-
1
-
-
0036778849
-
Optimal power flow using particle swarm optimisation
-
Abido, M.A., Optimal power flow using particle swarm optimisation. Elect. Power & Energy Syst., 2002, 24, 563-571.
-
(2002)
Elect. Power & Energy Syst
, vol.24
, pp. 563-571
-
-
Abido, M.A.1
-
2
-
-
23044471509
-
Field computation in non-linear magnetic media using particle swarm optimisation
-
Adly, A.A. and Abd-El-Hafiz, S.K., Field computation in non-linear magnetic media using particle swarm optimisation. J. Magnet. & Magnet. Mater., 2004, 272-276, 690-692.
-
(2004)
J. Magnet. & Magnet. Mater
, vol.272-276
, pp. 690-692
-
-
Adly, A.A.1
Abd-El-Hafiz, S.K.2
-
3
-
-
0037058296
-
Particle swarm optimisation for task assignment problem
-
Ayed, S., Imtiaz, A. and Sabah, A.M., Particle swarm optimisation for task assignment problem. Microproc. & Microsyst., 2002, 26, 363-371.
-
(2002)
Microproc. & Microsyst
, vol.26
, pp. 363-371
-
-
Ayed, S.1
Imtiaz, A.2
Sabah, A.M.3
-
4
-
-
2442568808
-
Study of simulated annealing based algorithms for multiobjective optimisation of a constrained problem
-
Balram, S., Study of simulated annealing based algorithms for multiobjective optimisation of a constrained problem. Comp. & Chem. Eng., 2004, 28, 1849-1871.
-
(2004)
Comp. & Chem. Eng
, vol.28
, pp. 1849-1871
-
-
Balram, S.1
-
5
-
-
0038789162
-
A flexible decision support system for steel hot rolling mill scheduling
-
Cowling, P., A flexible decision support system for steel hot rolling mill scheduling. Comp. & Indust. Eng., 2003, 45, 307-321.
-
(2003)
Comp. & Indust. Eng
, vol.45
, pp. 307-321
-
-
Cowling, P.1
-
7
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
Iiro, H. and Ignacio, E.G., A decomposition approach for the scheduling of a steel plant production. Comp. & Chem. Eng., 2001, 25, 1647-1660.
-
(2001)
Comp. & Chem. Eng
, vol.25
, pp. 1647-1660
-
-
Iiro, H.1
Ignacio, E.G.2
-
8
-
-
0024169130
-
Optimal inter-process steel production scheduling
-
Jacobs, T.L., Wright, J.R. and Cobbs, A.E., Optimal inter-process steel production scheduling. Comp. & Oper. Res., 1988, 15, 497-507.
-
(1988)
Comp. & Oper. Res
, vol.15
, pp. 497-507
-
-
Jacobs, T.L.1
Wright, J.R.2
Cobbs, A.E.3
-
9
-
-
0038743113
-
Berth scheduling by simulated annealing
-
Kim, K.H. and Moon, K.C., Berth scheduling by simulated annealing. Transport. Res. Part B, 2003, 37, 541-560.
-
(2003)
Transport. Res. Part B
, vol.37
, pp. 541-560
-
-
Kim, K.H.1
Moon, K.C.2
-
11
-
-
26444479778
-
Optimisation by simulated annealing
-
Kirkpatrick, S., Gelatt, C.D. and Vecchi, M.P., Optimisation by simulated annealing. Science, 1993, 220, 671-680.
-
(1993)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
12
-
-
0026880377
-
Discrete event sequencing as a traveling salesman problem
-
Kosiba, E.D., Wright, J.R. and Cobbs, A.E., Discrete event sequencing as a traveling salesman problem. Comp, in Indust., 1992, 19, 317-327.
-
(1992)
Comp, in Indust
, vol.19
, pp. 317-327
-
-
Kosiba, E.D.1
Wright, J.R.2
Cobbs, A.E.3
-
13
-
-
0026874435
-
The vehicle routing problem: An overview of exact and approximate algorithms
-
Laporte, G., The vehicle routing problem: An overview of exact and approximate algorithms. Euro. J. Oper. Res., 1992, 59, 345-358.
-
(1992)
Euro. J. Oper. Res
, vol.59
, pp. 345-358
-
-
Laporte, G.1
-
14
-
-
0032049311
-
The hot strip mill production scheduling problem: A tabu search approach
-
Leo, L., Michael, W.C. and Michel, G., The hot strip mill production scheduling problem: A tabu search approach. Euro. J. Oper. Res., 1998, 106, 317-335.
