-
1
-
-
0013402216
-
-
working paper 203 Amos Tuck School of Business, Dartmouth College, Hanover, NH
-
Baker, K.R. (1987), "Lot streaming to reduce cycle time in a flow shop", working paper, No. 203, Amos Tuck School of Business, Dartmouth College, Hanover, NH.
-
(1987)
Lot streaming to reduce cycle time in a flow shop
-
-
Baker, K.R.1
-
2
-
-
3543072401
-
-
working paper 223 Amos Tuck School of Business, Dartmouth College, Hanover, NH
-
Baker, K.R. and Pyke, D.F. (1989), "Algorithms for the lot streaming problem", working paper, No. 223, Amos Tuck School of Business, Dartmouth College, Hanover, NH.
-
(1989)
Algorithms for the lot streaming problem
-
-
Baker, K.R.1
Pyke, D.F.2
-
3
-
-
0023366055
-
Batching to minimize flow times on one machine
-
Dobson, G., Karmakar, U.S. and Rummel, J.L. (1987), "Batching to minimize flow times on one machine", Management Science, Vol. 33, pp. 784-99.
-
(1987)
Management Science
, vol.33
, pp. 784-99
-
-
Dobson, G.1
Karmakar, U.S.2
Rummel, J.L.3
-
4
-
-
0026853703
-
A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processes
-
El-Najdawi, M.K. (1992), "A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processes", International Journal of Production Economics, Vol. 27, pp. 29-41.
-
(1992)
International Journal of Production Economics
, vol.27
, pp. 29-41
-
-
El-Najdawi, M.K.1
-
5
-
-
0028769450
-
A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes
-
El-Najdawi, M.K. (1994), "A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes", European Journal of Operation Research, Vol. 75, pp. 365-77.
-
(1994)
European Journal of Operation Research
, vol.75
, pp. 365-77
-
-
El-Najdawi, M.K.1
-
6
-
-
0001740656
-
Common cycle lot-size scheduling for multi-product, multi-stage production
-
El-Najdawi, M.K. and Kleindorfer, P.R. (1993), "Common cycle lot-size scheduling for multi-product, multi-stage production", Management Science, Vol. 39 No. 7, pp. 872-85.
-
(1993)
Management Science
, vol.39
, Issue.7
, pp. 872-85
-
-
El-Najdawi, M.K.1
Kleindorfer, P.R.2
-
7
-
-
0009457668
-
Determination of optimum production quantity for a two-stage production system
-
Goyal, S. K. (1977), "Determination of optimum production quantity for a two-stage production system", Operational Research Quarterly, Vol. 28 No. 4, pp. 865-70.
-
(1977)
Operational Research Quarterly
, vol.28
, Issue.4
, pp. 865-70
-
-
Goyal, S.K.1
-
8
-
-
0017984961
-
Economic batch quantity in a multi-stage production system
-
Goyal, S.K. (1978), "Economic batch quantity in a multi-stage production system", International Journal of Production Research, Vol. 16 No. 4, pp. 267-73.
-
(1978)
International Journal of Production Research
, vol.16
, Issue.4
, pp. 267-73
-
-
Goyal, S.K.1
-
9
-
-
0004244246
-
-
North River Press New Haven, CT
-
Goldrat, E.M and Cox, J. (1992), The Goal, North River Press, Inc. New Haven, CT.
-
(1992)
The Goal
-
-
Goldrat, E.M.1
Cox, J.2
-
10
-
-
0003710588
-
-
North River Press New Haven, CT
-
Goldratt, E.M. and Fox, R.E. (1986), The Race, North River Press, Inc. New Haven, CT.
-
(1986)
The Race
-
-
Goldratt, E.M.1
Fox, R.E.2
-
11
-
-
0027641731
-
Batch-scheduling problems through the flowshop with both receiving and delivery just in time
-
Halim, A.H. and Ohta, H. (1993), "Batch-scheduling problems through the flowshop with both receiving and delivery just in time", International Journal of Production Research, Vol. 31 No. 8, pp. 1943-55.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.8
, pp. 1943-55
-
-
Halim, A.H.1
Ohta, H.2
-
12
-
-
0031144757
-
Scheduling hybrid flow systems: An experimental investigation
-
Kadipasaoglu, S.N., Wenguang, X. and Khumawala, B.M. (1997), "Scheduling hybrid flow systems: an experimental investigation", International Journal of Production Research, Vol. 35 No. 1, pp. 1359-84.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.1
, pp. 1359-84
-
-
Kadipasaoglu, S.N.1
Wenguang, X.2
Khumawala, B.M.3
-
13
-
-
0022128589
-
Lotsizing in multi-item multi-machine job shops
-
Karmarkar, J.L. and Keker, S. (1985), "Lotsizing in multi-item multi-machine job shops", IIE Transactions, Vol. 17 No. 3, pp. 290-7.
