메뉴 건너뛰기




Volumn 28, Issue 1, 2008, Pages 100-105

Reliability impacts of large scale utilization of wind energy on electric power systems

Author keywords

Power system; Reliability; Wind energy; Wind farms

Indexed keywords

ENERGY CONVERSION; ENERGY RESOURCES; ENERGY UTILIZATION; RELIABILITY;

EID: 39149119956     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (37)

References (18)
  • 1
    • 0034156385 scopus 로고    scopus 로고
    • Reliability model of wind power plants and its application
    • in Chinese
    • Chen Shuyong, Dai Huizhu. Bai Xiaomin. et al. Reliability model of wind power plants and its application [J]. Proceedings of the CSEE, 2000, 20 (3): 26-28 (in Chinese).
    • (2000) Proceedings of the CSEE , vol.20 , Issue.3 , pp. 26-28
    • Chen, S.1    Dai, H.2    Bai, X.3
  • 2
    • 21444440115 scopus 로고    scopus 로고
    • Resarch on the capacity credit of wind energy resources
    • in Chinese
    • Wang Hanchao, Lu Zongxiang, Zhou Shuangxi, et al. Resarch on the capacity credit of wind energy resources [J]. Proceedings of the CSEE, 2005, 25 (10): 103-106 (in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.10 , pp. 103-106
    • Wang, H.1    Lu, Z.2    Zhou, S.3
  • 3
    • 16644403816 scopus 로고    scopus 로고
    • Power flow analysis in electrical power networks including wind farms
    • in Chinese
    • Wu Yichun, Ding Ming, Zhang Lijun. Power flow analysis in electrical power networks including wind farms [J]. Proceedings of the CSEE, 2005, 25 (4): 36-39 (in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.4 , pp. 36-39
    • Wu, Y.1    Ding, M.2    Zhang, L.3
  • 4
    • 1642535671 scopus 로고    scopus 로고
    • A new method for evaluating operation of wind power plant
    • in Chinese
    • Shen Hong, Wang Weisheng. A new method for evaluating operation of wind power plant [J]. Proceedings of the CSEE, 2003, 23 (9): 90-93 (in Chinese).
    • (2003) Proceedings of the CSEE , vol.23 , Issue.9 , pp. 90-93
    • Shen, H.1    Wang, W.2
  • 5
    • 21844477547 scopus 로고    scopus 로고
    • Wind speed and generated power forecasting in wind farm
    • in Chinese
    • Yang Xiuyuan, Xiao Yang, Chen Shuyong. Wind speed and generated power forecasting in wind farm [J]. Proceedings of the CSEE, 2005, 25 (11): 1-5 (in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.11 , pp. 1-5
    • Yang, X.1    Xiao, Y.2    Chen, S.3
  • 6
    • 0024103858 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation, 1982-1987
    • New York
    • Allen R, Billinton R. Shahidehpour S M, et al. Bibliography on the application of probability methods in power system reliability evaluation, 1982-1987 [C]. IEEE Winter Meeting, New York, 1988.
    • (1988) IEEE Winter Meeting
    • Allen, R.1    Billinton, R.2    Shahidehpour, S.M.3
  • 7
    • 0028370657 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation, 1987-1991
    • Allen R, Billinton R, Brelpohl A M, et al. Bibliography on the application of probability methods in power system reliability evaluation, 1987-1991 [J]. IEEE Transactions on Power Systems, 1994, 9 (1): 42-44.
    • (1994) IEEE Transactions on Power Systems , vol.9 , Issue.1 , pp. 42-44
    • Allen, R.1    Billinton, R.2    Brelpohl, A.M.3
  • 8
    • 0033079764 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation. 1992-1996
    • Allen R, Billinton R, Breipohl A M, et al. Bibliography on the application of probability methods in power system reliability evaluation. 1992-1996 [J]. IEEE Transactions on Power Systems, 1999, 14 (1): 51-57.
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.1 , pp. 51-57
    • Allen, R.1    Billinton, R.2    Breipohl, A.M.3
  • 9
    • 85008048742 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation, 1996-1999
    • Billinton R, Fotuhi-Firuzabad M, Bertling L. Bibliography on the application of probability methods in power system reliability evaluation, 1996-1999 [J]. IEEE Transactions on Power Systems, 2001, 16 (4): 595-602.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 595-602
    • Billinton, R.1    Fotuhi-Firuzabad, M.2    Bertling, L.3
  • 10
    • 0035506347 scopus 로고    scopus 로고
    • A comparison between chronological and probabilistic methods to estimate wind power capacity credit
    • Castro Rui M G, Ferreira Luis A F M. A comparison between chronological and probabilistic methods to estimate wind power capacity credit [J]. IEEE Transactions on Power Systems, 2001, 16 (4): 904-909.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 904-909
    • Rui, M.G.C.1    Luis, A.F.M.F.2
  • 12
    • 33744552716 scopus 로고    scopus 로고
    • Wind power simulation model for reliability evaluation
    • Saskatoon
    • Rajesh Karki, Po Hu. Wind power simulation model for reliability evaluation [C]. IEEE Can. Conf. Comput. Eng., Saskatoon, 2005.
    • (2005) IEEE Can. Conf. Comput. Eng.
    • Karki, R.1    Hu, P.2
  • 13
    • 0024719222 scopus 로고
    • A reliability test system for educational purpose-basic data
    • Billinton R, Kumar S, Chowdhury N, et al. A reliability test system for educational purpose-basic data [J]. IEEE Transactions on Power Systems, 1989, 4 (3): 1238-1244.
    • (1989) IEEE Transactions on Power Systems , vol.4 , Issue.3 , pp. 1238-1244
    • Billinton, R.1    Kumar, S.2    Chowdhury, N.3
  • 14
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • Billinton R, Chen H, Ghajar R. Time-series models for reliability evaluation of power systems including wind energy [J]. Microelectron Reliability, 1996, 36 (9): 1253-1261.
    • (1996) Microelectron Reliability , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 15
    • 33749844746 scopus 로고    scopus 로고
    • Capacity adequacy evaluation of wind-diesel-storage system
    • in Chinese
    • Li Wenyi, Zhang Baohui, Bagen. Capacity adequacy evaluation of wind-diesel-storage system [J]. Proceedings of the CSEE, 2006, 26 (16): 62-67 (in Chinese).
    • (2006) Proceedings of the CSEE , vol.26 , Issue.16 , pp. 62-67
    • Li, W.1    Zhang, B.2    Bagen3
  • 16
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • Giorsetto P, Utsurogi K F. Development of a new procedure for reliability modeling of wind turbine generators [J]. IEEE Transactions on Power Apparatus and Systems, 1983, PAS-102 (1): 134-143.
    • (1983) IEEE Transactions on Power Apparatus and Systems , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto, P.1    Utsurogi, K.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.