메뉴 건너뛰기




Volumn 4510 LNCS, Issue , 2007, Pages 376-390

A column generation based destructive lower bound for resource constrained project scheduling problems

Author keywords

Column generation; Cumulative constraint; Generalized precedence constraints; Linear programming; Resource constrained project scheduling

Indexed keywords

COMPUTATIONAL EFFICIENCY; CONSTRAINED OPTIMIZATION; LINEAR PROGRAMMING; PROBLEM SOLVING; SCHEDULING;

EID: 37149014590     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-540-72397-4_27     Document Type: Conference Paper
Times cited : (4)

References (10)
  • 1
    • 33750695647 scopus 로고    scopus 로고
    • Parallel machine scheduling through column generation: Minimax objective functions (extended abstract)
    • Y. Azar and T. Erlebach Eds, ESA 2006, Springer
    • J.M. VAN DEN AKKER, J.A. HOOGEVEEN, AND J.W. VAN KEMPEN (2006). Parallel machine scheduling through column generation: minimax objective functions (extended abstract). Y. Azar and T. Erlebach (Eds.) ESA 2006. LNCS 4168, Springer, 648-659.
    • (2006) LNCS , vol.4168 , pp. 648-659
    • VAN DEN AKKER, J.M.1    HOOGEVEEN, J.A.2    VAN KEMPEN, J.W.3
  • 2
    • 84890005691 scopus 로고    scopus 로고
    • J.M. VAN DEN AKKER, J.A. HOOGEVEEN, AND S.L. VAN DE VELDE (2005). Applying column generation to machine scheduling. G. Desaulniers, J. Desrosiers, and M.M. Solomon (eds.). Column Generation, Springer, 303-330.
    • J.M. VAN DEN AKKER, J.A. HOOGEVEEN, AND S.L. VAN DE VELDE (2005). Applying column generation to machine scheduling. G. Desaulniers, J. Desrosiers, and M.M. Solomon (eds.). Column Generation, Springer, 303-330.
  • 7
    • 0034563615 scopus 로고    scopus 로고
    • A linear programming and constraint propagation-based lower bound for the RCPSP
    • P. BRUCKER AND S. KNUST (2000). A linear programming and constraint propagation-based lower bound for the RCPSP. European Journal of Operational Research 121, 355-362.
    • (2000) European Journal of Operational Research , vol.121 , pp. 355-362
    • BRUCKER, P.1    KNUST, S.2
  • 8
    • 0038183863 scopus 로고    scopus 로고
    • Lower bounds for resource-constrained project scheduling problems
    • P. BRUCKER AND S. KNUST (2003). Lower bounds for resource-constrained project scheduling problems. European Journal of Operational Research 149, 302-313.
    • (2003) European Journal of Operational Research , vol.149 , pp. 302-313
    • BRUCKER, P.1    KNUST, S.2
  • 9
    • 0036182335 scopus 로고    scopus 로고
    • A constraint-based method for project scheduling with time windows
    • A. CESTA, A. ODDI, AND S.F. SMITH (2002). A constraint-based method for project scheduling with time windows. Journal of Heuristics 8, 109-136.
    • (2002) Journal of Heuristics , vol.8 , pp. 109-136
    • CESTA, A.1    ODDI, A.2    SMITH, S.F.3
  • 10
    • 33750025008 scopus 로고    scopus 로고
    • M.J. PEREIRA LOPES AND J.M. VALÉRIO DE CARVALHO (2007). A branch-andprice algorithm for scheduling parallel machines with sequence dependent setup times. European Journal of Operational Research 176, 1508-1527.
    • M.J. PEREIRA LOPES AND J.M. VALÉRIO DE CARVALHO (2007). A branch-andprice algorithm for scheduling parallel machines with sequence dependent setup times. European Journal of Operational Research 176, 1508-1527.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.