-
1
-
-
38649133932
-
Commercializing infrastructure technologies
-
Civil Engineering Research Foundation, Reston, VA
-
CERF. Commercializing infrastructure technologies. CERF Report #97-5028 (1997), Civil Engineering Research Foundation, Reston, VA
-
(1997)
CERF Report #97-5028
-
-
CERF1
-
4
-
-
0004554435
-
Technology strategy and competitive performance in bridge construction
-
Hampson K., and Tatum C.B. Technology strategy and competitive performance in bridge construction. Journal of Construction Engineering and Management 123 2 (1997) 153-161
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.2
, pp. 153-161
-
-
Hampson, K.1
Tatum, C.B.2
-
5
-
-
0032206527
-
The impact of information technology in design and construction: the owner's perspective
-
Johnson R.E., and Clayton M.J. The impact of information technology in design and construction: the owner's perspective. Automation in Construction 8 1 (1998) 3-14
-
(1998)
Automation in Construction
, vol.8
, Issue.1
, pp. 3-14
-
-
Johnson, R.E.1
Clayton, M.J.2
-
6
-
-
0034149666
-
Cost and schedule impacts of information management on EPC process
-
Back W.E., and Moreau K.A. Cost and schedule impacts of information management on EPC process. Journal of Management in Engineering 16 2 (2000) 59-70
-
(2000)
Journal of Management in Engineering
, vol.16
, Issue.2
, pp. 59-70
-
-
Back, W.E.1
Moreau, K.A.2
-
7
-
-
13944267273
-
-
Construction Industry Institute (CII), Austin, TX
-
Thomas S.R., Macken C.L., and Lee S.H. Impacts of Design/Information Technology on Building and Industrial Projects, BMM2001-10 (2001), Construction Industry Institute (CII), Austin, TX
-
(2001)
Impacts of Design/Information Technology on Building and Industrial Projects, BMM2001-10
-
-
Thomas, S.R.1
Macken, C.L.2
Lee, S.H.3
-
8
-
-
13944258129
-
Project performance vs. use of technologies at the project- and phase-levels
-
O'Connor J.T., and Yang L. Project performance vs. use of technologies at the project- and phase-levels. Journal of Construction Engineering and Management 130 3 (2004) 322-329
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.3
, pp. 322-329
-
-
O'Connor, J.T.1
Yang, L.2
-
9
-
-
1642311288
-
-
Center for Construction Industry Studies, Austin, TX
-
O'Connor J.T., Kumashiro M.E., Welch K.A., Hadeed S.P., Braden K.E., and Deogaonkar M.J. Project- and Phase-Level Technology use Metrics for Capital Facility Projects, Report vol. 16 (2000), Center for Construction Industry Studies, Austin, TX
-
(2000)
Project- and Phase-Level Technology use Metrics for Capital Facility Projects, Report
, vol.16
-
-
O'Connor, J.T.1
Kumashiro, M.E.2
Welch, K.A.3
Hadeed, S.P.4
Braden, K.E.5
Deogaonkar, M.J.6
-
12
-
-
17044363126
-
Is IT training in construction industry useful
-
Tse R.Y., and Choy L. Is IT training in construction industry useful. Journal of Construction Research 6 1 (2005) 1-13
-
(2005)
Journal of Construction Research
, vol.6
, Issue.1
, pp. 1-13
-
-
Tse, R.Y.1
Choy, L.2
-
13
-
-
13844280953
-
Factors affecting ICT diffusion: a case study of three large Australian construction contractors
-
Peansupap V., and Walker D. Factors affecting ICT diffusion: a case study of three large Australian construction contractors. Engineering, Construction and Architectural Management 12 1 (2005) 21-37
-
(2005)
Engineering, Construction and Architectural Management
, vol.12
, Issue.1
, pp. 21-37
-
-
Peansupap, V.1
Walker, D.2
-
14
-
-
2342427970
-
The relationship between changes in equipment technology and wages in the US construction industry
-
Goodrum P.M., and Gangwar M. The relationship between changes in equipment technology and wages in the US construction industry. Construction Management and Economics 22 3 (2004) 291-301
-
(2004)
Construction Management and Economics
, vol.22
, Issue.3
, pp. 291-301
-
-
Goodrum, P.M.1
Gangwar, M.2
-
16
-
-
38649101352
-
-
K.J. Fergusson, Impact of integration on industrial facility quality, PhD Thesis, Stanford University, 1993.
-
K.J. Fergusson, Impact of integration on industrial facility quality, PhD Thesis, Stanford University, 1993.
