메뉴 건너뛰기




Volumn 46, Issue 7, 2008, Pages 1869-1885

A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime

Author keywords

Inventory management; Just in time; Theory of constraints

Indexed keywords

INVENTORY MANAGEMENT;

EID: 39449108575     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600972943     Document Type: Article
Times cited : (33)

References (24)
  • 1
    • 0028511861 scopus 로고
    • Does protective capacity assist managers in competing along time-based dimensions?
    • Atwater, J.B. and Chakravorty, S.S., Does protective capacity assist managers in competing along time-based dimensions? Prod. Invent. Manage. J., 1994, 35, 53-59.
    • (1994) Prod. Invent. Manage. J , vol.35 , pp. 53-59
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 2
    • 84986958388 scopus 로고
    • A review of the Kanban production control research literature
    • Berkley, B.J., A review of the Kanban production control research literature. Prod. Oper. Manage., 1992, 1, 393-411.
    • (1992) Prod. Oper. Manage , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 4
    • 84987012950 scopus 로고
    • A general approach for coordinating production in multi-cell manufacturing systems
    • Buzacott, J.A. and Shanthikumar, J.G., A general approach for coordinating production in multi-cell manufacturing systems. Prod. Oper. Manage., 1992, 1, 34-52.
    • (1992) Prod. Oper. Manage , vol.1 , pp. 34-52
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 5
    • 0030555416 scopus 로고    scopus 로고
    • A comparative study of line design approaches for serial production systems
    • Chakravorty, S.S. and Atwater, J.B., A comparative study of line design approaches for serial production systems. Int. J. Oper. Prod. Manage., 1996, 16, 91.
    • (1996) Int. J. Oper. Prod. Manage , vol.16 , pp. 91
    • Chakravorty, S.S.1    Atwater, J.B.2
  • 6
    • 0023981046 scopus 로고
    • The role of work-in-process inventory in serial production lines
    • Conway, R., Maxwell, W., McClain, J.O. and Thomas, L.J., The role of work-in-process inventory in serial production lines. Oper. Res., 1988, 36, 229.
    • (1988) Oper. Res , vol.36 , pp. 229
    • Conway, R.1    Maxwell, W.2    McClain, J.O.3    Thomas, L.J.4
  • 7
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks
    • Cook, D.P., A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Invent. Manage. J., 1994, 35, 73-78.
    • (1994) Prod. Invent. Manage. J , vol.35 , pp. 73-78
    • Cook, D.P.1
  • 8
    • 39449125079 scopus 로고    scopus 로고
    • Dunn, P., The wafer fab: Linking real world with cyber-world, Available online at: http://www.facsnet.org/tools/sci tech/tech/fundaments/process.php3, 2000 (accessed 15 March 2004).
    • Dunn, P., The wafer fab: Linking real world with cyber-world, Available online at: http://www.facsnet.org/tools/sci tech/tech/fundaments/process.php3, 2000 (accessed 15 March 2004).
  • 9
    • 21844504189 scopus 로고
    • practices and performance
    • Relationship between JIT and TQM
    • Flynn, B.B., Sakakibara, S. and Schroeder, R.G., Relationship between JIT and TQM: practices and performance. Acad. Manage. J., 1995, 38, 1325.
    • (1995) Acad. Manage. J , vol.38 , pp. 1325
    • Flynn, B.B.1    Sakakibara, S.2    Schroeder, R.G.3
  • 12
    • 0004244246 scopus 로고
    • North River Press: Croton-on-Hudson, NY
    • Goldratt, E.M. and Cox, J., The Goal, 1992 (North River Press: Croton-on-Hudson, NY).
    • (1992) The Goal
    • Goldratt, E.M.1    Cox, J.2
  • 15
    • 1342265927 scopus 로고    scopus 로고
    • Comparison of DBR with CONWIP in an unbalanced production line with three stations
    • Koh, S.G. and Bulfin, R.L., Comparison of DBR with CONWIP in an unbalanced production line with three stations. Int. J. Prod. Res., 2004, 42, 391-404.
    • (2004) Int. J. Prod. Res , vol.42 , pp. 391-404
    • Koh, S.G.1    Bulfin, R.L.2
  • 16
    • 0002636447 scopus 로고
    • Buffer stock allocation in serial and assembly type of production lines
    • Lambrecht, M.R. and Segaert, A., Buffer stock allocation in serial and assembly type of production lines. Int. J. Oper. Prod. Manage., 1990, 10, 47-61.
    • (1990) Int. J. Oper. Prod. Manage , vol.10 , pp. 47-61
    • Lambrecht, M.R.1    Segaert, A.2
  • 17
    • 0242333195 scopus 로고    scopus 로고
    • Selection of management accounting systems in just-in-time and theory of constraints-based manufacturing
    • Lea, B.-R. and Min, H., Selection of management accounting systems in just-in-time and theory of constraints-based manufacturing. Int. J. Prod. Res., 2003, 41, 2879.
    • (2003) Int. J. Prod. Res , vol.41 , pp. 2879
    • Lea, B.-R.1    Min, H.2
  • 21
    • 0026414517 scopus 로고
    • Buffer management: A diagnostic tool for production control
    • Schragenheim, E. and Ronen, B., Buffer management: a diagnostic tool for production control. Prod. Invent. Manage. J., 1991, 32, 74-79.
    • (1991) Prod. Invent. Manage. J , vol.32 , pp. 74-79
    • Schragenheim, E.1    Ronen, B.2
  • 24
    • 33847418712 scopus 로고    scopus 로고
    • The evolution of a management philosophy: The theory of constraints
    • doi: 10.1016/j.jom.2006.04.004
    • Watson, K.J., Blackstone Jr, J.H. and Gardiner, S.C., The evolution of a management philosophy: the theory of constraints. J. Oper. Manage., 2006 (doi: 10.1016/j.jom.2006.04.004.
    • J. Oper. Manage , vol.2006
    • Watson, K.J.1    Blackstone Jr, J.H.2    Gardiner, S.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.