메뉴 건너뛰기




Volumn 20, Issue 10, 2000, Pages 1218-1237

Decision support for the scheduling of subcontract manufacture

Author keywords

Decision support systems; Electronics industry; Manufacturing; Outsourcing; Small to medium sized enterprises; Subcontracting

Indexed keywords


EID: 3543068155     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443570010343753     Document Type: Article
Times cited : (19)

References (54)
  • 1
    • 3543131693 scopus 로고
    • Subcontracting in electronics: A case study of keltron
    • Annavajhula, J.C.B. (1988), "Subcontracting in electronics: a case study of keltron", Economic and Political Weekly, 27 August, pp. M103-M117.
    • (1988) Economic and Political Weekly
    • Annavajhula, J.C.B.1
  • 2
    • 84992969843 scopus 로고    scopus 로고
    • Strategic assessment of outsourcing and downsizing in the service market
    • Blumberg, D.F. (1998), "Strategic assessment of outsourcing and downsizing in the service market", Managing Service Quality, Vol. 8 No. 1, pp. 5-18.
    • (1998) Managing Service Quality , vol.8 , Issue.1
    • Blumberg, D.F.1
  • 5
    • 0030556067 scopus 로고    scopus 로고
    • Strategic and operational choices for small subcontracting firms: Empirical results and an interpretative model
    • De Toni, A. and Nassimbeni, G. (1996), "Strategic and operational choices for small subcontracting firms: empirical results and an interpretative model", International Journal of Operations & Production Management, Vol. 16 No. 6, pp. 41-55.
    • (1996) International Journal of Operations & Production Management , vol.16 , Issue.6
    • De Toni, A.1    Nassimbeni, G.2
  • 7
    • 3543138385 scopus 로고
    • Efficiency and value in purchasing and supply
    • Managing in the 1990s, DTI/Pub1705/10K/11.95 NP, URN 95/710
    • DTI (1995), "Efficiency and value in purchasing and supply", Department of Trade and Industry Report, Managing in the 1990s, DTI/Pub1705/10K/11.95 NP, URN 95/710, November.
    • (1995) Department of Trade and Industry Report
    • Dti1
  • 8
    • 3943074415 scopus 로고    scopus 로고
    • Using Java Applets and CORBA for multi-user distributed applications
    • Evans, E. and Rogers, D. (1997), "Using Java Applets and CORBA for multi-user distributed applications", Internet Computing, Vol. 1 No. 3, pp. 43-55.
    • (1997) Internet Computing , vol.1 , Issue.3
    • Evans, E.1    Rogers, D.2
  • 9
    • 3543061209 scopus 로고    scopus 로고
    • data supplied by Jordan & Sons
    • FAME (1997), FAME (Financial Analysis Made Easy):data supplied by Jordan & Sons, software supplied by Bureau van Dijk, February.
    • (1997) FAME (Financial Analysis Made Easy)
    • Fame1
  • 10
    • 3543101001 scopus 로고    scopus 로고
    • Focused planning and scheduling
    • Gavin, C.J. (1998), "Focused planning and scheduling", Control, Vol. 24 No. 4, p. 7.
    • (1998) Control , vol.24 , Issue.4
    • Gavin, C.J.1
  • 16
    • 0024091906 scopus 로고
    • Manufacturing at arm's length
    • Heywood, J. and Seddon, H. (1988), "Manufacturing at arm's length", Engineering, October, pp. 495-6.
    • (1988) Engineering
    • Heywood, J.1    Seddon, H.2
  • 22
    • 0031184822 scopus 로고    scopus 로고
    • Testing manufacturers' acceptance of competing subcontractor price-quality-service designs
    • Liukko, T., Vuori, R. and Woodside, A.G. (1997), "Testing manufacturers' acceptance of competing subcontractor price-quality-service designs", Industrial Marketing Management, Vol. 26, pp. 315-29.
