메뉴 건너뛰기




Volumn 78, Issue 3, 2002, Pages 259-266

Evaluation of allowed outage time considering a set of plant configurations

Author keywords

Allowed outage time; Probabilistic safety assessment; Risk; Safety; Technical specifications

Indexed keywords

ACCIDENT PREVENTION; PROBABILITY; RISK ASSESSMENT; SPECIFICATIONS;

EID: 0036891162     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0951-8320(02)00168-0     Document Type: Article
Times cited : (21)

References (20)
  • 6
    • 0029207825 scopus 로고
    • Improving allowed outage time and surveillance test interval requirements: A study of their interactions using probabilistic methods
    • Martorell S., Verdu V.G., Samanta P.K. Improving allowed outage time and surveillance test interval requirements: a study of their interactions using probabilistic methods. Reliab Engng Syst Safety. 47:1995;119-129.
    • (1995) Reliab Engng Syst Safety , vol.47 , pp. 119-129
    • Martorell, S.1    Verdu, V.G.2    Samanta, P.K.3
  • 11
    • 0032690658 scopus 로고    scopus 로고
    • Calculating and addressing uncertainty for risk-based allowable outage times
    • Smith C.L., Knudsen J.K., Calley M.B. Calculating and addressing uncertainty for risk-based allowable outage times. Reliab Engng Syst Safety. 66:1999;41-47.
    • (1999) Reliab Engng Syst Safety , vol.66 , pp. 41-47
    • Smith, C.L.1    Knudsen, J.K.2    Calley, M.B.3
  • 12
    • 0011582648 scopus 로고
    • NUREG/CR-2300, US NRC, Washington, DC; September
    • PRA procedures guide. NUREG/CR-2300, US NRC, Washington, DC; September 1981.
    • (1981) PRA procedures guide
  • 13
    • 0031119917 scopus 로고    scopus 로고
    • Probabilistic safety assessment improves surveillance requirements in technical specifications
    • Čepin M., Mavko B. Probabilistic safety assessment improves surveillance requirements in technical specifications. Reliab Engng Syst Safety. 56:1997;69-77.
    • (1997) Reliab Engng Syst Safety , vol.56 , pp. 69-77
    • Čepin, M.1    Mavko, B.2
  • 15
    • 0000696875 scopus 로고    scopus 로고
    • Methods for testing and maintenance of safety related equipment: Examples from an IAEA research project
    • Čepin M., Gomez Cobo A., Martorell S., Samanta P. Methods for testing and maintenance of safety related equipment: examples from an IAEA research project. Proc ESREL99: Safety Reliab. 1:1999;247-251.
    • (1999) Proc ESREL99: Safety Reliab , vol.1 , pp. 247-251
    • Čepin, M.1    Gomez Cobo, A.2    Martorell, S.3    Samanta, P.4
  • 16
    • 0036645880 scopus 로고    scopus 로고
    • Optimisation of safety equipment outages improves safety
    • Čepin M. Optimisation of safety equipment outages improves safety. Reliab Engng Syst Safety. 77:2002;77-80.
    • (2002) Reliab Engng Syst Safety , vol.77 , pp. 77-80
    • Čepin, M.1
  • 19
    • 0011581578 scopus 로고    scopus 로고
    • Evaluación de AOTs informados en el riesgo considerando diferentes modos de operación de planta
    • Valencia; 24-26 Octubre
    • Martorell S., Čepin M., Villanueva J.F., Carlos S., Sánchez A.I. Evaluación de AOTs informados en el riesgo considerando diferentes modos de operación de planta. XXVII Reunión Anual SNE, Valencia; 24-26 Octubre, 2001.
    • (2001) XXVII Reunión Anual SNE
    • Martorell, S.1    Čepin, M.2    Villanueva, J.F.3    Carlos, S.4    Sánchez, A.I.5
  • 20
    • 0011644976 scopus 로고    scopus 로고
    • Technical evaluation of the combustion engineering owners group (CEOG) joint submittal and the San Onofre plant-specific submittal for an extension to the emergency diesel generator (EDG) allowed outage time (AOT)
    • NRC JCN J-2164; July
    • Samanta P.K. Technical evaluation of the combustion engineering owners group (CEOG) joint submittal and the San Onofre plant-specific submittal for an extension to the emergency diesel generator (EDG) allowed outage time (AOT). BNL technical evaluation report. NRC JCN J-2164; July 1998.
    • (1998) BNL technical evaluation report
    • Samanta, P.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.