메뉴 건너뛰기




Volumn 44, Issue 6, 2004, Pages 789-792

Optimization of concrete bridge deck maintenance using compromise programming

Author keywords

Bridge management; Compromise programming; Highway engineering; Multi objective optimization

Indexed keywords

BRIDGE DECK MAINTENANCE; COMPROMISE PROGRAMMING; MULTIOBJECTIVE OPTIMIZATION;

EID: 4344592780     PISSN: 10000054     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (9)

References (6)
  • 1
    • 0024774420 scopus 로고
    • A dynamic optimization model for bridge management systems
    • Jiang Y, Sinha K C. A dynamic optimization model for bridge management systems [J]. Transportation Research Record, 1989, 1211: 92-100.
    • (1989) Transportation Research Record , vol.1211 , pp. 92-100
    • Jiang, Y.1    Sinha, K.C.2
  • 2
    • 0026837119 scopus 로고
    • Optimal long-term scheduling of bridge deck replacement and rehabilitation
    • Jacobs T J. Optimal long-term scheduling of bridge deck replacement and rehabilitation [J] J Transportation Eng, 1992, 118(2): 312-322.
    • (1992) J. Transportation Eng. , vol.118 , Issue.2 , pp. 312-322
    • Jacobs, T.J.1
  • 4
    • 0030261394 scopus 로고    scopus 로고
    • Bridge management by dynamic programming and neural networks
    • Razaqpur A G, El Halim A O A, Mohamed H A. Bridge management by dynamic programming and neural networks [J]. Can J Civil Eng, 1996, 23(5): 1064-1069
    • (1996) Can J Civil Eng , vol.23 , Issue.5 , pp. 1064-1069
    • Razaqpur, A.G.1    El Halim, A.O.A.2    Mohamed, H.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.