메뉴 건너뛰기




Volumn 104, Issue 2, 2006, Pages 502-513

A fuzzy model for load-oriented manufacturing control

Author keywords

Expert systems; Fuzzy logic; Neural networks; Workload control

Indexed keywords

FUZZY SETS; JOB ANALYSIS; MATHEMATICAL MODELS; PARAMETER ESTIMATION; SCHEDULING;

EID: 33748756687     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.10.005     Document Type: Article
Times cited : (12)

References (35)
  • 1
    • 0037081993 scopus 로고    scopus 로고
    • A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
    • Balasubramanian J., and Grossmann I.E. A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26 (2002) 41-57
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 41-57
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 2
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte W. Theory and practice of load-oriented manufacturing control. International Journal of Production Research 26 3 (1988) 375-395
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 3
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control, just-in-time production for job-shops
    • Bechte W. Load-oriented manufacturing control, just-in-time production for job-shops. Production Planning and Control 5 3 (1994) 292-307
    • (1994) Production Planning and Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 4
    • 1842635125 scopus 로고    scopus 로고
    • Quantification of flexibility in advanced manufacturing systems using fuzzy concept
    • Beskese A., Kahraman C., and Irani Z. Quantification of flexibility in advanced manufacturing systems using fuzzy concept. International Journal of Production Economics 89 1 (2004) 45-56
    • (2004) International Journal of Production Economics , vol.89 , Issue.1 , pp. 45-56
    • Beskese, A.1    Kahraman, C.2    Irani, Z.3
  • 5
    • 33748754138 scopus 로고    scopus 로고
    • Bertrand, J.W.M., Wortmann, J.C., 1981. Production control and information systems for component-manufacturing shops. Dissertation, Elsevier, Amsterdam, The Netherlands.
  • 7
    • 33748745792 scopus 로고    scopus 로고
    • Castillo, L., Fdez.-Olivares, J., González., A., 2002. A temporal constraint based network temporal planner. Proceedings of the Workshop of the UK Planning and Scheduling Special Interest Group (PLANSIG 2002), pp. 99-109.
  • 8
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng T.C., and Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38 2 (1989) 156-166
    • (1989) European Journal of Operational Research , vol.38 , Issue.2 , pp. 156-166
    • Cheng, T.C.1    Gupta, M.C.2
  • 10
    • 33748746961 scopus 로고    scopus 로고
    • Gallo, S., Murino, T., Santillo, L., 1999. Time manufacturing prediction: preprocess model in neuro fuzzy expert system. Proceedings of ESIT '99-The European Symposium on Intelligent Techniques.
  • 11
    • 0004063090 scopus 로고
    • Prentice-Hall, Englewood Cliffs, NJ
    • Haykin S. Neural Networks (1994), Prentice-Hall, Englewood Cliffs, NJ
    • (1994) Neural Networks
    • Haykin, S.1
  • 14
    • 33748756287 scopus 로고    scopus 로고
    • Kaehler, S.D., 1998. Fuzzy Logic Tutorial. Encoder-The Newsletter of the Seattle Robotics Society, March.
  • 15
    • 0037151816 scopus 로고    scopus 로고
    • A fuzzy multiple programming approach for the selection of a flexible manufacturing system
    • Karsak E.E., and Kuzgunkaya O. A fuzzy multiple programming approach for the selection of a flexible manufacturing system. International Journal of Production Economics 79 2 (2002) 101-111
    • (2002) International Journal of Production Economics , vol.79 , Issue.2 , pp. 101-111
    • Karsak, E.E.1    Kuzgunkaya, O.2
  • 16
    • 9644297781 scopus 로고    scopus 로고
    • Data mining with neuro-fuzzy models
    • Kandel A., Bunke H., and Last M. (Eds), Physica-Verlag, Wurzburg
    • Klose A., Nürnberger A., Nauck D., and Kruse R. Data mining with neuro-fuzzy models. In: Kandel A., Bunke H., and Last M. (Eds). Data Mining and Computational Intelligence (2001), Physica-Verlag, Wurzburg 1-36
