메뉴 건너뛰기




Volumn 45, Issue 4, 2003, Pages 573-583

A hybrid approach to the single line scheduling problem with multiple products and sequence-dependent time

Author keywords

Constraint logic programming; Genetic Algorithm; Scheduling

Indexed keywords

CATALYTIC CONVERTERS; COMPUTER AIDED ANALYSIS; COSTS; CUSTOMER SATISFACTION; GENETIC ALGORITHMS; INVENTORY CONTROL; LOGIC PROGRAMMING; PROBLEM SOLVING; PRODUCTION CONTROL; SCHEDULING; SENSITIVITY ANALYSIS;

EID: 0346093873     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(03)00075-5     Document Type: Article
Times cited : (13)

References (14)
  • 1
    • 0030846976 scopus 로고    scopus 로고
    • Costs in design of scheduling algorithm: A study on branch-and-bound methodology
    • Amar A.D. Costs in design of scheduling algorithm: A study on branch-and-bound methodology. Computers and Industrial Engineering. 32:1997;129-138.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 129-138
    • Amar, A.D.1
  • 4
    • 0032599591 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms: Parts II. Hybrid genetic search
    • Cheng R. A tutorial survey of job-shop scheduling problems using genetic algorithms: parts II. hybrid genetic search. Computer and Industrial Engineering. 37:1999;51-55.
    • (1999) Computer and Industrial Engineering , vol.37 , pp. 51-55
    • Cheng, R.1
  • 5
    • 0034271995 scopus 로고    scopus 로고
    • Constraint propagation techniques for the disjunctive scheduling problem
    • Dorndorf U., Pesch E., Huy T.P. Constraint propagation techniques for the disjunctive scheduling problem. Artificial Intelligence. 122:2000;189-240.
    • (2000) Artificial Intelligence , vol.122 , pp. 189-240
    • Dorndorf, U.1    Pesch, E.2    Huy, T.P.3
  • 9
    • 0034230027 scopus 로고    scopus 로고
    • Multi-product planning and scheduling using genetic algorithm approach
    • Ip W.H., Man K.F., Tang K.S. Multi-product planning and scheduling using genetic algorithm approach. Computer and Industrial Engineering. 38:2000;283-296.
    • (2000) Computer and Industrial Engineering , vol.38 , pp. 283-296
    • Ip, W.H.1    Man, K.F.2    Tang, K.S.3
  • 10
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • Jain A.S., Meeran S. Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research. 113:1999;390-434.
    • (1999) European Journal of Operational Research , vol.113 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 11
  • 12
    • 0032599594 scopus 로고    scopus 로고
    • A modified genetic algorithm for single machine scheduling
    • Liu J., Tang L. A modified genetic algorithm for single machine scheduling. Computer and Industrial Engineering. 36:1999;43-46.
    • (1999) Computer and Industrial Engineering , vol.36 , pp. 43-46
    • Liu, J.1    Tang, L.2
  • 14
    • 0032628094 scopus 로고    scopus 로고
    • Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
    • Sun X., Noble J.S., Klein C.M. Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness. IIE Transactions. 31:1999;113-124.
    • (1999) IIE Transactions , vol.31 , pp. 113-124
    • Sun, X.1    Noble, J.S.2    Klein, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.