메뉴 건너뛰기




Volumn 112, Issue 1, 2008, Pages 470-482

Rapid cost estimation of metallic components for the aerospace industry

Author keywords

Cost estimation; Neural networks; Non parametric models

Indexed keywords

BUDGET CONTROL; COST ACCOUNTING; NEURAL NETWORKS; POLYNOMIALS; TURBINES;

EID: 38749133306     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.05.016     Document Type: Article
Times cited : (29)

References (38)
  • 1
    • 33846428465 scopus 로고    scopus 로고
    • Supplier evaluation and management system for strategic sourcing based on a new multicriteria sorting procedure
    • Araz C., and Ozkarahana I. Supplier evaluation and management system for strategic sourcing based on a new multicriteria sorting procedure. International Journal of Production Economics 106 2 (2007) 585-606
    • (2007) International Journal of Production Economics , vol.106 , Issue.2 , pp. 585-606
    • Araz, C.1    Ozkarahana, I.2
  • 2
    • 84867951133 scopus 로고    scopus 로고
    • A non-parametric approach to pricing and hedging derivative securities: With an application to LIFFE data
    • Barria J.A., and Hall S.G. A non-parametric approach to pricing and hedging derivative securities: With an application to LIFFE data. Computational Economics 19 3 (2002) 303-322
    • (2002) Computational Economics , vol.19 , Issue.3 , pp. 303-322
    • Barria, J.A.1    Hall, S.G.2
  • 3
    • 33748756687 scopus 로고    scopus 로고
    • Theoretical issues in production scheduling and control & planning and control of supply chains and production. A fuzzy model for load-oriented manufacturing control
    • Bonfattia M., Caridia M., and Schiavinab L. Theoretical issues in production scheduling and control & planning and control of supply chains and production. A fuzzy model for load-oriented manufacturing control. International Journal of Production Economics 104 2 (2006) 502-513
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 502-513
    • Bonfattia, M.1    Caridia, M.2    Schiavinab, L.3
  • 4
    • 4344661344 scopus 로고    scopus 로고
    • Methodology of machining costs evaluation for die and mould manufacturing
    • Bouaziz Z., Younes J.B., and Zghal A. Methodology of machining costs evaluation for die and mould manufacturing. Journal of Materials Processing Technology 152 2 (2004) 237-245
    • (2004) Journal of Materials Processing Technology , vol.152 , Issue.2 , pp. 237-245
    • Bouaziz, Z.1    Younes, J.B.2    Zghal, A.3
  • 5
    • 84950771789 scopus 로고
    • Estimating optimal transformations for multiple regression and correlation
    • Breiman L., and Friedman J.H. Estimating optimal transformations for multiple regression and correlation. Journal of the American Statistical Association 80 391 (1985) 580-598
    • (1985) Journal of the American Statistical Association , vol.80 , Issue.391 , pp. 580-598
    • Breiman, L.1    Friedman, J.H.2
  • 7
    • 84947318637 scopus 로고
    • Locally-weighted regression: An approach to regression analysis by local fitting
    • Cleveland W.S., and Devlin S.J. Locally-weighted regression: An approach to regression analysis by local fitting. Journal of American Statistical Association 83 403 (1988) 596-610
    • (1988) Journal of American Statistical Association , vol.83 , Issue.403 , pp. 596-610
    • Cleveland, W.S.1    Devlin, S.J.2
  • 8
    • 38749154400 scopus 로고    scopus 로고
    • Cost Estimating Handbook, 2002. NASA, 〈www.jsc.nasa.gov/bu2/PCEHHTML/pceh.htm〉.
    • Cost Estimating Handbook, 2002. NASA, 〈www.jsc.nasa.gov/bu2/PCEHHTML/pceh.htm〉.
  • 9
    • 38749085042 scopus 로고    scopus 로고
    • Edwards, D.J., 1999. A methodology for predicting the total average hourly maintenance cost of tracked hydraulic excavators operating in the UK opencast mining industry. Ph.D. Thesis, University of Wolverhampton.
    • Edwards, D.J., 1999. A methodology for predicting the total average hourly maintenance cost of tracked hydraulic excavators operating in the UK opencast mining industry. Ph.D. Thesis, University of Wolverhampton.
  • 10
    • 0242574912 scopus 로고    scopus 로고
    • Cost estimates to guide pre-selection of processes
    • Esawi A.M.K., and Ashby M.F. Cost estimates to guide pre-selection of processes. Materials and Design 24 8 (2003) 605-616
    • (2003) Materials and Design , vol.24 , Issue.8 , pp. 605-616
    • Esawi, A.M.K.1    Ashby, M.F.2
  • 13
    • 0001968889 scopus 로고
    • On the bias in flexible functional forms and an essentially unbiased form-The fourier flexible form
