-
1
-
-
0004499349
-
Global supply chain management at Digital Equipment Corporation
-
Arntzen, B.C., Brown, G.G., Harrison, T.P., Trafton, L.L.: Global supply chain management at Digital Equipment Corporation. Interfaces 25(1), 69-93 (1995)
-
(1995)
Interfaces
, vol.25
, Issue.1
, pp. 69-93
-
-
Arntzen, B.C.1
Brown, G.G.2
Harrison, T.P.3
Trafton, L.L.4
-
2
-
-
0035576510
-
An industrial organization economic supply chain approach for the construction industry: A review
-
London, K.A., Kenley, R.: An industrial organization economic supply chain approach for the construction industry: a review. Construction Management and Economics 19, 777-788 (2001)
-
(2001)
Construction Management and Economics
, vol.19
, pp. 777-788
-
-
London, K.A.1
Kenley, R.2
-
3
-
-
38149056877
-
Construction supply-chain management: A vision for advanced coordination, costing, and control
-
Stanford, California
-
O'Brien, W.J.: Construction supply-chain management: a vision for advanced coordination, costing, and control. In: NSF Berkeley-Stanford Construction Research Workshop, Stanford, California (1999)
-
(1999)
NSF Berkeley-Stanford Construction Research Workshop
-
-
O'Brien, W.J.1
-
4
-
-
1642618562
-
Product modelling to support case-based construction planning and scheduling
-
Dzeng, R.J., Tommelein, I.D.: Product modelling to support case-based construction planning and scheduling. Automation in Construction 13(3), 341-360 (2004)
-
(2004)
Automation in Construction
, vol.13
, Issue.3
, pp. 341-360
-
-
Dzeng, R.J.1
Tommelein, I.D.2
-
5
-
-
12344305389
-
Cost impacts, scheduling impacts, and the claims process during construction
-
Chester, M., Hendrickson, C.: Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management 131(1), 102-107 (2005)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 102-107
-
-
Chester, M.1
Hendrickson, C.2
-
6
-
-
33645992444
-
Multimode Project Scheduling Based on Particle Swarm Optimization
-
Zhang, H., Tam, C.M., Li, H.: Multimode Project Scheduling Based on Particle Swarm Optimization. Computer-Aided Civil and Infrastructure Engineering 21(2), 93-103 (2006)
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.2
, pp. 93-103
-
-
Zhang, H.1
Tam, C.M.2
Li, H.3
-
7
-
-
33646584142
-
Optimal planning and scheduling for repetitive construction projects
-
Hyari, K., El-Rayes, K.: Optimal planning and scheduling for repetitive construction projects. Journal of Management in Engineering 22(1), 11-19 (2006)
-
(2006)
Journal of Management in Engineering
, vol.22
, Issue.1
, pp. 11-19
-
-
Hyari, K.1
El-Rayes, K.2
-
8
-
-
33748521972
-
Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
-
Zhu, G., Bard, J.F., Yu, G.A: Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem. INFORMS Journal on Computing 18(3), 377-390 (2006)
-
(2006)
INFORMS Journal on Computing
, vol.18
, Issue.3
, pp. 377-390
-
-
Zhu, G.1
Bard, J.F.2
Yu, G.A.3
-
9
-
-
13244265793
-
An agent-based framework for supply chain coordination in construction
-
Xue, X.L., Li, X.D., Shen, Q.P., Wang, Y.W.: An agent-based framework for supply chain coordination in construction. Automation in Construction 14(3), 413-430 (2005)
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 413-430
-
-
Xue, X.L.1
Li, X.D.2
Shen, Q.P.3
Wang, Y.W.4
-
10
-
-
1142268284
-
Flow coordination and information sharing in supply chains: Review, implications, and directions for future research
-
Sahin, F., Robinson, E.P.: Flow coordination and information sharing in supply chains: review, implications, and directions for future research. Decision Sciences 33(4), 505-536 (2002)
-
(2002)
Decision Sciences
, vol.33
, Issue.4
, pp. 505-536
-
-
Sahin, F.1
Robinson, E.P.2
-
11
-
-
34248155868
-
A probabilistic bi-level linear multi-objective programming problem to supply chain planning
-
doi:10.1016/j.amc.2006.10.032
-
Roghanian, E., Sadjadi, S.J., Aryanezhad, M.B.: A probabilistic bi-level linear multi-objective programming problem to supply chain planning. Applied Mathematics and Computation (2006), doi:10.1016/j.amc.2006.10.032
-
(2006)
Applied Mathematics and Computation
-
-
Roghanian, E.1
Sadjadi, S.J.2
Aryanezhad, M.B.3
-
12
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C.D., Cecchi, M.P.: Optimization by simulated annealing. Science 220, 671-680 (1983)
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Cecchi, M.P.3
-
13
-
-
0035370443
-
Empirical comparison of search algorithms for discrete event simulation
-
Lacksonen, T.: Empirical comparison of search algorithms for discrete event simulation. Computers & Industrial Engineering 40(1-2), 133-148 (2001)
-
(2001)
Computers & Industrial Engineering
, vol.40
, Issue.1-2
, pp. 133-148
-
-
Lacksonen, T.1
-
14
-
-
0001438534
-
Simulated annealing for constrained global optimization
-
Romeijn, H.E., Smith, R.L.: Simulated annealing for constrained global optimization. Journal of Global Optimization 5, 101-124 (1994)
-
(1994)
Journal of Global Optimization
, vol.5
, pp. 101-124
-
-
Romeijn, H.E.1
Smith, R.L.2
-
15
-
-
38149005882
-
A new method for solving a class of nonlinear integer programming problems
-
97-102
-
Wu, Q., Xu, N.: A new method for solving a class of nonlinear integer programming problems. Control and Decision 12(2), 97-102, 108 (1997)
-
(1997)
Control and Decision
, vol.12
, Issue.2
, pp. 108
-
-
Wu, Q.1
Xu, N.2
|