메뉴 건너뛰기




Volumn 2, Issue , 1999, Pages 447-452

Application of genetic algorithms for maintenance scheduling in power systems

Author keywords

[No Author keywords available]

Indexed keywords

GENETIC ALGORITHMS; OPTIMIZATION; SCHEDULING;

EID: 84903294475     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICONIP.1999.845636     Document Type: Conference Paper
Times cited : (21)

References (5)
  • 2
    • 0016990741 scopus 로고
    • An experimental method of determination of optimal maintenance schedules in power systems using the branch-and-bound technique
    • August
    • Dillon, T.S, Egan, G.T. and Morsztyn, K, "An Experimental Method of Determination of Optimal Maintenance Schedules in Power Systems Using the Branch-and-Bound Technique", IEEE Transactions on Systems, Man and Cybernetics, Vol. SMC6, No, 8, August 1976, pp. 538-547
    • (1976) IEEE Transactions on Systems, Man and Cybernetics , vol.SMC6 , Issue.8 , pp. 538-547
    • Dillon, T.S.1    Egan, G.T.2    Morsztyn, K.3
  • 3
    • 0002755938 scopus 로고
    • Schedule optimization using genetic algorithms
    • L. Davis, ed., Van Nostrand Reinhold, N.Y.
    • Syswerda, G "Schedule Optimization Using Genetic Algorithms", Handbook of Genetic Algorithms, L. Davis, ed., Van Nostrand Reinhold, N.Y., 1991, pp. 332-349.
    • (1991) Handbook of Genetic Algorithms , pp. 332-349
    • Syswerda, G.1
  • 5
    • 85041373682 scopus 로고
    • A dynamic frame based maintenance scheduler
    • T. S. Dillon and M. A, Laughton, eds., Prentice Hall, N.Y.
    • Dillon, T.S. and Podbury, C, "A Dynamic Frame Based Maintenance Scheduler", Expert System Applications in Power Systems, T. S. Dillon and M. A, Laughton, eds Prentice Hall, N.Y., 1990, pp. 153-179.
    • (1990) Expert System Applications in Power Systems , pp. 153-179
    • Dillon, T.S.1    Podbury, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.