메뉴 건너뛰기




Volumn 29, Issue 1, 2008, Pages 125-129

Maintenance optimization of concrete bridge deck using the niched Pareto genetic algorithm

Author keywords

Bridge management; Concrete bridge deck; Genetic algorithm; Maintenance strategy; Multiobjective optimization; Niched Pareto genetic algorithm

Indexed keywords

CONCRETE BRIDGES; GENETIC ALGORITHMS; MAINTENANCE; MATHEMATICAL MODELS; MULTIOBJECTIVE OPTIMIZATION; PARETO PRINCIPLE;

EID: 39149130364     PISSN: 10053026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (8)
  • 1
    • 0002524505 scopus 로고    scopus 로고
    • Maintenance strategy optimization of bridge decks using genetic algorithm
    • Liu C L, Hammad A, Itoh Y. Maintenance strategy optimization of bridge decks using genetic algorithm[J]. Journal of Transportation Engineering, 1997, 123(2): 91-100.
    • (1997) Journal of Transportation Engineering , vol.123 , Issue.2 , pp. 91-100
    • Liu, C.L.1    Hammad, A.2    Itoh, Y.3
  • 2
    • 0026837119 scopus 로고
    • Optimal long-term scheduling of bridge deck replacement and rehabilitation
    • Jacobs T J. Optimal long-term scheduling of bridge deck replacement and rehabilitation[J]. Journal of Transportation Engineering, 1992, 118(2): 312-322.
    • (1992) Journal of Transportation Engineering , vol.118 , Issue.2 , pp. 312-322
    • Jacobs, T.J.1
  • 3
    • 0031281662 scopus 로고    scopus 로고
    • Multiobjective optimization of bridge deck reliabilitation using a genetic algorithm
    • Liu C L, Hammad A, Itoh Y. Multiobjective optimization of bridge deck reliabilitation using a genetic algorithm[J]. Microcomputers in Civil Engineering, 1997, 12: 431-443.
    • (1997) Microcomputers in Civil Engineering , vol.12 , pp. 431-443
    • Liu, C.L.1    Hammad, A.2    Itoh, Y.3
  • 4
    • 18144398964 scopus 로고    scopus 로고
    • Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety and life-cycle cost
    • Liu M, Frangopol D M. Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety and life-cycle cost[J]. Journal of Structural Engineering, 2005, 131(5): 833-842.
    • (2005) Journal of Structural Engineering , vol.131 , Issue.5 , pp. 833-842
    • Liu, M.1    Frangopol, D.M.2
  • 5
    • 2442628344 scopus 로고    scopus 로고
    • Optimal bridge maintenance planning based on probabilistic performance prediction
    • Liu M, Frangopol D M. Optimal bridge maintenance planning based on probabilistic performance prediction[J]. Engineering Structures, 2004, 26: 991-1002.
    • (2004) Engineering Structures , vol.26 , pp. 991-1002
    • Liu, M.1    Frangopol, D.M.2
  • 6
    • 4344592780 scopus 로고    scopus 로고
    • Optimization of concrete bridge deck maintenance using compromise programming
    • Xiong Hui, Shi Qi-xin. Optimization of concrete bridge deck maintenance using compromise programming[J]. Journal of Tsinghua University: Natural Science, 2004, 44(6): 789-792.
    • (2004) Journal of Tsinghua University: Natural Science , vol.44 , Issue.6 , pp. 789-792
    • Xiong, H.1    Shi, Q.-X.2
  • 8
    • 0004200312 scopus 로고
    • Multiobjective optimization using the niched Pareto genetic algorithm
    • Urbana: University of Illinois
    • Horn J, Nafpliotis N. Multiobjective optimization using the niched Pareto genetic algorithm[R]. Urbana: University of Illinois, 1993.
    • (1993)
    • Horn, J.1    Nafpliotis, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.