-
-
-
-
18
-
-
2342432839
-
An analysis of the impacts of using three dimensional computer models in the management of construction
-
Construction Industry Institute (CII), Austin, TX
-
Griffis F.H., Hogan D.B., and Li W. An analysis of the impacts of using three dimensional computer models in the management of construction. Research Report 106-11 (1995), Construction Industry Institute (CII), Austin, TX
-
(1995)
Research Report 106-11
-
-
Griffis, F.H.1
Hogan, D.B.2
Li, W.3
-
19
-
-
0011423675
-
Determining the impact of information management on project schedule and cost
-
Construction Industry Institute (CII), Austin, TX
-
Back W.E., Moreau K.A., and Toon J. Determining the impact of information management on project schedule and cost. Research Report 125-11 (1996), Construction Industry Institute (CII), Austin, TX
-
(1996)
Research Report 125-11
-
-
Back, W.E.1
Moreau, K.A.2
Toon, J.3
-
20
-
-
0030446198
-
Information technology and perceived competitive advantage: an empirical study of engineering consulting firms in Taiwan
-
Tan R.R. Information technology and perceived competitive advantage: an empirical study of engineering consulting firms in Taiwan. Construction Management and Economics 14 3 (1996) 227-240
-
(1996)
Construction Management and Economics
, vol.14
, Issue.3
, pp. 227-240
-
-
Tan, R.R.1
-
21
-
-
84993030019
-
IT implementation in the construction organization
-
Whyte J., Bouchlaghem D., and Thorpe T. IT implementation in the construction organization. Engineering, Construction and Architectural Management 9 5-6 (2002) 371-377
-
(2002)
Engineering, Construction and Architectural Management
, vol.9
, Issue.5-6
, pp. 371-377
-
-
Whyte, J.1
Bouchlaghem, D.2
Thorpe, T.3
-
22
-
-
2342443555
-
Partial factor productivity and equipment technology change at activity level in U.S. construction industry
-
Goodrum P.M., and Haas C.T. Partial factor productivity and equipment technology change at activity level in U.S. construction industry. Journal of Construction Engineering and Management 128 6 (2002) 463-472
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.6
, pp. 463-472
-
-
Goodrum, P.M.1
Haas, C.T.2
-
23
-
-
4143060657
-
Impacts of CAD on design realization
-
De Lapp J.A., Ford D.N., Bryant J.A., and Horlen J. Impacts of CAD on design realization. Engineering, Construction and Architectural Management 11 4 (2004) 284-291
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.4
, pp. 284-291
-
-
De Lapp, J.A.1
Ford, D.N.2
Bryant, J.A.3
Horlen, J.4
-
24
-
-
9444243216
-
The role of technology transfer in innovation within small construction firms
-
Sexton M., and Barrett P. The role of technology transfer in innovation within small construction firms. Engineering, Construction and Architectural Management 11 5 (2004) 342-348
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.5
, pp. 342-348
-
-
Sexton, M.1
Barrett, P.2
-
25
-
-
22144498504
-
The relative impacts of selected practices on project cost and schedule
-
Lee S., Thomas S.R., and Tucker R.L. The relative impacts of selected practices on project cost and schedule. Construction Management and Economics 23 5 (2005) 545-553
-
(2005)
Construction Management and Economics
, vol.23
, Issue.5
, pp. 545-553
-
-
Lee, S.1
Thomas, S.R.2
Tucker, R.L.3
-
27
-
-
38649142554
-
-
K.A. Welch, Development of a tool for assessing the degree of automation and integration on capital projects, MS Thesis, The University of Texas at Austin, 1998.
-
K.A. Welch, Development of a tool for assessing the degree of automation and integration on capital projects, MS Thesis, The University of Texas at Austin, 1998.
-
-
-
-
28
-
-
38649097301
-
-
M.E. Kumashiro, Measuring automation and integration in the construction industry, MS Thesis, The University of Texas at Austin, 1999.
-
M.E. Kumashiro, Measuring automation and integration in the construction industry, MS Thesis, The University of Texas at Austin, 1999.
-
-
-
-
29
-
-
0003506109
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Hair J.F., Anderson R.E., Tatham R.L., and Black W.C. Data Analysis with Readings. 4th ed. (1995), Prentice-Hall, Englewood Cliffs, NJ
-
(1995)
Data Analysis with Readings. 4th ed.
-
-
Hair, J.F.1
Anderson, R.E.2
Tatham, R.L.3
Black, W.C.4
-
30
-
-
38649095399
-
-
S. Won, A model for work function-based prioritization of technologies for capital projects, PhD Thesis, The University of Texas at Austin, 2002.
-
S. Won, A model for work function-based prioritization of technologies for capital projects, PhD Thesis, The University of Texas at Austin, 2002.
-
-
-
-
31
-
-
0035581097
-
Building project scope definition using project definition rating index
-
Cho C.S., and Gibson G.E. Building project scope definition using project definition rating index. Journal of Architectural Engineering 7 4 (2001) 115-125
-
(2001)
Journal of Architectural Engineering
, vol.7
, Issue.4
, pp. 115-125
-
-
Cho, C.S.1
Gibson, G.E.2
-
32
-
-
34250650567
-
Comparison of technology utilization and benefits in Taiwanese and U.S. industries
-
Yang L., O'Connor J.T., and Huang C. Comparison of technology utilization and benefits in Taiwanese and U.S. industries. Journal of Management in Engineering 23 3 (2007) 147-155
-
(2007)
Journal of Management in Engineering
, vol.23
, Issue.3
, pp. 147-155
-
-
Yang, L.1
O'Connor, J.T.2
Huang, C.3
-
33
-
-
34249736383
-
Assessment of automation and integration technology's impact on project stakeholder success
-
Yang L., O'Connor J.T., and Chen J. Assessment of automation and integration technology's impact on project stakeholder success. Automation in Construction 16 6 (2007) 725-733
-
(2007)
Automation in Construction
, vol.16
, Issue.6
, pp. 725-733
-
-
Yang, L.1
O'Connor, J.T.2
Chen, J.3
-
35
-
-
0033081540
-
Project success index for capital facility construction projects
-
Griffith A.F., Gibson G.E., Hamilton M.R., Tortora A.L., and Wilson C.T. Project success index for capital facility construction projects. Journal of Performance of Constructed Facilities 13 1 (1999) 39-45
-
(1999)
Journal of Performance of Constructed Facilities
, vol.13
, Issue.1
, pp. 39-45
-
-
Griffith, A.F.1
Gibson, G.E.2
Hamilton, M.R.3
Tortora, A.L.4
Wilson, C.T.5
|