-
1
-
-
0037081993
-
A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
-
Balasubramanian J., and Grossmann I.E. A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26 (2002) 41-57
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 41-57
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
2
-
-
0023979312
-
Theory and practice of load-oriented manufacturing control
-
Bechte W. Theory and practice of load-oriented manufacturing control. International Journal of Production Research 26 3 (1988) 375-395
-
(1988)
International Journal of Production Research
, vol.26
, Issue.3
, pp. 375-395
-
-
Bechte, W.1
-
3
-
-
0002479150
-
Load-oriented manufacturing control, just-in-time production for job-shops
-
Bechte W. Load-oriented manufacturing control, just-in-time production for job-shops. Production Planning and Control 5 3 (1994) 292-307
-
(1994)
Production Planning and Control
, vol.5
, Issue.3
, pp. 292-307
-
-
Bechte, W.1
-
4
-
-
1842635125
-
Quantification of flexibility in advanced manufacturing systems using fuzzy concept
-
Beskese A., Kahraman C., and Irani Z. Quantification of flexibility in advanced manufacturing systems using fuzzy concept. International Journal of Production Economics 89 1 (2004) 45-56
-
(2004)
International Journal of Production Economics
, vol.89
, Issue.1
, pp. 45-56
-
-
Beskese, A.1
Kahraman, C.2
Irani, Z.3
-
5
-
-
33748754138
-
-
Bertrand, J.W.M., Wortmann, J.C., 1981. Production control and information systems for component-manufacturing shops. Dissertation, Elsevier, Amsterdam, The Netherlands.
-
-
-
-
7
-
-
33748745792
-
-
Castillo, L., Fdez.-Olivares, J., González., A., 2002. A temporal constraint based network temporal planner. Proceedings of the Workshop of the UK Planning and Scheduling Special Interest Group (PLANSIG 2002), pp. 99-109.
-
-
-
-
8
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng T.C., and Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38 2 (1989) 156-166
-
(1989)
European Journal of Operational Research
, vol.38
, Issue.2
, pp. 156-166
-
-
Cheng, T.C.1
Gupta, M.C.2
-
10
-
-
33748746961
-
-
Gallo, S., Murino, T., Santillo, L., 1999. Time manufacturing prediction: preprocess model in neuro fuzzy expert system. Proceedings of ESIT '99-The European Symposium on Intelligent Techniques.
-
-
-
-
11
-
-
0004063090
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Haykin S. Neural Networks (1994), Prentice-Hall, Englewood Cliffs, NJ
-
(1994)
Neural Networks
-
-
Haykin, S.1
-
13
-
-
0031176650
-
Supporting production planning by production process simulation
-
Johtela T., Smed J., Johnsson M., and Nevalainen O. Supporting production planning by production process simulation. Computer Integrated Manufacturing Systems 10 3 (2000) 193-203
-
(2000)
Computer Integrated Manufacturing Systems
, vol.10
, Issue.3
, pp. 193-203
-
-
Johtela, T.1
Smed, J.2
Johnsson, M.3
Nevalainen, O.4
-
14
-
-
33748756287
-
-
Kaehler, S.D., 1998. Fuzzy Logic Tutorial. Encoder-The Newsletter of the Seattle Robotics Society, March.
-
-
-
-
15
-
-
0037151816
-
A fuzzy multiple programming approach for the selection of a flexible manufacturing system
-
Karsak E.E., and Kuzgunkaya O. A fuzzy multiple programming approach for the selection of a flexible manufacturing system. International Journal of Production Economics 79 2 (2002) 101-111
-
(2002)
International Journal of Production Economics
, vol.79
, Issue.2
, pp. 101-111
-
-
Karsak, E.E.1
Kuzgunkaya, O.2
-
16
-
-
9644297781
-
Data mining with neuro-fuzzy models
-
Kandel A., Bunke H., and Last M. (Eds), Physica-Verlag, Wurzburg
-
Klose A., Nürnberger A., Nauck D., and Kruse R. Data mining with neuro-fuzzy models. In: Kandel A., Bunke H., and Last M. (Eds). Data Mining and Computational Intelligence (2001), Physica-Verlag, Wurzburg 1-36
-
(2001)
Data Mining and Computational Intelligence
, pp. 1-36
-
-
Klose, A.1
Nürnberger, A.2
Nauck, D.3
Kruse, R.4
-
17
-
-
0033280453
-
-
Kruse, R., Borgelt, C., Nauck, D., 1999. Fuzzy data analysis: challenges and perspectives. Proceedings of the IEEE International Conference on Fuzzy Systems 1999 (FUZZIEEE99), Seoul, pp. 1211-1216.
