메뉴 건너뛰기




Volumn 25, Issue 13-14, 2007, Pages 525-535

A new performance-based process model for built asset maintenance

Author keywords

Business planning; Maintenance; Performance measurement; Production processes

Indexed keywords


EID: 35548995028     PISSN: 02632772     EISSN: None     Source Type: Journal    
DOI: 10.1108/02632770710822616     Document Type: Article
Times cited : (62)

References (29)
  • 1
    • 84986134877 scopus 로고    scopus 로고
    • Quantitative models for building, repair and maintenance: A comparative case-study
    • Alani, A.M., Tattersall, R.P. and Okoroh, M.I. (2002), "Quantitative models for building, repair and maintenance: a comparative case-study", Facilities, Vol. 20 Nos 5/6, pp. 176-89.
    • (2002) Facilities , vol.20 , Issue.56 , pp. 176-89
    • Alani, A.M.1    Tattersall, R.P.2    Okoroh, M.I.3
  • 2
    • 0033340726 scopus 로고    scopus 로고
    • Issues in building maintenance: Property managers' perspective
    • Arditi, D. and Nawakorawit, M. (1999), "Issues in building maintenance: property managers' perspective", Journal of Architectural Engineering, Vol. 5 No. 4, pp. 117-32.
    • (1999) Journal of Architectural Engineering , vol.5 , Issue.4 , pp. 117-32
    • Arditi, D.1    Nawakorawit, M.2
  • 4
    • 84986082911 scopus 로고    scopus 로고
    • Dissatisfaction with stock condition surveys in social housing
    • Chapman, K. (1999), "Dissatisfaction with stock condition surveys in social housing", Structural Survey, Vol. 17 No. 4, pp. 211-5.
    • (1999) Structural Survey , vol.17 , Issue.4 , pp. 211-5
    • Chapman, K.1
  • 6
    • 14744291961 scopus 로고    scopus 로고
    • Building maintainability - Review of the state of the art
    • Chew, M.Y.L., Tan, S.S. and Kang, K.H. (2004), "Building maintainability - review of the state of the art", Journal of Architectural Engineering, Vol. 10 No. 3, pp. 80-7.
    • (2004) Journal of Architectural Engineering , vol.10 , Issue.3 , pp. 80-7
    • Chew, M.Y.L.1    Tan, S.S.2    Kang, K.H.3
  • 8
    • 35548956435 scopus 로고    scopus 로고
    • available at: www.constructingexcellence.org.uk/sectorforums/housingforum (accessed March 2007)
    • Constructing Excellence (2007), Improving the Existing Stock, available at: www.constructingexcellence.org.uk/sectorforums/housingforum (accessed March 2007).
    • (2007) Improving the Existing Stock
    • Excellence, C.1
  • 11
    • 35548933301 scopus 로고    scopus 로고
    • A sea-change in facilities management
    • Alexander, K. E & FN Spon London
    • Finch, E. (1998), "A sea-change in facilities management", in Alexander, K. (Ed.), Facilities Management Theory and Practice, E & FN Spon, London, pp. 42-56.
    • (1998) Facilities Management Theory and Practice , pp. 42-56
    • Finch, E.1
  • 12
    • 0038661713 scopus 로고    scopus 로고
    • Application of the principles of ILS to the development of cost effective maintenance strategies for existing building stock
    • El-Haram, M.A. and Horner, M.W. (2003), "Application of the principles of ILS to the development of cost effective maintenance strategies for existing building stock", Construction Management and Economics, Vol. 21, pp. 283-96.
    • (2003) Construction Management and Economics , vol.21 , pp. 283-96
    • El-Haram, M.A.1    Horner, M.W.2
  • 14
    • 35548946213 scopus 로고    scopus 로고
    • Sustainable building maintenance: Challenge for construction professionals
    • Kelly, J. Blackwell Science London
    • Jones, K. (2002), "Sustainable building maintenance: challenge for construction professionals", in Kelly, J. (Ed.), Best Value in Construction, Blackwell Science, London, pp. 280-301.
    • (2002) Best Value in Construction , pp. 280-301
    • Jones, K.1
  • 16
    • 84986031656 scopus 로고    scopus 로고
    • Potential effects of the confirmation bias in house condition surveys
    • Kempton, J., Alani, A. and Chapman, K. (2002), "Potential effects of the confirmation bias in house condition surveys", Structural Survey, Vol. 20 No. 1, pp. 6-12.
    • (2002) Structural Survey , vol.20 , Issue.1 , pp. 6-12
