-
1
-
-
0028511861
-
Does protective capacity assist managers in competing along time-based dimensions?
-
Atwater, J.B. and Chakravorty, S.S., Does protective capacity assist managers in competing along time-based dimensions? Prod. Invent. Manage. J., 1994, 35, 53-59.
-
(1994)
Prod. Invent. Manage. J
, vol.35
, pp. 53-59
-
-
Atwater, J.B.1
Chakravorty, S.S.2
-
2
-
-
84986958388
-
A review of the Kanban production control research literature
-
Berkley, B.J., A review of the Kanban production control research literature. Prod. Oper. Manage., 1992, 1, 393-411.
-
(1992)
Prod. Oper. Manage
, vol.1
, pp. 393-411
-
-
Berkley, B.J.1
-
4
-
-
84987012950
-
A general approach for coordinating production in multi-cell manufacturing systems
-
Buzacott, J.A. and Shanthikumar, J.G., A general approach for coordinating production in multi-cell manufacturing systems. Prod. Oper. Manage., 1992, 1, 34-52.
-
(1992)
Prod. Oper. Manage
, vol.1
, pp. 34-52
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
5
-
-
0030555416
-
A comparative study of line design approaches for serial production systems
-
Chakravorty, S.S. and Atwater, J.B., A comparative study of line design approaches for serial production systems. Int. J. Oper. Prod. Manage., 1996, 16, 91.
-
(1996)
Int. J. Oper. Prod. Manage
, vol.16
, pp. 91
-
-
Chakravorty, S.S.1
Atwater, J.B.2
-
6
-
-
0023981046
-
The role of work-in-process inventory in serial production lines
-
Conway, R., Maxwell, W., McClain, J.O. and Thomas, L.J., The role of work-in-process inventory in serial production lines. Oper. Res., 1988, 36, 229.
-
(1988)
Oper. Res
, vol.36
, pp. 229
-
-
Conway, R.1
Maxwell, W.2
McClain, J.O.3
Thomas, L.J.4
-
7
-
-
0028403388
-
A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks
-
Cook, D.P., A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Invent. Manage. J., 1994, 35, 73-78.
-
(1994)
Prod. Invent. Manage. J
, vol.35
, pp. 73-78
-
-
Cook, D.P.1
-
8
-
-
39449125079
-
-
Dunn, P., The wafer fab: Linking real world with cyber-world, Available online at: http://www.facsnet.org/tools/sci tech/tech/fundaments/process.php3, 2000 (accessed 15 March 2004).
-
Dunn, P., The wafer fab: Linking real world with cyber-world, Available online at: http://www.facsnet.org/tools/sci tech/tech/fundaments/process.php3, 2000 (accessed 15 March 2004).
-
-
-
-
9
-
-
21844504189
-
practices and performance
-
Relationship between JIT and TQM
-
Flynn, B.B., Sakakibara, S. and Schroeder, R.G., Relationship between JIT and TQM: practices and performance. Acad. Manage. J., 1995, 38, 1325.
-
(1995)
Acad. Manage. J
, vol.38
, pp. 1325
-
-
Flynn, B.B.1
Sakakibara, S.2
Schroeder, R.G.3
-
10
-
-
0004193453
-
-
South-Western Publishing Co, Cincinnati, OH
-
Fogarty, D.W., Blackstone, J.H. and Hoffman, T.R., Production and Inventory Management, 1991 (South-Western Publishing Co.: Cincinnati, OH).
-
(1991)
Production and Inventory Management
-
-
Fogarty, D.W.1
Blackstone, J.H.2
Hoffman, T.R.3
-
11
-
-
21144461154
-
Drum-buffer-rope and buffer management study and practices
-
Gardiner, S.C., Blackstone Jr, J.H. and Gardiner, L.R., Drum-buffer-rope and buffer management study and practices. Int. J. Oper. Prod. Manage., 1993, 13, 68-78.
-
(1993)
Int. J. Oper. Prod. Manage
, vol.13
, pp. 68-78
-
-
Gardiner, S.C.1
Blackstone Jr, J.H.2
Gardiner, L.R.3
-
12
-
-
0004244246
-
-
North River Press: Croton-on-Hudson, NY
-
Goldratt, E.M. and Cox, J., The Goal, 1992 (North River Press: Croton-on-Hudson, NY).
-
(1992)
The Goal
-
-
Goldratt, E.M.1
Cox, J.2
-
14
-
-
0003636877
-
-
Sage Publications: Thousand Oaks, CA
-
Jaccard, J. and Wan, C.K., LISREL, Approaches to Interaction Effects in Multiple Regression, 1996 (Sage Publications: Thousand Oaks, CA).
-
(1996)
LISREL, Approaches to Interaction Effects in Multiple Regression
-
-
Jaccard, J.1
Wan, C.K.2
-
15
-
-
1342265927
-
Comparison of DBR with CONWIP in an unbalanced production line with three stations
-
Koh, S.G. and Bulfin, R.L., Comparison of DBR with CONWIP in an unbalanced production line with three stations. Int. J. Prod. Res., 2004, 42, 391-404.
-
(2004)
Int. J. Prod. Res
, vol.42
, pp. 391-404
-
-
Koh, S.G.1
Bulfin, R.L.2
-
16
-
-
0002636447
-
Buffer stock allocation in serial and assembly type of production lines
-
Lambrecht, M.R. and Segaert, A., Buffer stock allocation in serial and assembly type of production lines. Int. J. Oper. Prod. Manage., 1990, 10, 47-61.
-
(1990)
Int. J. Oper. Prod. Manage
, vol.10
, pp. 47-61
-
-
Lambrecht, M.R.1
Segaert, A.2
-
17
-
-
0242333195
-
Selection of management accounting systems in just-in-time and theory of constraints-based manufacturing
-
Lea, B.-R. and Min, H., Selection of management accounting systems in just-in-time and theory of constraints-based manufacturing. Int. J. Prod. Res., 2003, 41, 2879.
-
(2003)
Int. J. Prod. Res
, vol.41
, pp. 2879
-
-
Lea, B.-R.1
Min, H.2
-
20
-
-
0025699540
-
Drum-buffer-rope shop floor control
-
Schragenheim, E. and Ronen, B., Drum-buffer-rope shop floor control. Prod. Invent. Manage. J., 1990, 31, 18-22.
-
(1990)
Prod. Invent. Manage. J
, vol.31
, pp. 18-22
-
-
Schragenheim, E.1
Ronen, B.2
-
21
-
-
0026414517
-
Buffer management: A diagnostic tool for production control
-
Schragenheim, E. and Ronen, B., Buffer management: a diagnostic tool for production control. Prod. Invent. Manage. J., 1991, 32, 74-79.
-
(1991)
Prod. Invent. Manage. J
, vol.32
, pp. 74-79
-
-
Schragenheim, E.1
Ronen, B.2
-
24
-
-
33847418712
-
The evolution of a management philosophy: The theory of constraints
-
doi: 10.1016/j.jom.2006.04.004
-
Watson, K.J., Blackstone Jr, J.H. and Gardiner, S.C., The evolution of a management philosophy: the theory of constraints. J. Oper. Manage., 2006 (doi: 10.1016/j.jom.2006.04.004.
-
J. Oper. Manage
, vol.2006
-
-
Watson, K.J.1
Blackstone Jr, J.H.2
Gardiner, S.C.3
|