메뉴 건너뛰기




Volumn 159, Issue 1, 2008, Pages 315-331

Optimal production scheduling for the dairy industry

Author keywords

Mixed integer linear programming; Optimization; Packaging; Parallel machines; Scheduling; Yogurt

Indexed keywords


EID: 38749126259     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-007-0285-y     Document Type: Article
Times cited : (41)

References (15)
  • 1
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • 2
    • Allahverdi, A., Gupta, J. N. D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, 27(2), 219-239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 0037028817 scopus 로고    scopus 로고
    • Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines
    • Chen, C., Liu, C., Feng, X., & Shao, H. (2002). Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines. Industrial Engineering & Chemistry Research, 41, 1249-1260.
    • (2002) Industrial Engineering & Chemistry Research , vol.41 , pp. 1249-1260
    • Chen, C.1    Liu, C.2    Feng, X.3    Shao, H.4
  • 4
    • 0037411865 scopus 로고    scopus 로고
    • Efficient scheduling of consumer goods manufacturing processes in the continuous time domain
    • 9
    • Giannelos, N. F., & Georgiadis, M. C. (2003). Efficient scheduling of consumer goods manufacturing processes in the continuous time domain. Computers & Operations Research, 30(9), 1367-1381.
    • (2003) Computers & Operations Research , vol.30 , pp. 1367-1381
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 5
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for sheduling multiproduct, multistage batch plants
    • Gupta, S., & Karimi, I. A. (2003). An improved MILP formulation for sheduling multiproduct, multistage batch plants. Industrial Engineering & Chemistry Research, 42, 2365-2380.
    • (2003) Industrial Engineering & Chemistry Research , vol.42 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.A.2
  • 6
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • 10
    • Janak, S. L., Lin, X., & Floudas, C. A. (2004). Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Industrial Engineering & Chemistry Research, 43(10), 2516-2533.
    • (2004) Industrial Engineering & Chemistry Research , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 7
    • 0032652235 scopus 로고    scopus 로고
    • Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
    • 2
    • Kang, S., Malik, K., & Thomas, L. J. (1999). Lotsizing and scheduling on parallel machines with sequence-dependent setup costs. Management Science, 45(2), 273-289.
    • (1999) Management Science , vol.45 , pp. 273-289
    • Kang, S.1    Malik, K.2    Thomas, L.J.3
  • 8
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling
    • 7
    • Karimi, I. A., & McDonald, C. M. (1997). Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling. Industrial Engineering & Chemistry Research, 36(7), 2701-2714.
    • (1997) Industrial Engineering & Chemistry Research , vol.36 , pp. 2701-2714
    • Karimi, I.A.1    McDonald, C.M.2
  • 10
    • 0037138682 scopus 로고    scopus 로고
    • Scheduling parallel production lines with resource constraints. 1. Model formulation
    • Lamba, N., & Karimi, I. A. (2002). Scheduling parallel production lines with resource constraints. 1. Model formulation. Industrial Engineering & Chemistry Research, 41, 779-789.
    • (2002) Industrial Engineering & Chemistry Research , vol.41 , pp. 779-789
    • Lamba, N.1    Karimi, I.A.2
  • 11
    • 0346734333 scopus 로고    scopus 로고
    • Resource-constrained scheduling of parallel production lines using asynchronous slots
    • 26
    • Lim, M.-F., & Karimi, I. A. (2003). Resource-constrained scheduling of parallel production lines using asynchronous slots. Industrial Engineering & Chemistry Research, 42(26), 6832-6842.
    • (2003) Industrial Engineering & Chemistry Research , vol.42 , pp. 6832-6842
    • Lim, M.-F.1    Karimi, I.A.2
  • 13
    • 0032386621 scopus 로고    scopus 로고
    • Assignment and sequencing models for the scheduling of process systems
    • Pinto, J. M., & Grossmann, I. E. (1998). Assignment and sequencing models for the scheduling of process systems. Annals of Operations Research, 81, 433-466.
    • (1998) Annals of Operations Research , vol.81 , pp. 433-466
    • Pinto, J.M.1    Grossmann, I.E.2
  • 14
    • 0029712714 scopus 로고    scopus 로고
    • Industrial experience with a mathematical-programming based system for factory systems planning/ scheduling
    • 2
    • Tahmassebi, T. (1996). Industrial experience with a mathematical- programming based system for factory systems planning/ scheduling. Computers & Chemical Engineering, 20(2), 1565-1570.
    • (1996) Computers & Chemical Engineering , vol.20 , pp. 1565-1570
    • Tahmassebi, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.