Volumn 27, Issue 4, 2007, Pages 991-998

The risk criteria for assessment of temporary changes in a nuclear power plant

Author keywords

Probabilistic safety assessment; Risk criteria; Risk informed decision making

Indexed keywords

DECISION MAKING; NUCLEAR POWER PLANTS; PROBABILITY; RISK ASSESSMENT; SECURITY SYSTEMS;

EID: 35448944679     PISSN: 02724332     EISSN: 15396924     Source Type: Journal    
DOI: 10.1111/j.1539-6924.2007.00937.x     Document Type: Article
Times cited : (6)

References (30)
  • 10
    • 78650653637 scopus 로고
    • Safety Assessment Principles for Nuclear Plants. London, UK.
    • Health & Safety Executive 1992). Safety Assessment Principles for Nuclear Plants. London, UK.
    • (1992) Health & Safety Executive
  • 15
    • 35449006796 scopus 로고    scopus 로고
    • The Use and Development of Probabilistic Safety Assessment in NEA Member Countries. NEA/CSNI/R(2002)18.
    • The Use and Development of Probabilistic Safety Assessment in NEA Member Countries 2002). NEA/CSNI/R(2002)18.
    • (2002)
  • 17
    • 0003705986 scopus 로고
    • TR-105396. Electric Power Research Institute - EPRI.
    • TR-105396 1995). PSA Applications Guide. Electric Power Research Institute - EPRI.
    • (1995) PSA Applications Guide.
  • 19
    • 0031119917 scopus 로고    scopus 로고
    • Probabilistic safety assessment improves surveillance requirements in technical specifications
    • &
    • Čepin, M., & Mavko, B. (1997). Probabilistic safety assessment improves surveillance requirements in technical specifications. Reliability Engineering and Systems Safety, 56, 69 77.
    • (1997) Reliability Engineering and Systems Safety , vol.56 , pp. 69-77
    • Čepin, M.1    Mavko, B.2
  • 20
    • 0030650227 scopus 로고    scopus 로고
    • Comparison of testing strategies (in Slovenian)
    • &
    • Mavko, B., & Čepin, M. (1997). Comparison of testing strategies (in Slovenian). Electrotechnical Review, 64 (2/3 142 147.
    • (1997) Electrotechnical Review , vol.64 , Issue.23 , pp. 142-147
    • Mavko, B.1    Čepin, M.2
  • 24
    • 0036891162 scopus 로고    scopus 로고
    • Evaluation of allowed outage time considering a set of plant configurations
    • &
    • Čepin, M., & Martorell, S. (2002). Evaluation of allowed outage time considering a set of plant configurations. Reliability Engineering and System Safety, 78 (3 259 266.
    • (2002) Reliability Engineering and System Safety , vol.78 , Issue.3 , pp. 259-266
    • Čepin, M.1    Martorell, S.2
  • 25
    • 0036645880 scopus 로고    scopus 로고
    • Optimization of safety equipment outages improves safety
    • Čepin, M. (2002). Optimization of safety equipment outages improves safety. Reliability Engineering and System Safety, 77, 71 80.
    • (2002) Reliability Engineering and System Safety , vol.77 , pp. 71-80
    • Čepin, M.1
  • 27
    • 0037903790 scopus 로고    scopus 로고
    • Optimisation of scheduling of safety equipment testing and maintenance based on minimal risk
    • Čepin, M. (2003). Optimisation of scheduling of safety equipment testing and maintenance based on minimal risk. Electrotechnical Review, 70 (1-2 22 26.
    • (2003) Electrotechnical Review , vol.70 , Issue.12 , pp. 22-26
    • Čepin, M.1
  • 28
    • 9444277204 scopus 로고    scopus 로고
    • Analysis of truncation limit in probabilistic safety assessment
    • Čepin, M. (2005). Analysis of truncation limit in probabilistic safety assessment. Reliability Engineering and System Safety, 87 (3 395 403.
    • (2005) Reliability Engineering and System Safety , vol.87 , Issue.3 , pp. 395-403
    • Čepin, M.1
  • 29
    • 35449001105 scopus 로고    scopus 로고
    • Risk Spectrum PSAP, Relcon AB
    • Risk Spectrum PSAP, Relcon AB 2003).
    • (2003)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.