-
(1998)
Euro. J. Oper. Res
, vol.106
, pp. 317-335
-
-
Leo, L.1
Michael, W.C.2
Michel, G.3
-
15
-
-
33749566906
-
An ant colony algorithm for the capacitated vehicle routing
-
Mazzeo, S. and Loiseau, I., An ant colony algorithm for the capacitated vehicle routing. Electron. Notes in Discrete Math., 2004, 18, 181-186.
-
(2004)
Electron. Notes in Discrete Math
, vol.18
, pp. 181-186
-
-
Mazzeo, S.1
Loiseau, I.2
-
16
-
-
0016101682
-
A mixed integer programming model for scheduling order in steel mill
-
Redwine, C.N. and Wismer, D.A., A mixed integer programming model for scheduling order in steel mill. J. Optim. Theory & Applic., 1974, 14, 305-318.
-
(1974)
J. Optim. Theory & Applic
, vol.14
, pp. 305-318
-
-
Redwine, C.N.1
Wismer, D.A.2
-
17
-
-
0017558554
-
Development of integrated production scheduling system for iron and steel works
-
Sato, S., Yamaoka, T., Aoki, Y. and Ueda, T., Development of integrated production scheduling system for iron and steel works. Int. J. Prod. Res., 1977, 15, 539-552.
-
(1977)
Int. J. Prod. Res
, vol.15
, pp. 539-552
-
-
Sato, S.1
Yamaoka, T.2
Aoki, Y.3
Ueda, T.4
-
19
-
-
0037291006
-
A hybrid particle swarm optimisation for distribution state estimation
-
Shigenori, N., Takamu, G.J., Toshiki, Y. and Yoshikazu, F., A hybrid particle swarm optimisation for distribution state estimation. IEEE Trans. on Power Syst., 2003, 18, 60-68.
-
(2003)
IEEE Trans. on Power Syst
, vol.18
, pp. 60-68
-
-
Shigenori, N.1
Takamu, G.J.2
Toshiki, Y.3
Yoshikazu, F.4
-
20
-
-
4043079775
-
-
Singh, K.A., Srinival and Tiwari, M.K., Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved parallel genetic algorithms. Int. J. Prod. Econ., 2004, 91, 135-147.
-
Singh, K.A., Srinival and Tiwari, M.K., Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved parallel genetic algorithms. Int. J. Prod. Econ., 2004, 91, 135-147.
-
-
-
-
21
-
-
0033741404
-
A multiple traveling salesman problem model for hot rolling scheduling in Shanghi Baoshan Iron and Steel Complex
-
Tang, L.X., Liu, J.Y., Rong, A.Y. and Yang, Z.H., A multiple traveling salesman problem model for hot rolling scheduling in Shanghi Baoshan Iron and Steel Complex. Euro. J. Oper. Res., 2000, 124, 267-282.
-
(2000)
Euro. J. Oper. Res
, vol.124
, pp. 267-282
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
22
-
-
0035899628
-
A review of planning and scheduling systems and methods for integrated steel production
-
Tang, L.X., Liu, J.Y., Rong, A.Y. and Yang, Z.H., A review of planning and scheduling systems and methods for integrated steel production. Euro. J. Oper. Res., 2001, 133, 1-20.
-
(2001)
Euro. J. Oper. Res
, vol.133
, pp. 1-20
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
23
-
-
0033706812
-
Toward a heuristic optimum design of rolling schedules for tandem cold rolling mills
-
Wang, D.D., Tieu, A.K., de Boer, F.G., Ma, B. and Yuen, W.Y.D., Toward a heuristic optimum design of rolling schedules for tandem cold rolling mills. Eng. Applic. Artif. Intel., 2000, 13, 397-406.
-
(2000)
Eng. Applic. Artif. Intel
, vol.13
, pp. 397-406
-
-
Wang, D.D.1
Tieu, A.K.2
de Boer, F.G.3
Ma, B.4
Yuen, W.Y.D.5
-
24
-
-
14044268702
-
An effective hybrid optimisation approach for multi-objective flexible job-shop scheduling problems
-
Xia, W.J. and Wu, Z.M., An effective hybrid optimisation approach for multi-objective flexible job-shop scheduling problems. Comp. & Indust. Eng., 2005, 48, 409-425.
-
(2005)
Comp. & Indust. Eng
, vol.48
, pp. 409-425
-
-
Xia, W.J.1
Wu, Z.M.2
-
25
-
-
4344597999
-
A quantum particle swarm optimisation
-
Yang, S.Y., Wang, M. and Jiao, L.C., A quantum particle swarm optimisation. Evol. Comput., CEC2004, 2004, 1, 320-324.
-
(2004)
Evol. Comput
, vol.CEC2004
, Issue.1
, pp. 320-324
-
-
Yang, S.Y.1
Wang, M.2
Jiao, L.C.3
|