    • Kempton, J.1    Alani, A.2    Chapman, K.3
  • 17
    • 35548998761 scopus 로고    scopus 로고
    • "EUROLIFEFORM: an integrated probabilistic whole life cycle cost and performance model for building and civil engineering", Proceedings of COBRA 2004, 7-8 September, Leeds Metropolitan University, Leeds
    • Kirkham, R.J., Alisa, M., Pimenta da Silva, A., Grindley, T. and Brondsted, J. (2004), "EUROLIFEFORM: an integrated probabilistic whole life cycle cost and performance model for building and civil engineering", Proceedings of COBRA 2004, 7-8 September, Leeds Metropolitan University, Leeds.
    • (2004)
    • Kirkham, R.J.1    Alisa, M.2    Pimenta Da Silva, A.3    Grindley, T.4    Brondsted, J.5
  • 18
    • 0035338220 scopus 로고    scopus 로고
    • Evolution of formal maintainability program for large manufacturing company
    • Moua, B. and Russell, J.S. (2001), "Evolution of formal maintainability program for large manufacturing company", Journal of Performance of Constructed Facilities, Vol. 15 No. 2, pp. 46-53.
    • (2001) Journal of Performance of Constructed Facilities , vol.15 , Issue.2 , pp. 46-53
    • Moua, B.1    Russell, J.S.2
  • 20
    • 84986083401 scopus 로고    scopus 로고
    • Data requirement for the prioritization of predictive building maintenance
    • Pitt, T.J. (1997), "Data requirement for the prioritization of predictive building maintenance", Facilities, Vol. 15 Nos 3/4, pp. 97-104.
    • (1997) Facilities , vol.15 , Issue.34 , pp. 97-104
    • Pitt, T.J.1
  • 22
    • 84986173585 scopus 로고    scopus 로고
    • A comparative study of priority setting methods for planned maintenance of public buildings
    • Shen, Q. (1997), "A comparative study of priority setting methods for planned maintenance of public buildings", Facilities, Vol. 15 Nos 12/13, pp. 331-9.
    • (1997) Facilities , vol.15 , Issue.1213 , pp. 331-9
    • Shen, Q.1
  • 23
    • 0001768007 scopus 로고    scopus 로고
    • A review of overall models for maintenance management
    • Sherwin, D. (2000), "A review of overall models for maintenance management", Journal of Quality in Maintenance Engineering, Vol. 6 No. 3, pp. 138-64.
    • (2000) Journal of Quality in Maintenance Engineering , vol.6 , Issue.3 , pp. 138-64
    • Sherwin, D.1
  • 24
    • 35548976249 scopus 로고
    • "Prioritising major items of maintenance in large organisations", paper presented at the RICS Research Conference, Salford University, Salford, pp. 123-31
    • Spedding, A., Holmes, R. and Shen, Q. (1995), "Prioritising major items of maintenance in large organisations", paper presented at the RICS Research Conference, Salford University, Salford, pp. 123-31.
    • (1995)
    • Spedding, A.1    Holmes, R.2    Shen, Q.3
  • 25
    • 0010485808 scopus 로고    scopus 로고
    • State-of-the-art in maintenance policies of housing corporations in the Netherlands
    • McGraw-Hill Singapore
    • Staub, A. (1998), "State-of-the-art in maintenance policies of housing corporations in The Netherlands", Facilities Management and Maintenance - The Way Ahead into the Millennium, McGraw-Hill, Singapore, pp. 149-56.
    • (1998) Facilities Management and Maintenance - The Way Ahead into the Millennium , pp. 149-56
    • Staub, A.1
  • 26
    • 0036202972 scopus 로고    scopus 로고
    • Strategic dimensions of maintenance management
    • Tsang, A.H.C. (2002), "Strategic dimensions of maintenance management", Journal of Quality in Maintenance Engineering, Vol. 8 No. 1, pp. 7-39.
    • (2002) Journal of Quality in Maintenance Engineering , vol.8 , Issue.1 , pp. 7-39
    • Tsang, A.H.C.1
  • 27
    • 35548929828 scopus 로고    scopus 로고
    • "Using product models to represent user requirements", Construction on the Information Highway, CIB Proceedings Publication 198, pp. 511-524
    • Vanier, D.J., Lacasse, M.A. and Parsons, A. (1996), "Using product models to represent user requirements", Construction on the Information Highway, CIB Proceedings Publication 198, pp. 511-524.
    • (1996)
    • Vanier, D.J.1    Lacasse, M.A.2    Parsons, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.