    • (1997) Industrial Marketing Management , vol.26
    • Liukko, T.1    Vuori, R.2    Woodside, A.G.3
  • 24
    • 0029719285 scopus 로고    scopus 로고
    • 'A market approach to holonic manufacturing
    • Markus, A., Kis Vancza, T. and Monostori, L. (1996), ' 'A market approach to holonic manufacturing", Annals of the CIRP, Vol. 45 No. 1, pp. 433-6.
    • (1996) Annals of the CIRP , vol.45 , Issue.1
    • Markus, A.1    Kis Vancza, T.2    Monostori, L.3
  • 32
    • 0029748448 scopus 로고    scopus 로고
    • Finite capacity scheduling tools: Observations of installations offer some lessons
    • Porter, K., Little, D., Kenworthy, J. and Jarvis, P. (1996), "Finite capacity scheduling tools: observations of installations offer some lessons", Integrated Manufacturing Systems, Vol. 7 No. 4, pp. 34-8.
    • (1996) Integrated Manufacturing Systems , vol.7 , Issue.4
    • Porter, K.1    Little, D.2    Kenworthy, J.3    Jarvis, P.4
  • 38
    • 0031152914 scopus 로고    scopus 로고
    • Incomplete information, task assignment, and managerial control systems
    • Sridhar, S.S. and Balachandran, B.V. (1997), "Incomplete information, task assignment, and managerial control systems", Management Science, Vol. 43 No. 6, pp. 764-78.
    • (1997) Management Science , vol.43 , Issue.6
    • Sridhar, S.S.1    Balachandran, B.V.2
  • 41
    • 0027498554 scopus 로고
    • Improving British industrial performance: Lessons from Japanese subcontracting
    • Thoburn, J.T. and Takashima, M. (1993), "Improving British industrial performance: lessons from Japanese subcontracting", National Westminster Bank Quarterly Review, February, pp. 2-12.
    • (1993) National Westminster Bank Quarterly Review
    • Thoburn, J.T.1    Takashima, M.2
  • 42
    • 0032689596 scopus 로고    scopus 로고
    • Coordinating investment, production, and subcontracting
    • Van Mieghem, J.A. (1999), "Coordinating investment, production, and subcontracting", Management Science, Vol. 45 No. 7, pp. 954-71.
    • (1999) Management Science , vol.45 , Issue.7
    • Van Mieghem, J.A.1
  • 48
    • 3543097552 scopus 로고    scopus 로고
    • Towards virtual manufacturing: The case of the electronics assembly industry
    • Macmillan Press
    • Webster, M., Muhlemann, A.P. and Alder, C. (1997 b), "Towards virtual manufacturing: the case of the electronics assembly industry", Proceedings of the 32nd International MATADOR Conference, UMIST, UK, 10-11 July, Macmillan Press, ISBN 0 333 71655 8, pp. 67-72.
    • (1997) Proceedings of the 32nd International MATADOR Conference
    • Webster, M.1    Muhlemann, A.P.2    Alder, C.3
  • 49
    • 3543134854 scopus 로고    scopus 로고
    • Subcontract manufacture in electronics assembly: A survey of industry practice
    • University of Bradford
    • Webster, M., Muhlemann, A.P. and Alder, C. (1998 a), "Subcontract manufacture in electronics assembly: a survey of industry practice", Management Centre Working Paper Series, University of Bradford, No. 9814, August.
    • (1998) Management Centre Working Paper Series
    • Webster, M.1    Muhlemann, A.P.2    Alder, C.3
  • 51
    • 58149363218 scopus 로고
    • Outsourcing IT: The strategic implications
    • Willcocks, L., Fitzgerald, G. and Feeny, D. (1995), "Outsourcing IT: the strategic implications", Long Range Planning, Vol. 28 No. 5, pp. 59-70.
    • (1995) Long Range Planning , vol.28 , Issue.5
    • Willcocks, L.1    Fitzgerald, G.2    Feeny, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.