    • (2001) Data Mining and Computational Intelligence , pp. 1-36
    • Klose, A.1    Nürnberger, A.2    Nauck, D.3    Kruse, R.4
  • 17
    • 0033280453 scopus 로고    scopus 로고
    • Kruse, R., Borgelt, C., Nauck, D., 1999. Fuzzy data analysis: challenges and perspectives. Proceedings of the IEEE International Conference on Fuzzy Systems 1999 (FUZZIEEE99), Seoul, pp. 1211-1216.
  • 18
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job-shops: Improving the release method
    • Land M.J., and Gaalman G.J.C. The performance of workload control concepts in job-shops: Improving the release method. International Journal of Production Economics 56-57 (1998) 347-364
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 20
    • 0038220050 scopus 로고    scopus 로고
    • Prioritised fuzzy constraint satisfaction problems: axioms, instantiation and validation
    • Luo X., Lee J., Leung H., and Jennings N.R. Prioritised fuzzy constraint satisfaction problems: axioms, instantiation and validation. Fuzzy Sets and Systems 136 2 (2003) 155-188
    • (2003) Fuzzy Sets and Systems , vol.136 , Issue.2 , pp. 155-188
    • Luo, X.1    Lee, J.2    Leung, H.3    Jennings, N.R.4
  • 21
  • 22
    • 33748743218 scopus 로고    scopus 로고
    • Monostori, L., Egresits, C., Hornyák, J., Viharos, Z. J., 1998. Soft computing and hybrid AI approaches to Intelligent manufacturing. Proceedings of the 11th International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, vol. 8, pp. 763-774.
  • 26
    • 29444438437 scopus 로고
    • Dynamic job-shop scheduling: A survey of simulation Research
    • Ramasesh R. Dynamic job-shop scheduling: A survey of simulation Research. Omega 18 1 (1990) 43-57
    • (1990) Omega , vol.18 , Issue.1 , pp. 43-57
    • Ramasesh, R.1
  • 28
    • 33748751227 scopus 로고    scopus 로고
    • Tatsiopoulos, I.P., 1983. A microcomputer-based interactive system for managing production and marketing in small component manufacturing firms using a hierarchical backlog control and lead time management methodology. Unpublished Ph.D. Dissertation, University of Lancaster.
  • 29
    • 84942845328 scopus 로고    scopus 로고
    • Lessons from past, current issues and future research directions in extracting the knowledge embedded in artificial neural networks
    • Wermter S., and Sun R. (Eds), Springer, Berlin
    • Tickle A.B., Maire F., Bologna G., Andrews R., and Diederich J. Lessons from past, current issues and future research directions in extracting the knowledge embedded in artificial neural networks. In: Wermter S., and Sun R. (Eds). Hybrid Neural Systems (2000), Springer, Berlin 226-239
    • (2000) Hybrid Neural Systems , pp. 226-239
    • Tickle, A.B.1    Maire, F.2    Bologna, G.3    Andrews, R.4    Diederich, J.5
  • 32
    • 0002274219 scopus 로고
    • Input/output control: a real handle on lead time
    • Wight O. Input/output control: a real handle on lead time. Production and Inventory Management 11 3 (1970) 9-31
    • (1970) Production and Inventory Management , vol.11 , Issue.3 , pp. 9-31
    • Wight, O.1
  • 33
    • 0033742040 scopus 로고    scopus 로고
    • Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling
    • Yang S., and Wang D. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling. IEEE Transactions on Neural Networks 11 2 (2000) 474-486
    • (2000) IEEE Transactions on Neural Networks , vol.11 , Issue.2 , pp. 474-486
    • Yang, S.1    Wang, D.2
  • 35
    • 0015558134 scopus 로고
    • Outline of a new approach to the analysis of complex systems and decision processes
    • Zadeh L.A. Outline of a new approach to the analysis of complex systems and decision processes. IEEE Transanctions on Systems, Man and Cybernetics SMC-3 1 (1973) 28-44
    • (1973) IEEE Transanctions on Systems, Man and Cybernetics , vol.SMC-3 , Issue.1 , pp. 28-44
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.