-
(1985)
IIE Transactions
, vol.17
, Issue.3
, pp. 290-7
-
-
Karmarkar, J.L.1
Keker, S.2
-
14
-
-
84985755271
-
Optimal and heuristic model for lot splitting in a flow shop
-
Kropp, D.K. and Smunt, T.L. (1990), "Optimal and heuristic model for lot splitting in a flow shop", Decision Sciences, Vol. 2, pp. 691-709.
-
(1990)
Decision Sciences
, vol.2
, pp. 691-709
-
-
Kropp, D.K.1
Smunt, T.L.2
-
15
-
-
0024925432
-
Flow shop scheduling with lot streaming
-
Potts, C.N. and Baker, K.R. (1989), "Flow shop scheduling with lot streaming", Operation Research Letters, Vol. 8, pp. 293-303.
-
(1989)
Operation Research Letters
, vol.8
, pp. 293-303
-
-
Potts, C.N.1
Baker, K.R.2
-
16
-
-
0022132659
-
Batching in single operation manufacturing system
-
Sentos, C. and Magazine, M. (1985), "Batching in single operation manufacturing system", Operations Research Letters, Vol. 4 No. 3, pp. 99-103.
-
(1985)
Operations Research Letters
, vol.4
, Issue.3
, pp. 99-103
-
-
Sentos, C.1
Magazine, M.2
-
17
-
-
0027662155
-
Batch scheduling to minimize cycle time, flow time, and processing cost
-
Steiner, G. and Truscott, W.G. (1993), "Batch scheduling to minimize cycle time, flow time, and processing cost", IIE Transactions, Vol. 25 No. 5, pp. 90-7.
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 90-7
-
-
Steiner, G.1
Truscott, W.G.2
-
18
-
-
0016572027
-
Manufacturing cycle time determination for a multi-stage economic production quantity model
-
Szendrovits, A.Z. (1975), "Manufacturing cycle time determination for a multi-stage economic production quantity model", Management Science, Vol. 22 No. 3, pp. 298-308.
-
(1975)
Management Science
, vol.22
, Issue.3
, pp. 298-308
-
-
Szendrovits, A.Z.1
-
19
-
-
0018020598
-
A comment on determination of optimum production quantity for a two-stage production system
-
Szendrovits, A.Z. (1978), "A comment on determination of optimum production quantity for a two-stage production system", Journal of Operational Research Society, Vol. 29 No. 10, pp. 1017-20.
-
(1978)
Journal of Operational Research Society
, vol.29
, Issue.10
, pp. 1017-20
-
-
Szendrovits, A.Z.1
-
20
-
-
0020752313
-
Non-integer optimal lot size ratios in two-stage production/inventory system
-
Szendrovits, A.Z. (1983), "Non-integer optimal lot size ratios in two-stage production/inventory system", International Journal of Production Research, Vol. 21 No. 3, pp. 323-36.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.3
, pp. 323-36
-
-
Szendrovits, A.Z.1
-
21
-
-
0039078972
-
Optimizing multi-stage production with constant lot size and varying numbers of batches
-
Szendrovits, A.Z. and Drezner, Z. (1980), "Optimizing multi-stage production with constant lot size and varying numbers of batches", Omega, Vol. 8 No. 6, pp. 623-9.
-
(1980)
Omega
, vol.8
, Issue.6
, pp. 623-9
-
-
Szendrovits, A.Z.1
Drezner, Z.2
-
22
-
-
0022028816
-
Scheduling production activities in multi-stage batch manufacturing systems
-
Truscott, W.G. (1985), "Scheduling production activities in multi-stage batch manufacturing systems", International Journal of Production Research, Vol. 23 No. 2, pp. 315-28.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.2
, pp. 315-28
-
-
Truscott, W.G.1
|