    • Gallant R. On the bias in flexible functional forms and an essentially unbiased form-The fourier flexible form. Journal of Econometrics 15 2 (1981) 211-245
    • (1981) Journal of Econometrics , vol.15 , Issue.2 , pp. 211-245
    • Gallant, R.1
  • 15
    • 0033702654 scopus 로고    scopus 로고
    • Environmental supply chain dynamics
    • Hall J. Environmental supply chain dynamics. Journal of Cleaner Production 8 6 (2000) 466-471
    • (2000) Journal of Cleaner Production , vol.8 , Issue.6 , pp. 466-471
    • Hall, J.1
  • 17
    • 33744982850 scopus 로고    scopus 로고
    • Cost estimation in mechanical production: The cost entity approach applied to integrated product engineering
    • H'mida F., Martin P., and Vernadat F. Cost estimation in mechanical production: The cost entity approach applied to integrated product engineering. International Journal of Production Economics 103 1 (2006) 17-35
    • (2006) International Journal of Production Economics , vol.103 , Issue.1 , pp. 17-35
    • H'mida, F.1    Martin, P.2    Vernadat, F.3
  • 19
    • 38749113860 scopus 로고    scopus 로고
    • 〈http://www.eng.dmu.ac.uk/concurrent/proj11.htm〉, accessed 5 December 2004.
    • 〈http://www.eng.dmu.ac.uk/concurrent/proj11.htm〉, accessed 5 December 2004.
  • 20
    • 38749153719 scopus 로고    scopus 로고
    • 〈http://www.pri-network.org/〉, accessed 1 December 2004.
    • 〈http://www.pri-network.org/〉, accessed 1 December 2004.
  • 21
    • 0029729037 scopus 로고    scopus 로고
    • Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression
    • Hua G.B. Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression. Construction Management and Economics 14 (1996) 25-34
    • (1996) Construction Management and Economics , vol.14 , pp. 25-34
    • Hua, G.B.1
  • 22
    • 84993911657 scopus 로고
    • A non-parametric approach to pricing and hedging derivative securities via learning networks
    • Hutchinson J.M., Lo A.W., and Poggio T. A non-parametric approach to pricing and hedging derivative securities via learning networks. Journal of Finance 49 3 (1994) 851-889
    • (1994) Journal of Finance , vol.49 , Issue.3 , pp. 851-889
    • Hutchinson, J.M.1    Lo, A.W.2    Poggio, T.3
  • 24
    • 38749132108 scopus 로고    scopus 로고
    • Kearns, P., 1993. Volatility and the pricing of interest rate derivative claims, Ph.D. Thesis, University of Rochester.
    • Kearns, P., 1993. Volatility and the pricing of interest rate derivative claims, Ph.D. Thesis, University of Rochester.
  • 27
    • 0032036279 scopus 로고    scopus 로고
    • Global strategic benchmarking, critical capabilities and performance of aerospace subcontractors
    • Lefevbre E., and Lefevbre L.A. Global strategic benchmarking, critical capabilities and performance of aerospace subcontractors. Technovation 18 4 (1998) 223-234
    • (1998) Technovation , vol.18 , Issue.4 , pp. 223-234
    • Lefevbre, E.1    Lefevbre, L.A.2
  • 30
    • 9944234945 scopus 로고    scopus 로고
    • Supply chain management challeges for aerospace control technologies leader
    • Sameer K., and Krob W. Supply chain management challeges for aerospace control technologies leader. Technovation 25 1 (2004) 53-59
    • (2004) Technovation , vol.25 , Issue.1 , pp. 53-59
    • Sameer, K.1    Krob, W.2
  • 33
    • 0032318101 scopus 로고    scopus 로고
    • A methodology for modelling manufacturing costs at conceptual design
    • Sumaira R., and Guenov M.D. A methodology for modelling manufacturing costs at conceptual design. Computers and Industrial Engineering 35 3-4 (1998) 623-626
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.3-4 , pp. 623-626
    • Sumaira, R.1    Guenov, M.D.2
  • 34
    • 38749119147 scopus 로고    scopus 로고
    • The European Aerospace Industry Facts & Figures, 2002. AECMA 2003.
    • The European Aerospace Industry Facts & Figures, 2002. AECMA 2003.
  • 37
    • 38749087732 scopus 로고    scopus 로고
    • Warples, J., 1997. RJB mining falls deeper into the pit. The Sunday Times, Business Supplement, 26 October 1997, p. 10.
    • Warples, J., 1997. RJB mining falls deeper into the pit. The Sunday Times, Business Supplement, 26 October 1997, p. 10.
  • 38
    • 0028457079 scopus 로고
    • Predicting changes in construction cost indexes using neural networks
    • Williams T.P. Predicting changes in construction cost indexes using neural networks. Journal of Construction Engineering and Management 120 2 (1994) 306-320
    • (1994) Journal of Construction Engineering and Management , vol.120 , Issue.2 , pp. 306-320
    • Williams, T.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.