메뉴 건너뛰기




Volumn , Issue , 2006, Pages

Combined genetic algorithm and simulated annealing for preventive unit maintenance scheduling in power system

Author keywords

[No Author keywords available]

Indexed keywords

CUSTOMER SATISFACTION; ELECTRIC POWER SYSTEMS; PREVENTIVE MAINTENANCE; PROBLEM SOLVING; SIMULATED ANNEALING;

EID: 35348839612     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/pes.2006.1709254     Document Type: Conference Paper
Times cited : (18)

References (9)
  • 1
    • 0016990741 scopus 로고
    • An Experimental Method of Determination of Optimal Maintenance Schedules in Power Systems using the Branch and Bound Technique
    • August
    • Dillon, T.S., Egan, G.T. and Morsztyn, K., "An Experimental Method of Determination of Optimal Maintenance Schedules in Power Systems using the Branch and Bound Technique", IEEE Transactions on Power Systems, Vol. SMC6, No.8, August 1976, pp. 538-547.
    • (1976) IEEE Transactions on Power Systems , vol.SMC6 , Issue.8 , pp. 538-547
    • Dillon, T.S.1    Egan, G.T.2    Morsztyn, K.3
  • 3
    • 0034138977 scopus 로고    scopus 로고
    • Hybrid Evolutionary Techniques for Maintenance Scheduling Problem
    • February
    • E.K.Burke and AJ. Smith., "Hybrid Evolutionary Techniques for Maintenance Scheduling Problem" IEEE Transactions on Power Systems. Vol.15 No. 1.February 2000 pp 122-128.
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.1 , pp. 122-128
    • Burke, E.K.1    Smith, A.J.2
  • 4
    • 0026153980 scopus 로고
    • Maintenance Scheduling by using Simulated Annealing Method IEEE Power Engineering Society
    • June 21
    • T.Satoh, K.Nara., "Maintenance Scheduling by using Simulated Annealing Method" IEEE Power Engineering Society, IEEE/PES 1990 Summer Meeting. June 21,1990 pp 850-856.
    • (1990) IEEE/PES 1990 Summer Meeting , pp. 850-856
    • Satoh, T.1    Nara, K.2
  • 5
    • 0028510852 scopus 로고
    • Short-Term Hydro Thermal Scheduling
    • Semptember
    • K.P.Wong and Y.W.Wong., "Short-Term Hydro Thermal Scheduling" IEE Proceedings, Gener, Transm, Distrib, Vol.141. No.5 Semptember 1994 pp 497-501.
    • (1994) IEE Proceedings, Gener, Transm, Distrib , vol.141 , Issue.5 , pp. 497-501
    • Wong, K.P.1    Wong, Y.W.2
  • 6
    • 26444479778 scopus 로고
    • Optimization by Simulated Annealing
    • 13 may
    • S.Kirkpatrick, C.D.Gelatt and M.P.Vecchi., "Optimization by Simulated Annealing" Science. Vol.220, 13 may 1983, Number 4598 pp 671-680.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 8
    • 35348920342 scopus 로고    scopus 로고
    • X.Wang, J.R and Mc Donald, Modern Power System Planning, McGraw-Hill Book Company, 1993.
    • X.Wang, J.R and Mc Donald, Modern Power System Planning, McGraw-Hill Book Company, 1993.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.