-
-
-
-
18
-
-
0032156960
-
The performance of workload control concepts in job-shops: Improving the release method
-
Land M.J., and Gaalman G.J.C. The performance of workload control concepts in job-shops: Improving the release method. International Journal of Production Economics 56-57 (1998) 347-364
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 347-364
-
-
Land, M.J.1
Gaalman, G.J.C.2
-
20
-
-
0038220050
-
Prioritised fuzzy constraint satisfaction problems: axioms, instantiation and validation
-
Luo X., Lee J., Leung H., and Jennings N.R. Prioritised fuzzy constraint satisfaction problems: axioms, instantiation and validation. Fuzzy Sets and Systems 136 2 (2003) 155-188
-
(2003)
Fuzzy Sets and Systems
, vol.136
, Issue.2
, pp. 155-188
-
-
Luo, X.1
Lee, J.2
Leung, H.3
Jennings, N.R.4
-
22
-
-
33748743218
-
-
Monostori, L., Egresits, C., Hornyák, J., Viharos, Z. J., 1998. Soft computing and hybrid AI approaches to Intelligent manufacturing. Proceedings of the 11th International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, vol. 8, pp. 763-774.
-
-
-
-
26
-
-
29444438437
-
Dynamic job-shop scheduling: A survey of simulation Research
-
Ramasesh R. Dynamic job-shop scheduling: A survey of simulation Research. Omega 18 1 (1990) 43-57
-
(1990)
Omega
, vol.18
, Issue.1
, pp. 43-57
-
-
Ramasesh, R.1
-
28
-
-
33748751227
-
-
Tatsiopoulos, I.P., 1983. A microcomputer-based interactive system for managing production and marketing in small component manufacturing firms using a hierarchical backlog control and lead time management methodology. Unpublished Ph.D. Dissertation, University of Lancaster.
-
-
-
-
29
-
-
84942845328
-
Lessons from past, current issues and future research directions in extracting the knowledge embedded in artificial neural networks
-
Wermter S., and Sun R. (Eds), Springer, Berlin
-
Tickle A.B., Maire F., Bologna G., Andrews R., and Diederich J. Lessons from past, current issues and future research directions in extracting the knowledge embedded in artificial neural networks. In: Wermter S., and Sun R. (Eds). Hybrid Neural Systems (2000), Springer, Berlin 226-239
-
(2000)
Hybrid Neural Systems
, pp. 226-239
-
-
Tickle, A.B.1
Maire, F.2
Bologna, G.3
Andrews, R.4
Diederich, J.5
-
30
-
-
0009890030
-
-
Hanser Verlag, Munich
-
Wiendahl H.-P. Belastungsorientierte Fertigungssteuerung, Grundlagen, Verfahrensaufbau, Realisierung (1987), Hanser Verlag, Munich
-
(1987)
Belastungsorientierte Fertigungssteuerung, Grundlagen, Verfahrensaufbau, Realisierung
-
-
Wiendahl, H.-P.1
-
32
-
-
0002274219
-
Input/output control: a real handle on lead time
-
Wight O. Input/output control: a real handle on lead time. Production and Inventory Management 11 3 (1970) 9-31
-
(1970)
Production and Inventory Management
, vol.11
, Issue.3
, pp. 9-31
-
-
Wight, O.1
-
33
-
-
0033742040
-
Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling
-
Yang S., and Wang D. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling. IEEE Transactions on Neural Networks 11 2 (2000) 474-486
-
(2000)
IEEE Transactions on Neural Networks
, vol.11
, Issue.2
, pp. 474-486
-
-
Yang, S.1
Wang, D.2
-
35
-
-
0015558134
-
Outline of a new approach to the analysis of complex systems and decision processes
-
Zadeh L.A. Outline of a new approach to the analysis of complex systems and decision processes. IEEE Transanctions on Systems, Man and Cybernetics SMC-3 1 (1973) 28-44
-
(1973)
IEEE Transanctions on Systems, Man and Cybernetics
, vol.SMC-3
, Issue.1
, pp. 28-44
-
-
Zadeh, L.A.1
|