메뉴 건너뛰기




Volumn 23, Issue 9, 2003, Pages 90-93

New method for evaluating operation of wind power plant

Author keywords

Capacity factor; Production; Wind power plant; Wind resource

Indexed keywords

ELECTRIC POWER PLANTS; WIND TURBINES;

EID: 1642535671     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (16)

References (5)
  • 1
    • 0035376925 scopus 로고    scopus 로고
    • An optimization method for determining wind power penetration limit in power system under static security constraints
    • Lei Yazhou, Wang Weisheng, Yin Yonghua, et al. An optimization method for determining wind power penetration limit in power system under static security constraints [J]. Proceedings of the CSEE, 2001, 21(6): 25-28.
    • (2001) Proceedings of the CSEE , vol.21 , Issue.6 , pp. 25-28
    • Lei, Y.1    Wang, W.2    Yin, Y.3
  • 2
    • 1642530799 scopus 로고    scopus 로고
    • Chinese source
  • 3
    • 1942490306 scopus 로고
    • Expert group study on recommended practices for wind turbine testing and evaluation - Estimation of cost of energy from wind energy conversion systems
    • Tande J O, Hunter R. Expert group study on recommended practices for wind turbine testing and evaluation - estimation of cost of energy from wind energy conversion systems [R]. 1994.
    • (1994)
    • Tande, J.O.1    Hunter, R.2
  • 5
    • 0035451837 scopus 로고    scopus 로고
    • Using neural networks to estimate wind turbine power generation
    • Li Shuhui, Wunsch D C, O'Hair E A, et al. Using neural networks to estimate wind turbine power generation [J]. IEEE Transactions on Energy Conversion, 2001, 16(3): 276-282.
    • (2001) IEEE Transactions on Energy Conversion , vol.16 , Issue.3 , pp. 276-282
    • Li, S.1    Wunsch, D.C.2    O'Hair, E.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.