메뉴 건너뛰기




Volumn 112, Issue 2, 2008, Pages 769-781

Random yield risk sharing in a two-level supply chain

Author keywords

Production lot size; Random yield; Risk sharing; Supply chain contracts

Indexed keywords

PRODUCTION; RISK MANAGEMENT; SUPPLY CHAIN MANAGEMENT; UNCERTAIN SYSTEMS;

EID: 39649112859     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.06.003     Document Type: Article
Times cited : (131)

References (19)
  • 3
    • 0032157893 scopus 로고    scopus 로고
    • Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size
    • Gerchak Y., and Grosfeld-Nir A. Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size. International Journal of Production Economics 56-57 (1998) 191-197
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 191-197
    • Gerchak, Y.1    Grosfeld-Nir, A.2
  • 4
    • 0024032613 scopus 로고
    • Periodic review production models with variable yield and uncertain demand
    • Gerchak Y., Vickson R.G., and Parlar M. Periodic review production models with variable yield and uncertain demand. IIE Transactions 20 2 (1988) 144-150
    • (1988) IIE Transactions , vol.20 , Issue.2 , pp. 144-150
    • Gerchak, Y.1    Vickson, R.G.2    Parlar, M.3
  • 5
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak Y., Wang Y., and Yano C.A. Lot sizing in assembly systems with random component yields. IIE Transaction 26 2 (1994) 19-24
    • (1994) IIE Transaction , vol.26 , Issue.2 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.A.3
  • 6
    • 0030144520 scopus 로고    scopus 로고
    • Co-production models with random functionality yields
    • Gerchak Y., Tripathy K., and Wang K. Co-production models with random functionality yields. IIE Transaction 28 (1996) 391-403
    • (1996) IIE Transaction , vol.28 , pp. 391-403
    • Gerchak, Y.1    Tripathy, K.2    Wang, K.3
  • 7
    • 0030218604 scopus 로고    scopus 로고
    • Production to order with random yields: Single-stage multiple lot-sizing
    • Grosfeld-Nir A., and Gerchak Y. Production to order with random yields: Single-stage multiple lot-sizing. IIE Transaction 28 (1996) 669-676
    • (1996) IIE Transaction , vol.28 , pp. 669-676
    • Grosfeld-Nir, A.1    Gerchak, Y.2
  • 8
    • 33750008370 scopus 로고    scopus 로고
    • Coordination in decentralized assembly systems with uncertain component yields
    • Gurnani H., and Gerchak Y. Coordination in decentralized assembly systems with uncertain component yields. European Journal of Operational Research 176 (2007) 1559-1576
    • (2007) European Journal of Operational Research , vol.176 , pp. 1559-1576
    • Gurnani, H.1    Gerchak, Y.2
  • 9
    • 3042545957 scopus 로고    scopus 로고
    • Supply management in assembly systems with random yield and random demand
    • Gurnani H., Akella R., and Lehoczky J. Supply management in assembly systems with random yield and random demand. IIE Transaction 32 (2000) 701-714
    • (2000) IIE Transaction , vol.32 , pp. 701-714
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 10
    • 0025456687 scopus 로고
    • The structure of periodic review policies in the presence of random yield
    • Henig M., and Gerchak Y. The structure of periodic review policies in the presence of random yield. Operations Research 38 4 (1990) 634-643
    • (1990) Operations Research , vol.38 , Issue.4 , pp. 634-643
    • Henig, M.1    Gerchak, Y.2
  • 13
    • 25144490642 scopus 로고    scopus 로고
    • Production planning under yield and demand uncertainty with yield-dependent cost and price
    • Kazaz B. Production planning under yield and demand uncertainty with yield-dependent cost and price. Manufacturing & Service Operations Management 6 3 (2004) 209-224
    • (2004) Manufacturing & Service Operations Management , vol.6 , Issue.3 , pp. 209-224
    • Kazaz, B.1
  • 16
    • 0005536597 scopus 로고
    • The optimal reject allowance problem
    • Levitan R.E. The optimal reject allowance problem. Management Science 6 5 (1960) 172-186
    • (1960) Management Science , vol.6 , Issue.5 , pp. 172-186
    • Levitan, R.E.1
  • 17
    • 0000455414 scopus 로고    scopus 로고
    • Periodic review production models with variable capacity, random yield, and uncertain demand
    • Wang Y., and Gerchak Y. Periodic review production models with variable capacity, random yield, and uncertain demand. Management Science 42 1 (1996) 130-137
    • (1996) Management Science , vol.42 , Issue.1 , pp. 130-137
    • Wang, Y.1    Gerchak, Y.2
  • 18
    • 0034675399 scopus 로고    scopus 로고
    • Input control in a batch production system with lead times, due dates and random yields
    • Wang Y., and Gerchak Y. Input control in a batch production system with lead times, due dates and random yields. European Journal of Operations Research 126 2 (2000) 371-385
    • (2000) European Journal of Operations Research , vol.126 , Issue.2 , pp. 371-385
    • Wang, Y.1    Gerchak, Y.2
  • 19
    • 0001198301 scopus 로고
    • Lot sizing with random yields: A review
    • Yano C.A., and Lee H. Lot sizing with random yields: A review. Operations Research 43 2 (1995) 311-334
    • (1995) Operations Research , vol.43 , Issue.2 , pp. 311-334
    • Yano, C.A.1    Lee, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.