메뉴 건너뛰기




Volumn 34, Issue 7-8, 2007, Pages 748-761

Work-in-process scheduling by evolutionary tuned fuzzy controllers

Author keywords

Backlog fuzzy control; Evolutionary algorithms; Production systems; Work in process

Indexed keywords

COMPUTER SIMULATION; CONTROL EQUIPMENT; FUZZY CONTROL; HEURISTIC METHODS; OPTIMIZATION; PARAMETER ESTIMATION; SCHEDULING;

EID: 34548633002     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-006-0636-x     Document Type: Article
Times cited : (23)

References (14)
  • 1
    • 0023981046 scopus 로고
    • The role of work-in-process inventory control: Single-part-systems
    • Conway R, Maxwell W, McClain JO, Joseph TL (1988) The role of work-in-process inventory control: single-part-systems. Oper Res 36:229-241
    • (1988) Oper Res , vol.36 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    McClain, J.O.3    Joseph Thomas, L.4
  • 2
    • 0028374441 scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-type systems
    • Bai SX, Gershwin SB (1994) Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems. Int J Prod Res 32:365-386
    • (1994) Int J Prod Res , vol.32 , pp. 365-386
    • Bai, S.X.1    Gershwin, S.B.2
  • 4
    • 0344858917 scopus 로고    scopus 로고
    • Fuzzy work-in-process inventory control of unreliable manufacturing systems
    • Tsourveloudis NC, Dretoulakis E, Ioannidis S (2000) Fuzzy work-in-process inventory control of unreliable manufacturing systems. Inf Sci 127:69-83
    • (2000) Inf Sci , vol.127 , pp. 69-83
    • Tsourveloudis, N.C.1    Dretoulakis, E.2    Ioannidis, S.3
  • 6
    • 0028416608 scopus 로고
    • Production planning and scheduling using a fuzzy decision system
    • Custodio L, Senteiro J, Bispo C (1994) Production planning and scheduling using a fuzzy decision system. IEEE Trans Robot Autom 10:160-168
    • (1994) IEEE Trans Robot Autom , vol.10 , pp. 160-168
    • Custodio, L.1    Senteiro, J.2    Bispo, C.3
  • 9
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jain AK, Elmaraghy HA (1997) Production scheduling/rescheduling in flexible manufacturing. Int J Prod Res 35:281-309
    • (1997) Int J Prod Res , vol.35 , pp. 281-309
    • Jain, A.K.1    Elmaraghy, H.A.2
  • 10
    • 0242364671 scopus 로고    scopus 로고
    • Production scheduling using adaptable fuzzy logic with genetic algorithmss
    • Tedford JD, Lowe C (2003) Production scheduling using adaptable fuzzy logic with genetic algorithms. Int J Prod Res 41:2681-2697
    • (2003) Int J Prod Res , vol.41 , pp. 2681-2697
    • Tedford, J.D.1    Lowe, C.2
  • 12
    • 0007911636 scopus 로고
    • Simultaneous design of membership functions and rule sets for fuzzy controllers using genetic algorithms
    • Homaifar A, McCormick E (1995) Simultaneous design of membership functions and rule sets for fuzzy controllers using genetic algorithms. IEEE Trans Fuzzy Syst 3:129-139
    • (1995) IEEE Trans Fuzzy Syst , vol.3 , pp. 129-139
    • Homaifar, A.1    McCormick, E.2
  • 13
    • 0031077395 scopus 로고    scopus 로고
    • A continuous-flow model for production networks with finite buffers, unreliable machines, and multiple products
    • Kouikoglou VS, Phillis YA (1997) A continuous-flow model for production networks with finite buffers, unreliable machines, and multiple products. Int J Prod Res 35:381-397
    • (1997) Int J Prod Res , vol.35 , pp. 381-397
    • Kouikoglou, V.S.1    Phillis, Y.A.2
  • 14
    • 29844437509 scopus 로고    scopus 로고
    • Modeling and control of a rotary drying process
    • Tsourveloudis NC, Kiralakis L (2005) Modeling and control of a rotary drying process. WSEAS Trans Syst 4:2361-2368
    • (2005) WSEAS Trans Syst , vol.4 , pp. 2361-2368
    • Tsourveloudis, N.C.1    Kiralakis, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.