimization method. IEEE Transactions on Reliability. R-30:1981;173-174.
-
(1981)
IEEE Transactions on Reliability
, vol.R-30
, pp. 173-174
-
-
Sakawa, M.1
-
13
-
-
0022221713
-
Fault tree analysis using a binary decision tree
-
Schneeweiss W.G. Fault tree analysis using a binary decision tree. IEEE Transactions on Reliability. R-34(5):1985;453-457.
-
(1985)
IEEE Transactions on Reliability
, vol.R-34
, Issue.5
, pp. 453-457
-
-
Schneeweiss, W.G.1
-
16
-
-
4043092404
-
Using the fault tree analysis techniques
-
R.E. Barlow, J. Fussel, & N. Singpurwalla. Philadelphia: Society for Industrial and Applied Mathematics
-
Young J. Using the fault tree analysis techniques. Barlow R.E., Fussel J., Singpurwalla N. Reliability and Fault Tree Analysis. 1975;Society for Industrial and Applied Mathematics, Philadelphia.
-
(1975)
Reliability and Fault Tree Analysis
-
-
Young, J.1
|